Oral-History:Bertil Thoren: Difference between revisions

From ETHW
No edit summary
m (Text replacement - "IEEE History Center, Hoboken, NJ" to "IEEE History Center, Piscataway, NJ")
 
(21 intermediate revisions by 4 users not shown)
Line 1: Line 1:
== About Bertil Thorén<br> ==
== About Bertil Thorén  ==


[[Image:Bertil_Thoren_2098(3).jpg|thumb|right|Bertil Thorén, 1996]]Born in Vänersborg, Sweden in 1921, Bertil Thorén demonstrated a childhood interest in science and technology. He studied electrical engineering at the Technical University in Stockholm, and in 1944, earned his master's degree. As military service in Sweden was compulsory, he spent a year in the military before seeking employment, first at ASEA, and then obtaining steady employment at the Ludvika High Voltage and Short Circuit Laboratory as a lab engineer in 1946. His work consisted primarily of testing the breaking capacity of circuit breakers and fuses. In 1950, Thoren went on to receive his doctorate while still working full time. In his thesis he attempted to calculate how much one could deviate from the correct value of current and voltages, a theoretical study which was later used by IEC as a basis when writing its specifications for synthetic testing. Thorén progressed through career stages rapidly. By 1954 he became the manager of the high-power laboratory, where he stayed until the middle of the sixties, when he moved to the Power Systems Consulting Department at Västerås. With this move, Thorén found himself in a completely new area of work, developing computer programs to calculate network performance during short circuits. By the late sixties and early seventies he was lecturing internationally as part of a program to introduce ASEA to various parts of the world.  
[[Image:Bertil Thoren 2098(3).jpg|thumb|left|Bertil Thorén, 1996]]  
 
Born in Vänersborg, Sweden in 1921, Bertil Thorén demonstrated a childhood interest in science and technology. He studied electrical engineering at the Technical University in Stockholm, and in 1944, earned his master's degree. As military service in Sweden was compulsory, he spent a year in the military before seeking employment, first at ASEA, and then obtaining steady employment at the Ludvika High Voltage and Short Circuit Laboratory as a lab engineer in 1946. His work consisted primarily of testing the breaking capacity of circuit breakers and fuses. In 1950, Thoren went on to receive his doctorate while still working full time. In his thesis he attempted to calculate how much one could deviate from the correct value of current and voltages, a theoretical study which was later used by IEC as a basis when writing its specifications for synthetic testing. Thorén progressed through career stages rapidly. By 1954 he became the manager of the high-power laboratory, where he stayed until the middle of the sixties, when he moved to the Power Systems Consulting Department at Västerås. With this move, Thorén found himself in a completely new area of work, developing computer programs to calculate network performance during short circuits. By the late sixties and early seventies he was lecturing internationally as part of a program to introduce ASEA to various parts of the world.  


== About the Interview  ==
== About the Interview  ==
Line 7: Line 9:
BERTIL THOREN: An interview conducted by Frederik Nebeker, Center for the History of Electrical Engineering, 16 July 1996  
BERTIL THOREN: An interview conducted by Frederik Nebeker, Center for the History of Electrical Engineering, 16 July 1996  


<br>
Interview #302 for the Center for the History of Electrical Engineering, The Institute of Electrical and Electronics Engineers, Inc.  
 
Interview #302 for the Center for the History of Electrical Engineering, The Institute of Electrical and Electronics Engineers, Inc., and Rutgers, The State University of New Jersey<br><br>


== Copyright Statement<br> ==
== Copyright Statement  ==


This manuscript is being made available for research purposes only. All literary rights in the manuscript, including the right to publish, are reserved to the IEEE History Center. No part of the manuscript may be quoted for publication without the written permission of the Director of IEEE History Center.  
This manuscript is being made available for research purposes only. All literary rights in the manuscript, including the right to publish, are reserved to the IEEE History Center. No part of the manuscript may be quoted for publication without the written permission of the Director of IEEE History Center.  


<br>Request for permission to quote for publication should be addressed to the IEEE History Center Oral History Program, Rutgers - the State University, 39 Union Street, New Brunswick, NJ 08901-8538 USA. It should include identification of the specific passages to be quoted, anticipated use of the passages, and identification of the user.  
Request for permission to quote for publication should be addressed to the IEEE History Center Oral History Program, IEEE History Center, 445 Hoes Lane, Piscataway, NJ 08854 USA or ieee-history@ieee.org. It should include identification of the specific passages to be quoted, anticipated use of the passages, and identification of the user.  


<br>It is recommended that this oral history be cited as follows:<br>Bertil Thorén, an oral history conducted in 1996 by Frederik Nebeker, IEEE History Center, Rutgers University, New Brunswick, NJ, USA. <br>
It is recommended that this oral history be cited as follows:  


<br>
Bertil Thorén, an oral history conducted in 1996 by Frederik Nebeker, IEEE History Center, Piscataway, NJ, USA.


== Interview  ==
== Interview  ==


INTERVIEW: Bertil Thorén<br>INTERVIEWER: Frederik Nebeker<br>PLACE: Västerås, Sweden<br>DATE: 16 July 1996  
INTERVIEW: Bertil Thorén  
 
INTERVIEWER: Frederik Nebeker  
 
PLACE: Västerås, Sweden  
 
DATE: 16 July 1996  


=== Childhood and education  ===
=== Childhood and education  ===


'''Nebeker:'''<br> I see that you were born in 1921.  
'''Nebeker:'''  
 
I see that you were born in 1921.  
 
'''Thoren:'''
 
Yes.
 
'''Nebeker:'''
 
In Sweden. Where exactly were you born?
 
'''Thoren:'''
 
Vänersborg.
 
'''Nebeker:'''
 
Where is that near?
 
'''Thoren:'''
 
That is not to far away from Göteborg.
 
'''Nebeker:'''
 
I see.
 
'''Thoren:'''
 
But you have a main railway from the Vänern down to Göteborg. At the other end is the town of Vänersborg. That’s where I was born.
 
'''Nebeker:'''
 
Did you go to gymnasium?


<br> '''Thoren:'''<br>Yes.
'''Thoren:'''  


<br> '''Nebeker:'''<br>In Sweden. Where exactly were you born?
I went to gymnasium, but in another place, in Skara. It is not too far away, but it is inland from Göteborg.  


<br> '''Thoren:'''<br>Vänersborg.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>Where is that near?  
Was it always clear that you were interested in science and technology when you were a boy?  


<br> '''Thoren:'''<br>That is not to far away from Göteborg.
'''Thoren:'''  


<br> '''Nebeker:'''<br>I see.  
That’s true. There was no doubt about that.  


<br> '''Thoren:'''<br>But you have a main railway from the Vänern down to Göteborg. At the other end is the town of Vänersborg. That’s where I was born.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>Did you go to gymnasium?  
I see. Did you have a [[Radio|radio]] yourself, a crystal radio, for example, when you were a boy?  


<br> '''Thoren:'''<br>I went to gymnasium, but in another place, in Skara. It is not too far away, but it is inland from Göteborg.
'''Thoren:'''  


<br> '''Nebeker:'''<br>Was it always clear that you were interested in science and technology when you were a boy?
I tried. I bought some pieces and tried to get it to work. But it did not.


<br> '''Thoren:'''<br>That’s true. There was no doubt about that.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>I see. Did you have a radio yourself, a crystal radio, for example, when you were a boy?  
And what did you do when you finished gymnasium?  


<br> '''Thoren:'''<br>I tried. I bought some pieces and tried to get it to work. But it did not.
'''Thoren:'''  


<br> '''Nebeker:'''<br>And what did you do when you finished gymnasium?
I went to the Technical University in Stockholm and studied Electrical Engineering.


<br> '''Thoren:'''<br>I went to the Technical University in Stockholm and studied Electrical Engineering.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>At that time there were two lines, is that right? The weak current and the strong current?  
At that time there were two lines, is that right? The weak current and the strong current?  


<br> '''Thoren:'''<br>Mainly, yes. I took the strong current.
'''Thoren:'''  


<br> '''Nebeker:'''<br>You were always interested in that type of engineering?
Mainly, yes. I took the strong current.


<br> '''Thoren:'''<br>Yes. Not so much in electronics. It was a difficult to understand the radio tubes, but the power engineering interested me.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>Oh, I should have asked about your family background, what your father did.
You were always interested in that type of engineering?


<br> '''Thoren:'''<br>My father started out as a military man. My whole family were farmers rather close to where I was born, Vänersborg. I’ve done a lot of studies on my ancestors, so I know most of it. They were farmers, but my father had seven brothers. They couldn’t all take over the farm, so he had to do something else. My father had no theoretical education, so he went to the Army, and made it the long way up.
'''Thoren:'''  


<br> '''Nebeker:'''<br>Oh, from the ranks, so to speak?
Yes. Not so much in electronics. It was a difficult to understand the radio tubes, but the power engineering interested me.


<br> '''Thoren:'''<br>Yes, yes. When I was born he was what was called an under-officer, which is not officer but below it.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>I see you earned your Masters Degree in 1944.  
Oh, I should have asked about your family background, what your father did.  


<br> '''Thoren:'''<br>Yes, yes.  
'''Thoren:'''  
 
My father started out as a military man. My whole family were farmers rather close to where I was born, Vänersborg. I’ve done a lot of studies on my ancestors, so I know most of it. They were farmers, but my father had seven brothers. They couldn’t all take over the farm, so he had to do something else. My father had no theoretical education, so he went to the Army, and made it the long way up.
 
'''Nebeker:'''
 
Oh, from the ranks, so to speak?
 
'''Thoren:'''
 
Yes, yes. When I was born he was what was called an under-officer, which is not officer but below it.
 
'''Nebeker:'''
 
I see you earned your Masters Degree in 1944.
 
'''Thoren:'''
 
Yes, yes.  


=== Military service and engineering employment at High Voltage and Short Circuit Laboratory  ===
=== Military service and engineering employment at High Voltage and Short Circuit Laboratory  ===


'''Nebeker:'''<br>Did you take employment at that point?  
'''Nebeker:'''  
 
Did you take employment at that point?  
 
'''Thoren:'''
 
Military service.
 
'''Nebeker:'''
 
I see, you had military service.
 
'''Thoren:'''


<br> '''Thoren:'''<br>Military service.  
It was compulsory at that time, so I had to go for one year of military service between ‘44 and ‘45.  


<br> '''Nebeker:'''<br>I see, you had military service.
'''Nebeker:'''  


<br> '''Thoren:'''<br>It was compulsory at that time, so I had to go for one year of military service between ‘44 and ‘45.  
Yes, I know that was a tense time for Sweden because it was trying to stay out of the War.  


<br> '''Nebeker:'''<br>Yes, I know that was a tense time for Sweden because it was trying to stay out of the War.
'''Thoren:'''  


<br> '''Thoren:'''<br>Oh yes. You know, I had problems at that time with my hearing, and today they wouldn’t allow me in military service, but at that time they took everybody. So I spent a year there, and then I went to ASEA, and started there in March ‘45. They had a course for young engineers which meant that you stayed for two months at each department, and went around. That was a very useful time.  
Oh yes. You know, I had problems at that time with my hearing, and today they wouldn’t allow me in military service, but at that time they took everybody. So I spent a year there, and then I went to ASEA, and started there in March ‘45. They had a course for young engineers which meant that you stayed for two months at each department, and went around. That was a very useful time.  


<br> '''Nebeker:'''<br>Where were you working? Was that in Västerås?
'''Nebeker:'''  


<br> '''Thoren:'''<br>In Västerås, yes. Then in early ‘46 I got steady employment at Ludvika, at the High Voltage and Short Circuit Laboratory as a laboratory engineer.
Where were you working? Was that in Västerås?


<br> '''Nebeker:'''<br>That sounds like a very desirable position for a young engineer.
'''Thoren:'''  


<br> '''Thoren:'''<br>For a young engineer, yes. It was not in my intention to go that way, but I liked it, so I stayed.  
In Västerås, yes. Then in early ‘46 I got steady employment at Ludvika, at the High Voltage and Short Circuit Laboratory as a laboratory engineer.  


<br> '''Nebeker:'''<br>What sort of work exactly? Can you recall what the projects were at that laboratory?
'''Nebeker:'''  


<br> '''Thoren:'''<br>Oh, at the Short Circuit Laboratory we were testing circuit breakers, fuses, current [[Transformers|transformers]], and ordinary transformers. We studied short circuits, the ability to withstand short circuits, and the breaking capacity of circuit breakers and fuses. That was the main job.  
That sounds like a very desirable position for a young engineer.  


=== <br>Product development at Ludvika<br>  ===
'''Thoren:'''


'''Nebeker:'''<br>Was the principle testing laboratory for ASEA at Ludvika there?
For a young engineer, yes. It was not in my intention to go that way, but I liked it, so I stayed.


<br> '''Thoren:'''<br>At Ludvika, yes. It was a rather big laboratory and did mainly development testing.  
'''Nebeker:'''
 
What sort of work exactly? Can you recall what the projects were at that laboratory?
 
'''Thoren:'''
 
Oh, at the Short Circuit Laboratory we were testing circuit breakers, fuses, current [[Transformers|transformers]], and ordinary transformers. We studied short circuits, the ability to withstand short circuits, and the breaking capacity of circuit breakers and fuses. That was the main job.
 
=== Product development at Ludvika  ===
 
'''Nebeker:'''
 
Was the principle testing laboratory for ASEA at Ludvika there?
 
'''Thoren:'''  
 
At Ludvika, yes. It was a rather big laboratory and did mainly development testing.  


We didn't do much testing for the workshops. Sometimes we did, because we had the facilities, but normally not.  
We didn't do much testing for the workshops. Sometimes we did, because we had the facilities, but normally not.  


<br> '''Nebeker:'''<br>So you worked on new products.
'''Nebeker:'''  


<br> '''Thoren:'''<br>New products.  
So you worked on new products.  


<br> '''Nebeker:'''<br>Were some of them being developed there at Ludvika? New circuit breakers, or new transformers or insulators?
'''Thoren:'''  


<br> '''Thoren:'''<br>Yes. I worked especially with circuit breakers. That was the main job.  
New products.  


<br> '''Nebeker:'''<br>Who was the leader of the group that you worked for?
'''Nebeker:'''  


<br> '''Thoren:'''<br>Mr. Bükman handled the laboratory at that time. <br>
Were some of them being developed there at Ludvika? New circuit breakers, or new transformers or insulators?


'''Nebeker:'''<br>How large was that laboratory?
'''Thoren:'''  


<br> '''Thoren:'''<br>Number of people?
Yes. I worked especially with circuit breakers. That was the main job.


<br> '''Nebeker:'''<br>A dozen people?
'''Nebeker:'''  


<br> '''Thoren:'''<br>No, no, no.
Who was the leader of the group that you worked for?


<br> '''Nebeker:'''<br>Or just a …
'''Thoren:'''  


<br> '''Thoren:'''<br>Maybe a couple of hundred.  
Mr. Bükman handled the laboratory at that time.  


<br> '''Nebeker:'''<br>Oh, my goodness, so very large.
'''Nebeker:'''  


<br> '''Thoren:'''<br>Yes, it’s fairly large. They did a lot of development work. For instance, for the 400 KV system of Sweden, which was the first in the world, the equipment was mainly developed in that laboratory.
How large was that laboratory?


<br> '''Nebeker:'''<br>Is that right?
'''Thoren:'''  


<br> '''Thoren:'''<br>The high voltage part.
Number of people?


<br> '''Nebeker:'''<br>When was that system implemented?
'''Nebeker:'''  


<br> '''Thoren:'''<br>‘54.
A dozen people?


<br> '''Nebeker:'''<br>’54.
'''Thoren:'''  


<br> '''Thoren:'''<br>Oh, sorry, ‘52.  
No, no, no.  


<br> '''Nebeker:'''<br>’52.
'''Nebeker:'''  


<br> '''Thoren:'''<br>‘52. And that was a line from the northern part of Sweden down to about this area.
Or just a


<br> '''Nebeker:'''<br>You said you started work there in ‘45, was it?
'''Thoren:'''  


<br> '''Thoren:'''<br>Yes, ‘46.  
Maybe a couple of hundred.  


<br> '''Nebeker:'''<br>Oh, that’s right. You had that period when you were in different departments and in ‘46 you started in that laboratory.
'''Nebeker:'''  


<br> '''Thoren:'''<br>Yes, yes.  
Oh, my goodness, so very large.  


=== <br>Management position at high-power laboratory and doctoral studies<br>  ===
'''Thoren:'''


'''Nebeker:'''<br>How long did you stay there?
Yes, it’s fairly large. They did a lot of development work. For instance, for the 400 KV system of Sweden, which was the first in the world, the equipment was mainly developed in that laboratory.


<br> '''Thoren:'''<br>Well, part of it in ‘54, because that laboratory was split in two parts: a high-power laboratory and high-voltage laboratory. I became the manager of the high-power laboratory.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>Okay, I see.
Is that right?


<br> '''Thoren:'''<br>That was a very interesting time, because we built a completely new lab at that time. It wasn’t at Ludvika, but at a different place, and that kept me busy for a number of years.
'''Thoren:'''  


<br> '''Nebeker:'''<br>Yes, well, that sounds like a very rapid advance from starting there in ‘46 to being head of a laboratory in ‘54.  
The high voltage part.  


<br> '''Thoren:'''<br>Well, you know, it was just that progress through career stages was rather rapid. Nowadays there are so many engineers. At that time we were just a few engineers, and you had a chance to get on very rapidly.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>I see that you received your doctor’s degree, the Licentiate, in 1950. Is that right?  
When was that system implemented?  


<br> '''Thoren:'''<br>Yes, yes.
'''Thoren:'''  


<br> '''Nebeker:'''<br>What was your thesis for that?
'54.


<br> '''Thoren:'''<br>Well, I did my work in parallel with my ordinary job.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>Right.  
'54.  


<br> '''Thoren:'''<br>At the laboratory.
'''Thoren:'''  


<br> '''Nebeker:'''<br>So you worked full time throughout?
Oh, sorry, '52.


<br> '''Thoren:'''<br>I worked full time, and studied in the evenings.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>I see. This is Transactions of the Royal Institute of Technology, Number 87, 1955, entitled “Synthetic Methods for Interruption Tests on Circuit Breakers.
'52.  


<br> '''Thoren:'''<br>I don’t know if that tells you anything at all.
'''Thoren:'''  


<br> '''Nebeker:'''<br>Well, not very much.  
'52. And that was a line from the northern part of Sweden down to about this area.  


<br> '''Thoren:'''<br>No. The deal is the following: When you test a circuit breaker you put on voltage and current, and normally from the same source, a high-power [[Generators|generator]] is needed. Now you cannot always do that because of a lack of power. You don’t have that big high-powered generator. So the general idea in circuit testing is to split it up. You put on current from one source and voltage from another source. Then you can use a current source of very low voltage, and a high voltage source with very low current, so that the power of each of these sources is much reduced. That’s the idea.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>You could, nevertheless, learn the behavior under high voltage, high current.
You said you started work there in '45, was it?


<br> '''Thoren:'''<br>Yes. What I did was mainly a theoretic study of this, because before, in the '30s and '40s, there were wild ideas about what multiplication factor you can get for the circuit voltage. I did a theoretical study of that, and it showed, first of all, that the multiplication factor was one, or should be very, very, very close to it. Well anyhow, you can always do with some deviation from the 100 percent. And what I tried to calculate was how much you could deviate from the correct value of current and voltages. I found that you could do some. You could test circuit breakers with a breaking capacity of say, five times that of the laboratory, roughly speaking. It depends a little upon the design of the circuit breakers and so on. So that was my thesis.
'''Thoren:'''  


<br> '''Nebeker:'''<br>This was a mainly theoretical study you said?
Yes, '46.


<br> '''Thoren:'''<br>It’s mainly stuff. I did some practical work, too. I designed a synthetic circuit, but not a very big one. They didn’t give me access to the main short-circuit generator, but I used some smaller ones, and tried to find out if the theory was right.
'''Nebeker:'''  


<br> '''Nebeker:'''<br>Was there agreement?
Oh, that’s right. You had that period when you were in different departments and in '46 you started in that laboratory.


<br> '''Thoren:'''<br>Yes, yes, within the limit I had calculated. Later on, when I had left that area, the IEC started writing its specifications for synthetic testing, and I know enough that they used my thesis as a basis.
'''Thoren:'''  


<br> '''Nebeker:'''<br>When did they start looking at synthetic methods?
Yes, yes.


<br> '''Thoren:'''<br>In the middle of the fifties or something like that.
=== Management position at high-power laboratory and doctoral studies  ===


<br> '''Nebeker:'''<br>Was this one of the first studies of such methods?
'''Nebeker:'''  


<br> '''Thoren:'''<br>Yes, at that time it was the first to be as thorough as it was.
How long did you stay there?


<br> '''Nebeker:'''<br>Did you come across this problem in your work there, so that it was obvious that a solution would be valuable?
'''Thoren:'''  


<br> '''Thoren:'''<br>Well, I came across it, actually, when I started my job at the Short Circuit Laboratory, because the power there was not sufficient for testing. Breakers were being developed at that time, so something had to be done. I looked at the previous literature and synthetic testing seemed a good proposition.  
Well, part of it in '54, because that laboratory was split in two parts: a high-power laboratory and high-voltage laboratory. I became the manager of the high-power laboratory.  


<br> '''Nebeker:'''<br>So this had some real influence on practice?
'''Nebeker:'''  


<br> '''Thoren:'''<br>It had some influence. I was happy to learn that people have checked my calculations and they were okay.  
Okay, I see.  


<br> '''Nebeker:'''<br>Well, that is a compliment, because there are so many theses that no one else reads.
'''Thoren:'''  


<br> '''Thoren:'''<br>But I left that field in the middle of ‘54 when I became manager of the High Power Laboratory. I had to build a new lab and that took all my time.  
That was a very interesting time, because we built a completely new lab at that time. It wasn’t at Ludvika, but at a different place, and that kept me busy for a number of years.  


<br> '''Nebeker:'''<br>So you completed this degree in 1950, and in ‘54 you became head of the lab
'''Nebeker:'''  


<br> '''Thoren:'''<br>Yes. There were no means of applying it then at that university. It was in '54 that they accepted it for publication. I wrote my papers on a typewriter and handed it in, and they accepted it.  
Yes, well, that sounds like a very rapid advance from starting there in ‘46 to being head of a laboratory in ‘54.  


<br> '''Nebeker:'''<br>That must have been difficult with all these equations to do that with a typewriter.
'''Thoren:'''  


<br> '''Thoren:'''<br>No, not at all. You leave space and do it by hand.  
Well, you know, it was just that progress through career stages was rather rapid. Nowadays there are so many engineers. At that time we were just a few engineers, and you had a chance to get on very rapidly.  


=== <br> Management position, Power Systems Consulting Department at Västerås  ===
'''Nebeker:'''


'''Nebeker:'''<br>I’m just looking at your curriculum vitae here.  
I see that you received your doctor’s degree, the Licentiate, in 1950. Is that right?


<br> '''Thoren:'''<br>Well, to go on, I stayed with the high power laboratory until the middle of the sixties. By then the new lab was in operation. I had put a lot of effort to improve testing and measuring methods, so everybody was fine. Then I found that I had nothing more to do there. At the same time there came an opportunity for me to move to Västerås and start a completely new area of work. At that time computers were coming into use, allowing people to calculate what happens in the networks during short circuits, lightening, and so on. That had been done earlier by hand. Now it could be done by computer. There was a big interest in such calculations. So it was decided to start a small department with highly qualified specialists in these areas. I became the manager of that. We did a lot of work on computer programs.
'''Thoren:'''  


<br> '''Nebeker:'''<br>This is – I’m reading here – the Power Systems Consulting Department at Västerås.<br>
Yes, yes.  


<br>
'''Nebeker:'''


'''Thoren:'''<br>Yes. Now that started in that way, but they still had specialists in different areas, stability, high voltage, and things like that. Some of these were put together in this consulting department. Our work there was to develop computer programs, and then we worked for different departments within ASEA to make computations for them.<br>
What was your thesis for that?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Do you recall what computers you had there in the beginning and in the mid-sixties? The IBM 360 came out about that time? It doesn’t matter.<br>
Well, I did my work in parallel with my ordinary job.  


<br>
'''Nebeker:'''


'''Thoren:'''<br>I don’t know that because the computers were handled by another department. We just had access to them.<br>
Right.  


<br>
'''Thoren:'''


=== Influence of computers on networks and on network component design<br>  ===
At the laboratory.


'''Nebeker:'''<br>That started in 1965, and you say that was a new approach to study this using the computer?<br>
'''Nebeker:'''  


<br>
So you worked full time throughout?


'''Thoren:'''<br>Yes, it was a new approach, because you’ve got means to calculate things, and of course, it was very simple to start with. But it became more and more sophisticated. Nowadays they calculate very accurately what happens in a network during a short circuit, or when a lightening flash comes across, or things like that.<br>
'''Thoren:'''  


<br>
I worked full time, and studied in the evenings.


'''Nebeker:'''<br>From the viewpoint of the consumer of electricity, such studies are important, I assume, because the network can be run more efficiently?<br>
'''Nebeker:'''  


<br>
I see. This is Transactions of the Royal Institute of Technology, Number 87, 1955, entitled “Synthetic Methods for Interruption Tests on Circuit Breakers.”


'''Thoren:'''<br>Yes, more safely.<br>
'''Thoren:'''  


<br>
I don’t know if that tells you anything at all.


'''Nebeker:'''<br>With fewer outages and …<br>
'''Nebeker:'''  


<br>
Well, not very much.


'''Thoren:'''<br>Yes, now you can reduce load or something like that. So that’s very valuable. As soon as these means became available, the customers started to require it. They requested us to do calculations to prove that a certain generator was suitable for a certain place in a network. The most efficient way of doing it depends on the system.<br>
'''Thoren:'''  


<br>
{{Audio|desc=MP3 Audio|file=302 - thoren - clip 1.mp3}}


'''Nebeker:'''<br>Oh, so some of these studies that your group was doing there were for customers of ASEA in other countries? Or was it mainly Sweden?<br>
No. The deal is the following: When you test a circuit breaker you put on voltage and current, and normally from the same source, a high-power [[Generators|generator]] is needed. Now you cannot always do that because of a lack of power. You don’t have that big high-powered generator. So the general idea in circuit testing is to split it up. You put on current from one source and voltage from another source. Then you can use a current source of very low voltage, and a high voltage source with very low current, so that the power of each of these sources is much reduced. That’s the idea.


<br>
'''Nebeker:'''


'''Thoren:'''<br>They were done for customers in other countries, too, but through other departments. We did some work directly for a customer, but not very much. It was mainly done for our design departments. The sales department especially who wanted to have that information.<br>
You could, nevertheless, learn the behavior under high voltage, high current.  


<br>
'''Thoren:'''


'''Nebeker:'''<br>Did the computer make any difference in the design process of things like circuit breakers and lightening arresters, and so on?<br>
Yes. What I did was mainly a theoretic study of this, because before, in the '30s and '40s, there were wild ideas about what multiplication factor you can get for the circuit voltage. I did a theoretical study of that, and it showed, first of all, that the multiplication factor was one, or should be very, very, very close to it. Well anyhow, you can always do with some deviation from the 100 percent. And what I tried to calculate was how much you could deviate from the correct value of current and voltages. I found that you could do some. You could test circuit breakers with a breaking capacity of say, five times that of the laboratory, roughly speaking. It depends a little upon the design of the circuit breakers and so on. So that was my thesis.


<br>
'''Nebeker:'''


'''Thoren:'''<br>Oh, yes, especially lightening arresters. Circuit breakers, not so much, because it’s very difficult to do any theoretic calculations. People still have no algorithm for a circuit breaker. Many have tried.<br>
This was a mainly theoretical study you said?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Is that right?<br>
It’s mainly stuff. I did some practical work, too. I designed a synthetic circuit, but not a very big one. They didn’t give me access to the main short-circuit generator, but I used some smaller ones, and tried to find out if the theory was right.


<br>
'''Nebeker:'''


'''Thoren:'''<br>Even me. I used that as a basis here for calculating the multiplication factor, but it depends very much upon the algorithm. Theoretically, there are still no good formulas, but of course, the computer will calculate the short circuit current at a certain site. It will also calculate the recovery voltage. You know, when you break up a short circuit, the voltage from the network will strike back in a way. Now it's very important for the circuit breaker to know what that voltage will look like in magnitude, state, and things like that. Computers can calculate that, which helps the designers to design the circuit breakers and especially to check alternative designs. So it was very valuable in that way.<br>
Was there agreement?


<br>
'''Thoren:'''


'''Nebeker:'''<br>So for the network as a whole, the computer was valuable. For designing the individual components and arranging them into the network, it was useful.<br>
Yes, yes, within the limit I had calculated. Later on, when I had left that area, the IEC started writing its specifications for synthetic testing, and I know enough that they used my thesis as a basis.  


<br>
'''Nebeker:'''


'''Thoren:'''<br>Yes.<br>
When did they start looking at synthetic methods?


<br>
'''Thoren:'''


'''Nebeker:'''<br>So that started in ‘65?<br>
In the middle of the fifties or something like that.


<br>
'''Nebeker:'''


'''Thoren:'''<br>It started in ’65 to a small extent at Västerås, and then I went to Ludvika in ‘67. I had a few people working for me here, and then we moved to Ludvika because that was the place where the high-voltage equipment was made.<br>
Was this one of the first studies of such methods?


<br>
'''Thoren:'''


=== Research publication, international influence<br>  ===
Yes, at that time it was the first to be as thorough as it was.


'''Nebeker:'''<br>In 1960 you published a couple of articles about the ASEA high power laboratory at Ludvika. <br>
'''Nebeker:'''  


<br>
Did you come across this problem in your work there, so that it was obvious that a solution would be valuable?


'''Thoren:'''<br>Yes.<br>
'''Thoren:'''  


<br>
Well, I came across it, actually, when I started my job at the Short Circuit Laboratory, because the power there was not sufficient for testing. Breakers were being developed at that time, so something had to be done. I looked at the previous literature and synthetic testing seemed a good proposition.


'''Nebeker:'''<br>Did this new laboratory that you built attract attention from other countries?<br>
'''Nebeker:'''  


<br>
So this had some real influence on practice?


'''Thoren:'''<br>Well, it always does. We had a number of visitors coming there, looking at it.<br>
'''Thoren:'''  


<br>
It had some influence. I was happy to learn that people have checked my calculations and they were okay.


'''Nebeker:'''<br>Well, I know that Swedish High Voltage engineering has always been pioneering.<br>
'''Nebeker:'''  


<br>
Well, that is a compliment, because there are so many theses that no one else reads.


'''Thoren:'''<br>Well, I must say, I’m not a computer man, so I didn’t do any of the computation myself. I had skilled people who could do that, and I was mainly used for other things within ASEA. You see, at that time ASEA went abroad much more than they had done before. I’m now talking about the end of the sixties, early seventies. We found that people didn’t know ASEA as well as we did in Västerås, so the company put on a program to introduce ASEA in different parts of the world. I took part in that, giving lectures in most countries in the world.<br>
'''Thoren:'''  


<br>
But I left that field in the middle of ‘54 when I became manager of the High Power Laboratory. I had to build a new lab and that took all my time.


'''Nebeker:'''<br>Is that right? <br>
'''Nebeker:'''  


<br>
So you completed this degree in 1950, and in ‘54 you became head of the lab


'''Thoren:'''<br>Yes.<br>
'''Thoren:'''  


<br>
Yes. There were no means of applying it then at that university. It was in '54 that they accepted it for publication. I wrote my papers on a typewriter and handed it in, and they accepted it.


'''Nebeker:'''<br>This was in the late sixties you said?<br>
'''Nebeker:'''  


<br>
That must have been difficult with all these equations to do that with a typewriter.


'''Thoren:'''<br>Starting in the late sixties, and then the seventies was the main time when I did lecturing.<br>
'''Thoren:'''  


<br>
No, not at all. You leave space and do it by hand.


'''Nebeker:'''<br>I see. So this would be lecturing at technical institutes or power utilities?<br>
=== Management position, Power Systems Consulting Department at Västerås  ===


<br>
'''Nebeker:'''


'''Thoren:'''<br>It was very different. We planned symposia where we invited customers. Some lectures were given at the site of the customers, and also at different places. That brought me around the world. I had the chance to get around to different technical societies, which invited me to give lectures. It was a quite interesting time.<br>
I’m just looking at your curriculum vitae here.  


<br>
'''Thoren:'''


'''Nebeker:'''<br>Can you tell me a little bit about ASEA from your point of view. You mentioned something I didn’t know, that they started selling abroad much more in the late sixties and seventies.<br>
Well, to go on, I stayed with the high power laboratory until the middle of the sixties. By then the new lab was in operation. I had put a lot of effort to improve testing and measuring methods, so everybody was fine. Then I found that I had nothing more to do there. At the same time there came an opportunity for me to move to Västerås and start a completely new area of work. At that time computers were coming into use, allowing people to calculate what happens in the networks during short circuits, lightening, and so on. That had been done earlier by hand. Now it could be done by computer. There was a big interest in such calculations. So it was decided to start a small department with highly qualified specialists in these areas. I became the manager of that. We did a lot of work on computer programs.  


<br>
'''Nebeker:'''


'''Thoren:'''<br>Yes. They sold abroad before that, but mainly separate components: generators, transformers, and things like that. But now, in the sixties, people were asking for…<br>
This is – I’m reading here – the Power Systems Consulting Department at Västerås.  


<br>
'''Thoren:'''


'''Nebeker:'''<br>Full systems?<br>
Yes. Now that started in that way, but they still had specialists in different areas, stability, high voltage, and things like that. Some of these were put together in this consulting department. Our work there was to develop computer programs, and then we worked for different departments within ASEA to make computations for them.


<br>
'''Nebeker:'''


'''Thoren:'''<br>Yes.<br>
Do you recall what computers you had there in the beginning and in the mid-sixties? The IBM 360 came out about that time? It doesn’t matter.  


<br>
'''Thoren:'''


=== Work environment at ASEA<br>  ===
I don’t know that because the computers were handled by another department. We just had access to them.


'''Nebeker:'''<br>How was ASEA as an employer? Were you always happy with the company? <br>
=== Influence of computers on networks and on network component design  ===


<br>
'''Nebeker:'''


'''Thoren:'''<br>For most of the time, except for the salary. Otherwise I liked to work with ASEA. You got good opportunities to do different things, and you could change your job if you wanted, so you weren’t stuck there to just design transformers for all your life.<br>
That started in 1965, and you say that was a new approach to study this using the computer?


<br>
'''Thoren:'''


'''Nebeker:'''<br>So a person could request to move to another job?<br>
Yes, it was a new approach, because you’ve got means to calculate things, and of course, it was very simple to start with. But it became more and more sophisticated. Nowadays they calculate very accurately what happens in a network during a short circuit, or when a lightening flash comes across, or things like that.


<br>
'''Nebeker:'''


'''Thoren:'''<br>Oh, yes. You could request and very often you could go to a new area.<br>
From the viewpoint of the consumer of electricity, such studies are important, I assume, because the network can be run more efficiently?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Did they have programs for further education of the engineers within the company?<br>
Yes, more safely.


<br>
'''Nebeker:'''


'''Thoren:'''<br>Not very much at that time, to start with. They had that course for young engineers. It was a one-year course. After that there were no regular courses, but now and then someone arranged for a course. Usually within a department they were giving lectures about the equipment they were manufacturing. Later on it became more common to have courses. I had a course for insulation coordination: how to run the network based on information about different surges and the impact on the equipment and so on. Today I know there are numerous courses that are arranged in a much better way, but when I started at ASEA it was left to private people to arrange something that might be useful.<br>
With fewer outages and


<br>
'''Thoren:'''


'''Nebeker:'''<br>Was there generally good morale among the employees of ASEA?<br>
Yes, now you can reduce load or something like that. So that’s very valuable. As soon as these means became available, the customers started to require it. They requested us to do calculations to prove that a certain generator was suitable for a certain place in a network. The most efficient way of doing it depends on the system.


<br>
'''Nebeker:'''


'''Thoren:'''<br>Yes, yes, very.<br>
Oh, so some of these studies that your group was doing there were for customers of ASEA in other countries? Or was it mainly Sweden?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Did people tend to stay with the company their whole career?<br>
They were done for customers in other countries, too, but through other departments. We did some work directly for a customer, but not very much. It was mainly done for our design departments. The sales department especially who wanted to have that information.


<br>
'''Nebeker:'''


'''Thoren:'''<br>Many people did. Some people went to the Swedish State Power Board, for instance. They were often recruiting engineers from ASEA. And some, of course, went to other companies, but generally speaking, quite many of them stayed.<br>
Did the computer make any difference in the design process of things like circuit breakers and lightening arresters, and so on?


<br>
'''Thoren:'''


=== Transition to high-voltage system<br>  ===
Oh, yes, especially lightening arresters. Circuit breakers, not so much, because it’s very difficult to do any theoretic calculations. People still have no algorithm for a circuit breaker. Many have tried.


'''Nebeker:'''<br>How much of the work that you were involved with was related to this moving to higher voltages? <br>
'''Nebeker:'''  


<br>
Is that right?


'''Thoren:'''<br>Most of it later on.<br>
'''Thoren:'''  


<br>
Even me. I used that as a basis here for calculating the multiplication factor, but it depends very much upon the algorithm. Theoretically, there are still no good formulas, but of course, the computer will calculate the short circuit current at a certain site. It will also calculate the recovery voltage. You know, when you break up a short circuit, the voltage from the network will strike back in a way. Now it's very important for the circuit breaker to know what that voltage will look like in magnitude, state, and things like that. Computers can calculate that, which helps the designers to design the circuit breakers and especially to check alternative designs. So it was very valuable in that way.


'''Nebeker:'''<br>I’m sure all components have to be redesigned.<br>
'''Nebeker:'''  


<br>
So for the network as a whole, the computer was valuable. For designing the individual components and arranging them into the network, it was useful.


'''Thoren:'''<br>Yes. Sweden started high-voltage with a 400 k-volt system, you know, inaugurated in ‘52. Then, in the sixties or the seventies, we found that we would have use for 800 KV, which had been started by the Canadians out of Quebec with the first lines in the area of 735 KV. So we had a joint talk with the Swedish state power board designing lines and equipment for 800 KV for Swedish systems.<br>
'''Thoren:'''  


<br>
Yes.


'''Nebeker:'''<br>Was this in the late fifties, roughly?<br>
'''Nebeker:'''  


<br>
So that started in ‘65?


'''Thoren:'''<br>No, in the late sixties and early seventies. That came to the sore end.<br>
'''Thoren:'''  


<br>
It started in ’65 to a small extent at Västerås, and then I went to Ludvika in ‘67. I had a few people working for me here, and then we moved to Ludvika because that was the place where the high-voltage equipment was made.


'''Nebeker:'''<br>Can you tell me a little about that?<br>
=== Research publication, international influence  ===


<br>
'''Nebeker:'''


'''Thoren:'''<br>Yes, that’s historically interesting, because the idea was that the first line should go from a nuclear power station north of Stockholm, down to the Stockholm area, about this area here. And actually, the line was designed and built, but it was never operated at 800 KV for political reasons. We had a Prime Minister at that time who belonged to the Farmers Party, and he didn’t know anything about technical things. Somebody had got it into his head that this 800 KV line going from the nuclear power station would carry nuclear energy. It was so ridiculous, but that’s the way it was. At the time, the Prime Minister was absolutely against nuclear power. None of the nuclear power stations were built were built during his time. He said no go to this 800 KV. So the State Power Board had to rebuild the line to a double circuit 400 KV, and that is how it is today. Of course, that works just fine, but it’s more costly.<br>
In 1960 you published a couple of articles about the ASEA high power laboratory at Ludvika.  


<br>
'''Thoren:'''


'''Nebeker:'''<br>Was it pretty much his own decision, or did this become a larger political issue?<br>
Yes.


<br>
'''Nebeker:'''


'''Thoren:'''<br>It became a political issue.<br>
Did this new laboratory that you built attract attention from other countries?


<br>
'''Thoren:'''


'''Nebeker:'''<br>You’re telling me the main opposition came from people who thought that somehow nuclear energy would come through this line?<br>
Well, it always does. We had a number of visitors coming there, looking at it.


<br>
'''Nebeker:'''


'''Thoren:'''<br>Yes, they thought it would be dangerous because of the nuclear power. That’s how the rumors went. So we had to abandon that.<br>
Well, I know that Swedish High Voltage engineering has always been pioneering.  


<br>
'''Thoren:'''


'''Nebeker:'''<br>There were no other 800 KV lines built in Sweden?<br>
Well, I must say, I’m not a computer man, so I didn’t do any of the computation myself. I had skilled people who could do that, and I was mainly used for other things within ASEA. You see, at that time ASEA went abroad much more than they had done before. I’m now talking about the end of the sixties, early seventies. We found that people didn’t know ASEA as well as we did in Västerås, so the company put on a program to introduce ASEA in different parts of the world. I took part in that, giving lectures in most countries in the world.


<br>
'''Nebeker:'''


'''Thoren:'''<br>No. That was the end of it.<br>
Is that right?


<br>
'''Thoren:'''


'''Nebeker:'''<br>So 400 KV is the highest?<br>
Yes.


<br>
'''Nebeker:'''


'''Thoren:'''<br>It’s the highest, yes. And it operates fine. Many of those lines were built. Not only the nuclear power, but also the influence on the general public of the electric field was a big issue at that time.<br>
This was in the late sixties you said?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Yes, that’s been a big issue in the United States.<br>
Starting in the late sixties, and then the seventies was the main time when I did lecturing.  


<br>
'''Nebeker:'''


'''Thoren:'''<br>It still is in many places. And the funny thing is that the fields around the 400 KV line are higher than the fields around a 800 KV line, because the 800 KV is higher up. It’s a longer distance from the ground to the line.<br>
I see. So this would be lecturing at technical institutes or power utilities?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Is that right?<br>
It was very different. We planned symposia where we invited customers. Some lectures were given at the site of the customers, and also at different places. That brought me around the world. I had the chance to get around to different technical societies, which invited me to give lectures. It was a quite interesting time.


<br>
'''Nebeker:'''


'''Thoren:'''<br>The whole thing is so ridiculous. You could laugh at it, but...<br>
Can you tell me a little bit about ASEA from your point of view. You mentioned something I didn’t know, that they started selling abroad much more in the late sixties and seventies.  


<br>
'''Thoren:'''


'''Nebeker:'''<br>It must have been a big disappointment to the engineers who designed that 800 KV line.<br>
Yes. They sold abroad before that, but mainly separate components: generators, transformers, and things like that. But now, in the sixties, people were asking for…


<br>
'''Nebeker:'''


'''Thoren:'''<br>Of course. There is a description of that whole 800 KV system somewhere here.<br>
Full systems?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Maybe you can point it out to me. I see. Gunnar Janke [spelling?] was the name.<br>
Yes.  


<br>
=== Work environment at ASEA  ===


'''Thoren:'''<br>He’s dead now.<br>
'''Nebeker:'''  


<br>
How was ASEA as an employer? Were you always happy with the company?


'''Nebeker:'''<br>Yes, I’d hoped to talk to him. <br>
'''Thoren:'''  


<br>
For most of the time, except for the salary. Otherwise I liked to work with ASEA. You got good opportunities to do different things, and you could change your job if you wanted, so you weren’t stuck there to just design transformers for all your life.


'''Thoren:'''<br>That’s a description of how it should have been.<br>
'''Nebeker:'''  


<br>
So a person could request to move to another job?


'''Nebeker:'''<br>Can you tell me what part you played in designing that 800 KV system?<br>
'''Thoren:'''  


<br>
Oh, yes. You could request and very often you could go to a new area.


'''Thoren:'''<br>Well, in the computer department we did a lot of studies of all the voltages of the line. My part was not a very big one, because it was handled by designers.<br>
'''Nebeker:'''  


<br>
Did they have programs for further education of the engineers within the company?


=== Laboratory direction<br>  ===
'''Thoren:'''


'''Nebeker:'''<br>So fairly early in your career you became a director, a laboratory director?<br>
Not very much at that time, to start with. They had that course for young engineers. It was a one-year course. After that there were no regular courses, but now and then someone arranged for a course. Usually within a department they were giving lectures about the equipment they were manufacturing. Later on it became more common to have courses. I had a course for insulation coordination: how to run the network based on information about different surges and the impact on the equipment and so on. Today I know there are numerous courses that are arranged in a much better way, but when I started at ASEA it was left to private people to arrange something that might be useful.


<br>
'''Nebeker:'''


'''Thoren:'''<br>Yes.<br>
Was there generally good morale among the employees of ASEA?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Did you like doing that, directing the work of many people?<br>
Yes, yes, very.


<br>
'''Nebeker:'''


'''Thoren:'''<br>Sure. Yes, I really liked it. It was a hard time, because there were no eight-hour working days then, but I liked it. I have a pamphlet on that if you’re interested. It’s a little bit off.<br>
Did people tend to stay with the company their whole career?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Yes, yes I am. I see, this is a booklet called The ASEA High Power Laboratory. Is this something you wrote?<br>
Many people did. Some people went to the Swedish State Power Board, for instance. They were often recruiting engineers from ASEA. And some, of course, went to other companies, but generally speaking, quite many of them stayed.  


<br>
=== Transition to high-voltage system  ===


'''Thoren:'''<br>Yes, but I don’t think my name is on it.<br>
'''Nebeker:'''  


<br>
How much of the work that you were involved with was related to this moving to higher voltages?


'''Nebeker:'''<br>It’s not mentioned. Is this an extra copy?<br>
'''Thoren:'''  


<br>
Most of it later on.


'''Thoren: '''<br>Yes it is. You may keep that. <br>
'''Nebeker:'''  


<br>
I’m sure all components have to be redesigned.


'''Nebeker:'''<br>Thank you very much. I appreciate that.<br>
'''Thoren:'''  


<br>
Yes. Sweden started high-voltage with a 400 k-volt system, you know, inaugurated in ‘52. Then, in the sixties or the seventies, we found that we would have use for 800 KV, which had been started by the Canadians out of Quebec with the first lines in the area of 735 KV. So we had a joint talk with the Swedish state power board designing lines and equipment for 800 KV for Swedish systems.


'''Thoren:'''<br>As a matter of interest they are rebuilding that laboratory now. <br>
'''Nebeker:'''  


<br>
Was this in the late fifties, roughly?


'''Nebeker:'''<br>Is that right?<br>
'''Thoren:'''  


<br>
No, in the late sixties and early seventies. That came to the sore end.


'''Thoren:'''<br>Making it even bigger.<br>
'''Nebeker:'''  


<br>
Can you tell me a little about that?


'''Nebeker:'''<br>Maybe we can continue to review your career here. <br>
'''Thoren:'''  


<br>
Yes, that’s historically interesting, because the idea was that the first line should go from a nuclear power station north of Stockholm, down to the Stockholm area, about this area here. And actually, the line was designed and built, but it was never operated at 800 KV for political reasons. We had a Prime Minister at that time who belonged to the Farmers Party, and he didn’t know anything about technical things. Somebody had got it into his head that this 800 KV line going from the nuclear power station would carry nuclear energy. It was so ridiculous, but that’s the way it was. At the time, the Prime Minister was absolutely against nuclear power. None of the nuclear power stations were built were built during his time. He said no go to this 800 KV. So the State Power Board had to rebuild the line to a double circuit 400 KV, and that is how it is today. Of course, that works just fine, but it’s more costly.


=== Collaboration with American Electric Power<br>  ===
'''Nebeker:'''


'''Thoren:'''<br>I would like to mention our cooperation with American Electric Power. <br>
Was it pretty much his own decision, or did this become a larger political issue?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Yes, why don’t we do that now.<br>
It became a political issue.  


<br>
'''Nebeker:'''


'''Thoren:'''<br>You probably know about the AEP system. It’s mainly in Illinois I think around there.<br>
You’re telling me the main opposition came from people who thought that somehow nuclear energy would come through this line?


<br>
'''Thoren:'''


'''Nebeker:'''<br>I don't know.<br>
Yes, they thought it would be dangerous because of the nuclear power. That’s how the rumors went. So we had to abandon that.  


<br>
'''Nebeker:'''


'''Thoren:'''<br>That doesn’t matter. They have 345 KV, and they found that they would need a higher voltage. And then they were shooting for the highest. One of the engineers told me, "Once we get permission to build a new line in a certain area we’ll never get any more permissions, so it needs to be as high a voltage as possible." There are two main reasons for high voltage. One is that you have very long distance transmission, which is the case for Quebec in Canada for instance. It was also the case in Sweden for transmission from the north to the south. There’s a different problem for AEP because they had a rather concentrated system. The other possible reason for using very high voltage is if you have a concentrated system and you need to push large amounts of power from different parts of it. They also had a special problem. They were considering a site for new power stations, which people always opposed. One idea at that time was to put together a number of power stations in a certain area. That way they destroy only the small area around them. It was called the power park. That was one thing that people were thinking about at that time. So they thought they would need higher voltages, and they went around to different manufacturing companies to find out whether they could get some cooperation on help. And they selected ASEA. General Electric was very, very angry about that. They sent a message to the AEP top management trying to talk them into using GE instead. But no way. <br>
There were no other 800 KV lines built in Sweden?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Had General Electric done any very high-voltage work?<br>
No. That was the end of it.


<br>
'''Nebeker:'''


'''Thoren:'''<br>No, not really. They had 345 KV.<br>
So 400 KV is the highest?


<br>
'''Thoren:'''


'''Nebeker:'''<br>They had built that line.<br>
It’s the highest, yes. And it operates fine. Many of those lines were built. Not only the nuclear power, but also the influence on the general public of the electric field was a big issue at that time.  


<br> '''Thoren:'''<br>And 500 KV at the West Coast, but that’s all. Well, they selected ASEA as a partner.
'''Nebeker:'''  


<br>
Yes, that’s been a big issue in the United States.
 
'''Thoren:'''
 
It still is in many places. And the funny thing is that the fields around the 400 KV line are higher than the fields around a 800 KV line, because the 800 KV is higher up. It’s a longer distance from the ground to the line.
 
'''Nebeker:'''
 
Is that right?
 
'''Thoren:'''
 
The whole thing is so ridiculous. You could laugh at it, but...
 
'''Nebeker:'''
 
It must have been a big disappointment to the engineers who designed that 800 KV line.
 
'''Thoren:'''
 
Of course. There is a description of that whole 800 KV system somewhere here.
 
'''Nebeker:'''
 
Maybe you can point it out to me. I see. Gunnar Janke [spelling?] was the name.
 
'''Thoren:'''
 
He’s dead now.
 
'''Nebeker:'''
 
Yes, I’d hoped to talk to him.
 
'''Thoren:'''
 
That’s a description of how it should have been.
 
'''Nebeker:'''
 
Can you tell me what part you played in designing that 800 KV system?
 
'''Thoren:'''
 
Well, in the computer department we did a lot of studies of all the voltages of the line. My part was not a very big one, because it was handled by designers.
 
=== Laboratory direction  ===
 
'''Nebeker:'''
 
So fairly early in your career you became a director, a laboratory director?
 
'''Thoren:'''
 
Yes.
 
'''Nebeker:'''
 
Did you like doing that, directing the work of many people?
 
'''Thoren:'''
 
Sure. Yes, I really liked it. It was a hard time, because there were no eight-hour working days then, but I liked it. I have a pamphlet on that if you’re interested. It’s a little bit off.
 
'''Nebeker:'''
 
Yes, yes I am. I see, this is a booklet called The ASEA High Power Laboratory. Is this something you wrote?
 
'''Thoren:'''
 
Yes, but I don’t think my name is on it.
 
'''Nebeker:'''
 
It’s not mentioned. Is this an extra copy?
 
'''Thoren:'''
 
Yes it is. You may keep that.
 
'''Nebeker:'''
 
Thank you very much. I appreciate that.
 
'''Thoren:'''
 
As a matter of interest they are rebuilding that laboratory now.
 
'''Nebeker:'''
 
Is that right?
 
'''Thoren:'''
 
Making it even bigger.
 
'''Nebeker:'''
 
Maybe we can continue to review your career here.
 
=== Collaboration with American Electric Power  ===
 
'''Thoren:'''
 
I would like to mention our cooperation with American Electric Power.
 
'''Nebeker:'''
 
Yes, why don’t we do that now.
 
'''Thoren:'''
 
You probably know about the AEP system. It’s mainly in Illinois I think around there.
 
'''Nebeker:'''
 
I don't know.
 
'''Thoren:'''
 
That doesn’t matter. They have 345 KV, and they found that they would need a higher voltage. And then they were shooting for the highest. One of the engineers told me, "Once we get permission to build a new line in a certain area we’ll never get any more permissions, so it needs to be as high a voltage as possible." There are two main reasons for high voltage. One is that you have very long distance transmission, which is the case for Quebec in Canada for instance. It was also the case in Sweden for transmission from the north to the south. There’s a different problem for AEP because they had a rather concentrated system. The other possible reason for using very high voltage is if you have a concentrated system and you need to push large amounts of power from different parts of it. They also had a special problem. They were considering a site for new power stations, which people always opposed. One idea at that time was to put together a number of power stations in a certain area. That way they destroy only the small area around them. It was called the power park. That was one thing that people were thinking about at that time. So they thought they would need higher voltages, and they went around to different manufacturing companies to find out whether they could get some cooperation on help. And they selected ASEA. General Electric was very, very angry about that. They sent a message to the AEP top management trying to talk them into using GE instead. But no way.
 
'''Nebeker:'''
 
Had [[General Electric (GE)|General Electric]] done any very high-voltage work?
 
'''Thoren:'''
 
No, not really. They had 345 KV.
 
'''Nebeker:'''
 
They had built that line.
 
'''Thoren:'''
 
And 500 KV at the West Coast, but that’s all. Well, they selected ASEA as a partner.


[End tape one, side a]  
[End tape one, side a]  


<br>
'''Thoren:'''


<br> '''Thoren:'''<br>AEP would build the lines, and ASEA would design and develop suitable equipment. We did that. We developed a transformer for, if I remember correctly now, 1600 KV 3-phase, which is over the square root of three to get everything in phase because it was enough costly to build a single-phase transformer, and the line was single-phase, too. We started out and did systems studies for them, and thereafter they really started developing the line. We built a test station near South Bend, and I went over quite often to that station. What we did in that station was mainly investigation of the corona: corona disturbances, corona losses, etc. They tested different bundle configurations and things like that to see what the optimum design would be. There are a number of reports written about that project. You can find them; they are ASEA reports. They will be easy for you to find.<br>
AEP would build the lines, and ASEA would design and develop suitable equipment. We did that. We developed a transformer for, if I remember correctly now, 1600 KV 3-phase, which is over the square root of three to get everything in phase because it was enough costly to build a single-phase transformer, and the line was single-phase, too. We started out and did systems studies for them, and thereafter they really started developing the line. We built a test station near South Bend, and I went over quite often to that station. What we did in that station was mainly investigation of the corona: corona disturbances, corona losses, etc. They tested different bundle configurations and things like that to see what the optimum design would be. There are a number of reports written about that project. You can find them; they are ASEA reports. They will be easy for you to find.  


<br> '''Nebeker:'''<br>Okay. I was just noticing here that you’ve listed that you were director of the AEP-ASEA UHV research project from 1969 to 1984. Is that right?<br>
'''Nebeker:'''  


<br>
Okay. I was just noticing here that you’ve listed that you were director of the AEP-ASEA UHV research project from 1969 to 1984. Is that right?


'''Thoren:'''<br>Yes, that’s from the ASEA point. I managed it from here. I didn’t do the job. That was spread out in different departments, but I had to put it together. From the AEP side they had first Howard Barnes. He retired and went to Arizona – and had a lazy time. He was followed by Hal Shearer. You might have heard his name. He was president of the Power Engineering Society for some years. He is retired now, but he’s still alive. If I’m correctly informed, he's managing the American participation in CIGRE. He was my counterpart at that time. There are a number of CIGRE reports listed here.<br>
'''Thoren:'''  


<br>
Yes, that’s from the ASEA point. I managed it from here. I didn’t do the job. That was spread out in different departments, but I had to put it together. From the AEP side they had first [[Howard C. Barnes|Howard Barnes]]. He retired and went to Arizona – and had a lazy time. He was followed by Hal Shearer. You might have heard his name. He was president of the Power Engineering Society for some years. He is retired now, but he’s still alive. If I’m correctly informed, he's managing the American participation in CIGRE. He was my counterpart at that time. There are a number of CIGRE reports listed here.


'''Nebeker:'''<br>Yes, there are a great many.<br>
'''Nebeker:'''  


<br>
Yes, there are a great many.


'''Thoren:'''<br>Then there is a final report, which I have no copies of. It is proprietary; I think it was for AEP, but if you like you can write down the title.<br>
'''Thoren:'''  


<br>
Then there is a final report, which I have no copies of. It is proprietary; I think it was for AEP, but if you like you can write down the title.


'''Nebeker:'''<br>I’ll just take a look at it.<br>
'''Nebeker:'''  


<br>
I’ll just take a look at it.


'''Thoren:'''<br>I suggest you get it from AEP.<br>
'''Thoren:'''  


<br>
I suggest you get it from AEP.


'''Nebeker:'''<br>Let me just put it on tape. This is the AEP-ASEA UHV research project report number UHV88-2, July 1988. This is the assessment of final results.<br>
'''Nebeker:'''  


<br>
Let me just put it on tape. This is the AEP-ASEA UHV research project report number UHV88-2, July 1988. This is the assessment of final results.


'''Thoren:'''<br>Yes.<br>
'''Thoren:'''  


<br>
Yes.


'''Nebeker:'''<br>Can I get from you your assessment, looking back on this long period of development, of how the work went, and how important it was?<br>
'''Nebeker:'''  


<br>
Can I get from you your assessment, looking back on this long period of development, of how the work went, and how important it was?


'''Thoren:'''<br>Well, technically the work was very easy. We had no problems with cooperation with AEP. We helped each other, and there were no real problems. The outcome of the whole thing was something of a disaster. And the reason for that was the oil crisis in your country, which slowed down industrial work. At the end of the seventies AEP found that they didn’t have any use for the high voltage. The manufacturing companies in their area were mostly steel mills and iron foundries and so on. That area went down. In your country people were developing electronics instead. That activity was centered in the southern part of the United States. So finally, after the work had been done, we found there were no markets for it.<br>
'''Thoren:'''  


<br>
Well, technically the work was very easy. We had no problems with cooperation with AEP. We helped each other, and there were no real problems. The outcome of the whole thing was something of a disaster. And the reason for that was the oil crisis in your country, which slowed down industrial work. At the end of the seventies AEP found that they didn’t have any use for the high voltage. The manufacturing companies in their area were mostly steel mills and iron foundries and so on. That area went down. In your country people were developing electronics instead. That activity was centered in the southern part of the United States. So finally, after the work had been done, we found there were no markets for it.


'''Nebeker:'''<br>Were there efforts made to find other locations for this ultra-high voltage?<br>
'''Nebeker:'''  


<br>
Were there efforts made to find other locations for this ultra-high voltage?


'''Thoren:'''<br>No, not really, because the whole industry of electricity production changed. Now small is beautiful, and instead of building power blocks and transmitting quite a lot of power over long distances, people are building small power stations here and there and everywhere, and the demand for electricity is not so high as it used to be.<br>
'''Thoren:'''  


<br>
No, not really, because the whole industry of electricity production changed. Now small is beautiful, and instead of building power blocks and transmitting quite a lot of power over long distances, people are building small power stations here and there and everywhere, and the demand for electricity is not so high as it used to be.


'''Nebeker:'''<br>Certainly the growth rate is slower.<br>
'''Nebeker:'''  


<br>
Certainly the growth rate is slower.


'''Thoren:'''<br>Yes, yes.<br>
'''Thoren:'''  


<br>
Yes, yes.


=== History of power transmission<br> ===
=== History of power transmission  ===


'''Nebeker:'''<br>So if we look at the history of power engineering, and especially power transmission, you have, at the very end of the nineteenth century, the development of these AC systems for transmitting power from Niagara Falls to Buffalo. Was there a steady increase in the voltage of this long distance transmission for the next half century or so?<br>
'''Nebeker:'''  


<br>
So if we look at the history of power engineering, and especially power transmission, you have, at the very end of the nineteenth century, the development of these AC systems for transmitting power from Niagara Falls to Buffalo. Was there a steady increase in the voltage of this long distance transmission for the next half century or so?


'''Thoren:'''<br>You mean creating transmission?<br>
'''Thoren:'''  


<br>
You mean creating transmission?


'''Nebeker:'''<br>Right, was there a gradual increase in the highest voltage used for transmission?<br>
'''Nebeker:'''  


<br>
Right, was there a gradual increase in the highest voltage used for transmission?


'''Thoren:'''<br>Not gradual, more step-wise. As I said, AEP had 345. Bonneville, in the West, had 500 KV, and that’s the end of the United States. The Canadians had 335. The highest voltage today used is in Russia. They built 1100 KV lines for transmitting power from Siberia to the European part of the country. Then came a new competitor in that field, high-voltage DC. ASEA built the first high-voltage DC system in ‘54, and that was a cable connection between Sweden and the Island of Gotland. That was the first. Then at the end of the fifties more high-voltage DC lines came into operation. ASEA built one on the West Coast in the United States.<br>
'''Thoren:'''  


<br>
Not gradual, more step-wise. As I said, AEP had 345. Bonneville, in the West, had 500 KV, and that’s the end of the United States. The Canadians had 335. The highest voltage today used is in Russia. They built 1100 KV lines for transmitting power from Siberia to the European part of the country. Then came a new competitor in that field, high-voltage DC. ASEA built the first high-voltage DC system in ‘54, and that was a cable connection between Sweden and the Island of Gotland. That was the first. Then at the end of the fifties more high-voltage DC lines came into operation. ASEA built one on the West Coast in the United States.


'''Nebeker:'''<br>Yes, I know of that line.<br>
'''Nebeker:'''  


<br>
Yes, I know of that line.


'''Thoren:'''<br>After that, the mercury arc wires were superseded by thyristors, solid-state devices, which are much more reliable, with much less outage and so on. Now high-voltage DC has been very common in many parts of the world.<br>
'''Thoren:'''  


<br>
After that, the mercury arc wires were superseded by thyristors, solid-state devices, which are much more reliable, with much less outage and so on. Now high-voltage DC has been very common in many parts of the world.


'''Nebeker:'''<br>What sort of voltages are they getting to? Do you know?<br>
'''Nebeker:'''  


<br>
What sort of voltages are they getting to? Do you know?


'''Thoren:'''<br>Well, I should know, but I would guess 500 KV – 400 or 500 KV.<br>
'''Thoren:'''  


<br>
Well, I should know, but I would guess 500 KV – 400 or 500 KV.


'''Nebeker:'''<br>Did you have any involvement yourself in high-voltage DC?<br>
'''Nebeker:'''  


<br>
Did you have any involvement yourself in high-voltage DC?


'''Thoren:'''<br>Not very much. That was handled by another department within ASEA. <br>
'''Thoren:'''  


<br>
Not very much. That was handled by another department within ASEA.


'''Nebeker:'''<br>Was there much transfer of technology from this ultra-high voltage AC to the high voltage DC? Were any of the components transferable?<br>
'''Nebeker:'''  


<br>
Was there much transfer of technology from this ultra-high voltage AC to the high voltage DC? Were any of the components transferable?


'''Thoren:'''<br>No, no, not with DC, because that’s entirely different. It’s just a different thing.<br>
'''Thoren:'''  


<br>
No, no, not with DC, because that’s entirely different. It’s just a different thing.


'''Nebeker:'''<br>So all the components are different?<br>
'''Nebeker:'''  


<br>
So all the components are different?


'''Thoren:'''<br>Yes. But from the ultra high-voltage development work came a lot of knowledge for AEP, especially for lower voltage, for 745 KV and things like that. They learned a lot about corona influence and things like that. They were actually running this ultra-high-voltage test line after we ended the project just because they wanted to test at other, lower voltages. So some use came out of it.<br>
'''Thoren:'''  


<br>
Yes. But from the ultra high-voltage development work came a lot of knowledge for AEP, especially for lower voltage, for 745 KV and things like that. They learned a lot about corona influence and things like that. They were actually running this ultra-high-voltage test line after we ended the project just because they wanted to test at other, lower voltages. So some use came out of it.


'''Nebeker:'''<br>Is that also true of the Swedish development of that 800 KV line? Was there some gain from that development? Was there some gain for the 400 KV lines that came out of the work on the 800?<br>
'''Nebeker:'''  


<br>
Is that also true of the Swedish development of that 800 KV line? Was there some gain from that development? Was there some gain for the 400 KV lines that came out of the work on the 800?


'''Thoren:'''<br>Well, maybe not so much for the line, but we learned a lot about the development of equipment for high voltage and the technique of the insulation of transformers. It was not completely useless.<br>
'''Thoren:'''  


<br>
Well, maybe not so much for the line, but we learned a lot about the development of equipment for high voltage and the technique of the insulation of transformers. It was not completely useless.


'''Nebeker:'''<br>Yes.<br>
'''Nebeker:'''  


<br>
Yes.


'''Thoren:'''<br>Development is continuous in the area of developing equipment, and you always learn a little from new equipment.<br>
'''Thoren:'''  


<br>
Development is continuous in the area of developing equipment, and you always learn a little from new equipment.


'''Nebeker:'''<br>How good has the international exchange of knowledge been? You’ve mentioned some contacts that ASEA had with AEP and elsewhere. Is this a field where there is very quick transfer of technique from country to country?<br>
'''Nebeker:'''  


<br>
How good has the international exchange of knowledge been? You’ve mentioned some contacts that ASEA had with AEP and elsewhere. Is this a field where there is very quick transfer of technique from country to country?


'''Thoren:'''<br>Rather. Mainly because this project with AEP meant having intensive exchange of engineers. I mean, many of ASEA people went over there to talk with AEP, and the AEP people came over here to talk with us. So it was completely open contact.<br>
'''Thoren:'''  


=== Publication of corporate research<br>  ===
Rather. Mainly because this project with AEP meant having intensive exchange of engineers. I mean, many of ASEA people went over there to talk with AEP, and the AEP people came over here to talk with us. So it was completely open contact.


'''Nebeker:'''<br>You have quite a list of publications here. I’ve often been surprised that companies are often so open about sharing the results of their research. This research and development is very costly, but then results are published.<br>
=== Publication of corporate research ===


<br>
'''Nebeker:'''


'''Thoren:'''<br>Well, to a certain limit. When writing a report, you don’t have to tell everything. So there are always things that are kept secret as long as possible. In the long run it is difficult, because other people are doing the same things. But it’s not that manufacturing companies give away what they have.<br>
You have quite a list of publications here. I’ve often been surprised that companies are often so open about sharing the results of their research. This research and development is very costly, but then results are published.  


<br>
'''Thoren:'''


'''Nebeker:'''<br>They know what they should keep to themselves?<br>
Well, to a certain limit. When writing a report, you don’t have to tell everything. So there are always things that are kept secret as long as possible. In the long run it is difficult, because other people are doing the same things. But it’s not that manufacturing companies give away what they have.


<br>
'''Nebeker:'''


'''Thoren:'''<br>Yes. Many things you can talk about quite openly, because many people know about it, so writing reports is often a way of telling your customers that you know this. But you don’t want to tell your competitors. It’s a certain balance.<br>
They know what they should keep to themselves?


<br>
'''Thoren:'''


'''Nebeker:'''<br>Yes, you want to advertise that you’re able to do this, and show that you really know what you’re talking about, but not reveal everything.<br>
Yes. Many things you can talk about quite openly, because many people know about it, so writing reports is often a way of telling your customers that you know this. But you don’t want to tell your competitors. It’s a certain balance.  


<br>
'''Nebeker:'''


'''Thoren:'''<br>Yes. And that was one of the main reasons why we arranged symposia, for instance. We were telling our customers that we know this. We didn’t tell them exactly how we did it, but we told them that we did it, and we showed them the results.<br>
Yes, you want to advertise that you’re able to do this, and show that you really know what you’re talking about, but not reveal everything.  


=== IEEE and professional groups<br>  ===
'''Thoren:'''


'''Nebeker:'''<br>I’m looking here at your professional affiliations. Since I’m employed by the IEEE, I’m interested in your connection with IEEE. What seemed valuable about IEEE to you in your career? Was it mainly the publications that you received, or was it conferences?<br>
Yes. And that was one of the main reasons why we arranged symposia, for instance. We were telling our customers that we know this. We didn’t tell them exactly how we did it, but we told them that we did it, and we showed them the results.


<br>
=== IEEE and professional groups  ===


'''Thoren:'''<br>No, it was not, especially during the time we worked on the AEP. I was over in the United States quite often, and I would time that so that I could attend the IEEE conference or the Power Engineering Society Conference. I did that quite often. That was certainly valuable. You got to know a number of people. You could discuss things with them. And yes, it was generally valuable.<br>
'''Nebeker:'''  


<br>
I’m looking here at your professional affiliations. Since I’m employed by the [[IEEE History|IEEE]], I’m interested in your connection with IEEE. What seemed valuable about IEEE to you in your career? Was it mainly the publications that you received, or was it conferences?


'''Nebeker:'''<br>You have quite a list of other commissions and professional groups that you’ve been with. Maybe I could ask you about the International Electro-Technical Commission?<br>
'''Thoren:'''  


<br>
No, it was not, especially during the time we worked on the AEP. I was over in the United States quite often, and I would time that so that I could attend the IEEE conference or the Power Engineering Society Conference. I did that quite often. That was certainly valuable. You got to know a number of people. You could discuss things with them. And yes, it was generally valuable.


'''Thoren:'''<br>The IEC, yes. That’s the board that writes the standards. I was working there for quite a number of years on different committees and working groups.<br>
'''Nebeker:'''  


<br>
You have quite a list of other commissions and professional groups that you’ve been with. Maybe I could ask you about the International Electro-Technical Commission?


'''Nebeker:'''<br>I see you’ve listed here, “Swedish delegate in the Committee for Insulation Coordination” for twelve years or so.<br>
'''Thoren:'''  


<br>
The IEC, yes. That’s the board that writes the standards. I was working there for quite a number of years on different committees and working groups.


'''Thoren:'''<br>Yes, that was my main job. I was also on the Committee for Standard Voltage or something like that. It was a very interesting time, because the IEC was writing standards, and there was rather a clash between different countries. Many already had their standards, and they were trying to combine those to IEC standard, and that’s [Thoren makes a growling noise].<br>
'''Nebeker:'''  


<br>
I see you’ve listed here, “Swedish delegate in the Committee for Insulation Coordination” for twelve years or so.


'''Nebeker:'''<br>Right. I know IEEE puts a great deal of effort into its set of standards. Does the IEC usually succeed in resolving these clashes?<br>
'''Thoren:'''  


<br>
Yes, that was my main job. I was also on the Committee for Standard Voltage or something like that. It was a very interesting time, because the IEC was writing standards, and there was rather a clash between different countries. Many already had their standards, and they were trying to combine those to IEC standard, and that’s [Thoren makes a growling noise].


'''Thoren:'''<br>More or less.<br>
'''Nebeker:'''  


<br>
Right. I know IEEE puts a great deal of effort into its set of standards. Does the IEC usually succeed in resolving these clashes?


'''Nebeker:'''<br>Is it the case that there are...&nbsp;?<br>
'''Thoren:'''  


<br>
More or less.


'''Thoren:'''<br>Well, at the end usually something comes out. The worst thing I was involved in was standard voltages. At the lower end, you know, in Europe you use 220, and 240 in the British Empire part of Europe. They also had that in India and other places. In Continental Europe it was 220, and you know, it’s not easy to combine. The English people claim that they couldn’t use 220, because then they would loose some of the transmission power, which they certainly would. People using 220 said they couldn’t use 240 because the insulation levels were not sufficient. It went on like this for many, many years. The outcome was a compromise on 230. <br>
'''Nebeker:'''  


<br>
Is it the case that there are...?


'''Nebeker:'''<br>Is that right. [laughter]<br>
'''Thoren:'''  


<br>
Well, at the end usually something comes out. The worst thing I was involved in was standard voltages. At the lower end, you know, in Europe you use 220, and 240 in the British Empire part of Europe. They also had that in India and other places. In Continental Europe it was 220, and you know, it’s not easy to combine. The English people claim that they couldn’t use 220, because then they would loose some of the transmission power, which they certainly would. People using 220 said they couldn’t use 240 because the insulation levels were not sufficient. It went on like this for many, many years. The outcome was a compromise on 230.


'''Thoren:'''<br>And then to make it easy for people to adopt that, they changed the boundaries.<br>
'''Nebeker:'''  


<br>
Is that right. [laughter]


'''Nebeker:'''<br>I see, the tolerances where the …<br>
'''Thoren:'''  


<br>
And then to make it easy for people to adopt that, they changed the boundaries.


'''Thoren:'''<br>Yes, yes. Then it came out that way, so 230 is now the actual standard for all of Europe, and different countries are trying to comply with that. In Sweden for instance, we are adopting 230. It was not too difficult, because we had 220, and the only problem was at the higher end we didn’t have the insulation levels for 220 plus 15% over what the claim was, so we decided to reduce the upper limit a little. But that was the only way to do something about it. We had another problem at the higher end. The Canadians had 735. You may question these values. Why not 200 instead of 220? Well, it’s very simple. The people decided to use 200 volts, which is a good figure, and then it was considered that you needed 10% higher volts after sending, and then you came to 220.<br>
'''Nebeker:'''  


<br>
I see, the tolerances where the …


'''Nebeker:'''<br>I see. I didn’t know that.<br>
'''Thoren:'''  


<br>
Yes, yes. Then it came out that way, so 230 is now the actual standard for all of Europe, and different countries are trying to comply with that. In Sweden for instance, we are adopting 230. It was not too difficult, because we had 220, and the only problem was at the higher end we didn’t have the insulation levels for 220 plus 15% over what the claim was, so we decided to reduce the upper limit a little. But that was the only way to do something about it. We had another problem at the higher end. The Canadians had 735. You may question these values. Why not 200 instead of 220? Well, it’s very simple. The people decided to use 200 volts, which is a good figure, and then it was considered that you needed 10% higher volts after sending, and then you came to 220.


'''Thoren:'''<br>And it’s the same at 400 KV, for instance. We actually decided about 380 KV in Sweden because it is the square root of three times 220. But then the 220 was changed to 400 KV. Yes, the 400 KV system was named 400 KV. It was actually higher--something like 420. 400 KV should then have an upper limit of 440, but it was considered that at these voltages you don’t need a 10% difference between sending, so 420 was decided upon. The Canadians had decided upon 700, and then it would go 5% more, then so it came at 735. Then AEP did something different. We decided upon 750. And then to make it even worse, they considered that to be the lower level, and 785 to be the higher level. Now that didn’t do very much, because there are not many connections with the 800 KV system, but that’s the lower end. I mean, when combining or connecting all these countries, it’s useful to have the same voltage.<br>
'''Nebeker:'''  


<br>
I see. I didn’t know that.


'''Nebeker:'''<br>Yes, yes, and I know that’s happening more and more, of course, over time.<br>
'''Thoren:'''  


<br>
And it’s the same at 400 KV, for instance. We actually decided about 380 KV in Sweden because it is the square root of three times 220. But then the 220 was changed to 400 KV. Yes, the 400 KV system was named 400 KV. It was actually higher--something like 420. 400 KV should then have an upper limit of 440, but it was considered that at these voltages you don’t need a 10% difference between sending, so 420 was decided upon. The Canadians had decided upon 700, and then it would go 5% more, then so it came at 735. Then AEP did something different. We decided upon 750. And then to make it even worse, they considered that to be the lower level, and 785 to be the higher level. Now that didn’t do very much, because there are not many connections with the 800 KV system, but that’s the lower end. I mean, when combining or connecting all these countries, it’s useful to have the same voltage.


'''Thoren:'''<br>Yes. Something of the same happened with the frequency. In your country, you run 60 Hertz. In Europe, we run 50, and the reason for that I don’t really know, but there was no talk about connection between the two, so we could choose what we wanted. Sixty is a good figure because you can divide by quite a number of different figures. Fifty can only be divided by two or five. In Sweden we had it at twenty-five to start with, and in many other countries we had a variety of frequencies.<br>
'''Nebeker:'''  


<br>
Yes, yes, and I know that’s happening more and more, of course, over time.


'''Nebeker:'''<br>Yes, I know in England for a long time they had different frequencies.<br>
'''Thoren:'''  


<br>
Yes. Something of the same happened with the frequency. In your country, you run 60 Hertz. In Europe, we run 50, and the reason for that I don’t really know, but there was no talk about connection between the two, so we could choose what we wanted. Sixty is a good figure because you can divide by quite a number of different figures. Fifty can only be divided by two or five. In Sweden we had it at twenty-five to start with, and in many other countries we had a variety of frequencies.


'''Thoren:'''<br>But when people began to combine their systems we had to join the lines, and fifty hertz was considered okay in Europe, except for railways, where we used to have a lower frequency, sixteen and two-thirds, which is one-third of fifty. That had to do with the special design of the electric motors for the locomotives. In Sweden we have fifteen hertz in the upper North, because of the connection for the …<br>
'''Nebeker:'''  


<br>
Yes, I know in England for a long time they had different frequencies.


'''Nebeker:'''<br>The electric trains there?<br>
'''Thoren:'''  


<br>
But when people began to combine their systems we had to join the lines, and fifty hertz was considered okay in Europe, except for railways, where we used to have a lower frequency, sixteen and two-thirds, which is one-third of fifty. That had to do with the special design of the electric motors for the locomotives. In Sweden we have fifteen hertz in the upper North, because of the connection for the …


'''Thoren:'''<br>The electric trains transmitting iron ore from the Swedish mountains to the Norwegian coast run at fifteen.<br>
'''Nebeker:'''  


<br>
The electric trains there?


'''Nebeker:'''<br>Fifteen, I see.<br>
'''Thoren:'''  


<br>
The electric trains transmitting iron ore from the Swedish mountains to the Norwegian coast run at fifteen.


'''Thoren:'''<br>Now all that is no problem, because people are using solid state converters between these different frequencies. That’s easy. You don’t have to rebuild the network.<br>
'''Nebeker:'''  


<br>
Fifteen, I see.


'''Nebeker:'''<br>Didn’t they have the rotary converters before?<br>
'''Thoren:'''  


<br>
Now all that is no problem, because people are using solid state converters between these different frequencies. That’s easy. You don’t have to rebuild the network.


'''Thoren:'''<br>They had rotary converters before. But then we were stuck with one-third or two-thirds of the frequency.<br>
'''Nebeker:'''  


<br>
Didn’t they have the rotary converters before?


'''Nebeker:'''<br>Well, that is very interesting. I’m noticing here that you had some connection with the Indian Institute of Science in Banglore.<br>
'''Thoren:'''  


<br>
They had rotary converters before. But then we were stuck with one-third or two-thirds of the frequency.


'''Thoren:'''<br>Yes, but not very much. I’ve been to India a couple of times. The first time I went around for four weeks. I got to know some of the Indian professors. We also had some Indian professors over here who were working for us for some time. Then they asked me to do that job for them.<br>
'''Nebeker:'''  


<br>
Well, that is very interesting. I’m noticing here that you had some connection with the Indian Institute of Science in Banglore.
 
'''Thoren:'''
 
Yes, but not very much. I’ve been to India a couple of times. The first time I went around for four weeks. I got to know some of the Indian professors. We also had some Indian professors over here who were working for us for some time. Then they asked me to do that job for them.


=== Gunnar Jancke  ===
=== Gunnar Jancke  ===


'''Nebeker:'''<br>I see. I wanted to ask you also about other Swedish power engineers that you have worked with or come in contact with. Are there any that impressed you greatly or that you care to comment on. We mentioned earlier Gunnar Jancke.<br>
'''Nebeker:'''  
 
I see. I wanted to ask you also about other Swedish power engineers that you have worked with or come in contact with. Are there any that impressed you greatly or that you care to comment on. We mentioned earlier [[Gunnar Jancke]].  
 
'''Thoren:'''


<br>
Yes.


'''Thoren:'''<br>Yes.<br>
'''Nebeker:'''  


<br>
Did you work with him?


'''Nebeker:'''<br>Did you work with him?<br>
'''Thoren:'''  


<br>
We worked close together. We were very good friends.


'''Thoren:'''<br>We worked close together. We were very good friends.<br>
'''Nebeker:'''  


<br>
What can you tell me about him as an engineer?


'''Nebeker:'''<br>What can you tell me about him as an engineer?<br>
'''Thoren:'''  


<br>
He was an excellent engineer, not so much in theoretical work, but in practical work. He was the one who got Sweden into 400 KV, for instance.


'''Thoren:'''<br>He was an excellent engineer, not so much in theoretical work, but in practical work. He was the one who got Sweden into 400 KV, for instance.<br>
'''Nebeker:'''  


<br>
He was a leader in that?


'''Nebeker:'''<br> He was a leader in that?<br>
'''Thoren:'''  


<br>
That was mainly his job. Of course, other people helped him. I did a little in some ways, but it was actually his job. And also that story with 800 KV. That was his baby.


'''Thoren:'''<br>That was mainly his job. Of course, other people helped him. I did a little in some ways, but it was actually his job. And also that story with 800 KV. That was his baby.<br>
'''Nebeker:'''  


<br>
I see. So he was the prime mover in those two projects?


'''Nebeker:'''<br>I see. So he was the prime mover in those two projects?<br>
'''Thoren:'''  


<br>
Yes, he was. He was chief engineer there, not so very much in management and things like that, but he was the technical leader.


'''Thoren:'''<br>Yes, he was. He was chief engineer there, not so very much in management and things like that, but he was the technical leader.<br>
'''Nebeker:'''  


<br>
In the technical design?


'''Nebeker:'''<br>In the technical design?<br>
'''Thoren:'''  


<br>
I think he had a brilliant idea of what the future would be like.


'''Thoren:'''<br>I think he had a brilliant idea of what the future would be like.<br>
'''Nebeker:'''  


<br>
So he was one of these engineers with a vision, who saw that certain things might be achieved and pushed for it? What other engineers do you think of as very impressive?


'''Nebeker:'''<br>So he was one of these engineers with a vision, who saw that certain things might be achieved and pushed for it? What other engineers do you think of as very impressive?<br>
'''Thoren:'''  


<br>
At the Swedish State Power Board, Siguard Smedsfell was working for Jancke for some time. Then he got his own department and he was one of the people working on developing Swedish systems – not the running of them, but the development of them. He was also a very good engineer. I left there more than ten years ago, so many of the names have fallen out of my head. But they had a number of very good engineers at the Power Board.


'''Thoren:'''<br>At the Swedish State Power Board, Siguard Smedsfell was working for Jancke for some time. Then he got his own department and he was one of the people working on developing Swedish systems – not the running of them, but the development of them. He was also a very good engineer. I left there more than ten years ago, so many of the names have fallen out of my head. But they had a number of very good engineers at the Power Board.<br>
'''Nebeker:'''  


<br>
Is there anything that I haven’t asked about that you’d like to comment on?


'''Nebeker:'''<br>Is there anything that I haven’t asked about that you’d like to comment on?<br>
'''Thoren:'''  


<br>
I think I commented on quite a bit: my own job starting with circuit breaker testing, building the laboratory, and then going on to computer work.


'''Thoren:'''<br>I think I commented on quite a bit: my own job starting with circuit breaker testing, building the laboratory, and then going on to computer work.<br>
'''Nebeker:'''  


<br>
The application of computers?


'''Nebeker:'''<br>The application of computers?<br>
=== Inauguration of American Ultra-High Voltage and the Canadian 335 KV  ===


<br>
'''Thoren:'''


=== Inauguration of American Ultra-High Voltage and the Canadian 335 KV<br>  ===
The application of computers. And then we talked about development in Sweden of the 400 KV and 800 KV. We had the American Ultra-High Voltage and the Canadian 335 KV. I was not really much involved in that, but I was there when they put the first line into operation.


'''Thoren:'''<br>The application of computers. And then we talked about development in Sweden of the 400 KV and 800 KV. We had the American Ultra-High Voltage and the Canadian 335 KV. I was not really much involved in that, but I was there when they put the first line into operation.<br>
'''Nebeker:'''  


<br>
Is that right?


'''Nebeker:'''<br>Is that right?<br>
'''Thoren:'''  


<br>
Yes.


'''Thoren:'''<br>Yes.<br>
'''Nebeker:'''  


<br>
When was that, roughly?


'''Nebeker:'''<br>When was that, roughly?<br>
'''Thoren:'''  


<br>
'55, something like that. I was there waiting for things to happen.


'''Thoren:'''<br>‘55, something like that. I was there waiting for things to happen.<br>
'''Nebeker:'''  


<br>
For the sparks to fly?


'''Nebeker:'''<br>For the sparks to fly?<br>
'''Thoren:'''  


<br>
We had to wait, and wait, and wait, and wait, and wait. Then in the evening they offered us cognac.


'''Thoren:'''<br>We had to wait, and wait, and wait, and wait, and wait. Then in the evening they offered us cognac.<br>
'''Nebeker:'''  


<br>
Did it finally work?


'''Nebeker:'''<br>Did it finally work?<br>
'''Thoren:'''  


<br>
Then they finally pushed the button, and the line went into operation, bang, everything went out. They had forgotten the earth connections in one of the towers. But then in the middle of the night it started and it worked all right.


'''Thoren:'''<br>Then they finally pushed the button, and the line went into operation, bang, everything went out. They had forgotten the earth connections in one of the towers. But then in the middle of the night it started and it worked all right.<br>
'''Nebeker:'''  


<br>
Okay. So they’d invited quite a number of engineers to see this? Putting the line into use?


'''Nebeker:'''<br>Okay. So they’d invited quite a number of engineers to see this? Putting the line into use?<br>
'''Thoren:'''  


<br>
Oh, yes. They’d invited quite a crowd. [laughter] We were waiting for something to eat. I think we got some sandwiches. They probably had expected to start the line much earlier, but I remember problems coming up. But it worked, and we were happy, because we had delivered the transformers.


'''Thoren:'''<br>Oh, yes. They’d invited quite a crowd. [laughter] We were waiting for something to eat. I think we got some sandwiches. They probably had expected to start the line much earlier, but I remember problems coming up. But it worked, and we were happy, because we had delivered the transformers.<br>
'''Nebeker:'''  


<br> '''Nebeker:'''<br>Oh, I see.<br>
Oh, I see.  


<br>
'''Thoren:'''


'''Thoren:'''<br>They were our transformers. And some of the equipment was ours, too, and that’s the reason for my being there, just to look at it. I remember the chief engineer, when the thing started, looked at me and said, “The transformers must work!” [laughter] Anyhow, they extended that network later on, and I think they have had good use from it, because it’s a long, long distance from the lake area in Canada down to the Montreal area.<br>
They were our transformers. And some of the equipment was ours, too, and that’s the reason for my being there, just to look at it. I remember the chief engineer, when the thing started, looked at me and said, “The transformers must work!” [laughter] Anyhow, they extended that network later on, and I think they have had good use from it, because it’s a long, long distance from the lake area in Canada down to the Montreal area.  


<br>
'''Nebeker:'''


'''Nebeker:'''<br>Well, thank you very much.  
Well, thank you very much.  


<br>[End of interview]<br><br>
[End of interview]  


[[Category:People_and_organizations]] [[Category:Engineers]] [[Category:Power,_energy_&_industry_application|Category:Power,_energy_&amp;_industry_application]] [[Category:Corporations]] [[Category:Power_systems]] [[Category:Power_transmission]] [[Category:Power_engineering]] [[Category:High-voltage_techniques]] [[Category:Computers_and_information_processing]] [[Category:Computer_networks]]
[[Category:People and organizations|Thoren]] [[Category:Engineers|Thoren]] [[Category:Energy|Thoren]] [[Category:Corporations|Thoren]] [[Category:Power systems|Thoren]] [[Category:Power transmission|Thoren]] [[Category:Power engineering|Thoren]] [[Category:High-voltage techniques|Thoren]] [[Category:Computing and electronics|Thoren]] [[Category:Computer networks|Thoren]] [[Category:News|Thoren]]

Latest revision as of 19:07, 26 January 2021

About Bertil Thorén

Bertil Thorén, 1996

Born in Vänersborg, Sweden in 1921, Bertil Thorén demonstrated a childhood interest in science and technology. He studied electrical engineering at the Technical University in Stockholm, and in 1944, earned his master's degree. As military service in Sweden was compulsory, he spent a year in the military before seeking employment, first at ASEA, and then obtaining steady employment at the Ludvika High Voltage and Short Circuit Laboratory as a lab engineer in 1946. His work consisted primarily of testing the breaking capacity of circuit breakers and fuses. In 1950, Thoren went on to receive his doctorate while still working full time. In his thesis he attempted to calculate how much one could deviate from the correct value of current and voltages, a theoretical study which was later used by IEC as a basis when writing its specifications for synthetic testing. Thorén progressed through career stages rapidly. By 1954 he became the manager of the high-power laboratory, where he stayed until the middle of the sixties, when he moved to the Power Systems Consulting Department at Västerås. With this move, Thorén found himself in a completely new area of work, developing computer programs to calculate network performance during short circuits. By the late sixties and early seventies he was lecturing internationally as part of a program to introduce ASEA to various parts of the world.

About the Interview

BERTIL THOREN: An interview conducted by Frederik Nebeker, Center for the History of Electrical Engineering, 16 July 1996

Interview #302 for the Center for the History of Electrical Engineering, The Institute of Electrical and Electronics Engineers, Inc.

Copyright Statement

This manuscript is being made available for research purposes only. All literary rights in the manuscript, including the right to publish, are reserved to the IEEE History Center. No part of the manuscript may be quoted for publication without the written permission of the Director of IEEE History Center.

Request for permission to quote for publication should be addressed to the IEEE History Center Oral History Program, IEEE History Center, 445 Hoes Lane, Piscataway, NJ 08854 USA or ieee-history@ieee.org. It should include identification of the specific passages to be quoted, anticipated use of the passages, and identification of the user.

It is recommended that this oral history be cited as follows:

Bertil Thorén, an oral history conducted in 1996 by Frederik Nebeker, IEEE History Center, Piscataway, NJ, USA.

Interview

INTERVIEW: Bertil Thorén

INTERVIEWER: Frederik Nebeker

PLACE: Västerås, Sweden

DATE: 16 July 1996

Childhood and education

Nebeker:

I see that you were born in 1921.

Thoren:

Yes.

Nebeker:

In Sweden. Where exactly were you born?

Thoren:

Vänersborg.

Nebeker:

Where is that near?

Thoren:

That is not to far away from Göteborg.

Nebeker:

I see.

Thoren:

But you have a main railway from the Vänern down to Göteborg. At the other end is the town of Vänersborg. That’s where I was born.

Nebeker:

Did you go to gymnasium?

Thoren:

I went to gymnasium, but in another place, in Skara. It is not too far away, but it is inland from Göteborg.

Nebeker:

Was it always clear that you were interested in science and technology when you were a boy?

Thoren:

That’s true. There was no doubt about that.

Nebeker:

I see. Did you have a radio yourself, a crystal radio, for example, when you were a boy?

Thoren:

I tried. I bought some pieces and tried to get it to work. But it did not.

Nebeker:

And what did you do when you finished gymnasium?

Thoren:

I went to the Technical University in Stockholm and studied Electrical Engineering.

Nebeker:

At that time there were two lines, is that right? The weak current and the strong current?

Thoren:

Mainly, yes. I took the strong current.

Nebeker:

You were always interested in that type of engineering?

Thoren:

Yes. Not so much in electronics. It was a difficult to understand the radio tubes, but the power engineering interested me.

Nebeker:

Oh, I should have asked about your family background, what your father did.

Thoren:

My father started out as a military man. My whole family were farmers rather close to where I was born, Vänersborg. I’ve done a lot of studies on my ancestors, so I know most of it. They were farmers, but my father had seven brothers. They couldn’t all take over the farm, so he had to do something else. My father had no theoretical education, so he went to the Army, and made it the long way up.

Nebeker:

Oh, from the ranks, so to speak?

Thoren:

Yes, yes. When I was born he was what was called an under-officer, which is not officer but below it.

Nebeker:

I see you earned your Masters Degree in 1944.

Thoren:

Yes, yes.

Military service and engineering employment at High Voltage and Short Circuit Laboratory

Nebeker:

Did you take employment at that point?

Thoren:

Military service.

Nebeker:

I see, you had military service.

Thoren:

It was compulsory at that time, so I had to go for one year of military service between ‘44 and ‘45.

Nebeker:

Yes, I know that was a tense time for Sweden because it was trying to stay out of the War.

Thoren:

Oh yes. You know, I had problems at that time with my hearing, and today they wouldn’t allow me in military service, but at that time they took everybody. So I spent a year there, and then I went to ASEA, and started there in March ‘45. They had a course for young engineers which meant that you stayed for two months at each department, and went around. That was a very useful time.

Nebeker:

Where were you working? Was that in Västerås?

Thoren:

In Västerås, yes. Then in early ‘46 I got steady employment at Ludvika, at the High Voltage and Short Circuit Laboratory as a laboratory engineer.

Nebeker:

That sounds like a very desirable position for a young engineer.

Thoren:

For a young engineer, yes. It was not in my intention to go that way, but I liked it, so I stayed.

Nebeker:

What sort of work exactly? Can you recall what the projects were at that laboratory?

Thoren:

Oh, at the Short Circuit Laboratory we were testing circuit breakers, fuses, current transformers, and ordinary transformers. We studied short circuits, the ability to withstand short circuits, and the breaking capacity of circuit breakers and fuses. That was the main job.

Product development at Ludvika

Nebeker:

Was the principle testing laboratory for ASEA at Ludvika there?

Thoren:

At Ludvika, yes. It was a rather big laboratory and did mainly development testing.

We didn't do much testing for the workshops. Sometimes we did, because we had the facilities, but normally not.

Nebeker:

So you worked on new products.

Thoren:

New products.

Nebeker:

Were some of them being developed there at Ludvika? New circuit breakers, or new transformers or insulators?

Thoren:

Yes. I worked especially with circuit breakers. That was the main job.

Nebeker:

Who was the leader of the group that you worked for?

Thoren:

Mr. Bükman handled the laboratory at that time.

Nebeker:

How large was that laboratory?

Thoren:

Number of people?

Nebeker:

A dozen people?

Thoren:

No, no, no.

Nebeker:

Or just a …

Thoren:

Maybe a couple of hundred.

Nebeker:

Oh, my goodness, so very large.

Thoren:

Yes, it’s fairly large. They did a lot of development work. For instance, for the 400 KV system of Sweden, which was the first in the world, the equipment was mainly developed in that laboratory.

Nebeker:

Is that right?

Thoren:

The high voltage part.

Nebeker:

When was that system implemented?

Thoren:

'54.

Nebeker:

'54.

Thoren:

Oh, sorry, '52.

Nebeker:

'52.

Thoren:

'52. And that was a line from the northern part of Sweden down to about this area.

Nebeker:

You said you started work there in '45, was it?

Thoren:

Yes, '46.

Nebeker:

Oh, that’s right. You had that period when you were in different departments and in '46 you started in that laboratory.

Thoren:

Yes, yes.

Management position at high-power laboratory and doctoral studies

Nebeker:

How long did you stay there?

Thoren:

Well, part of it in '54, because that laboratory was split in two parts: a high-power laboratory and high-voltage laboratory. I became the manager of the high-power laboratory.

Nebeker:

Okay, I see.

Thoren:

That was a very interesting time, because we built a completely new lab at that time. It wasn’t at Ludvika, but at a different place, and that kept me busy for a number of years.

Nebeker:

Yes, well, that sounds like a very rapid advance from starting there in ‘46 to being head of a laboratory in ‘54.

Thoren:

Well, you know, it was just that progress through career stages was rather rapid. Nowadays there are so many engineers. At that time we were just a few engineers, and you had a chance to get on very rapidly.

Nebeker:

I see that you received your doctor’s degree, the Licentiate, in 1950. Is that right?

Thoren:

Yes, yes.

Nebeker:

What was your thesis for that?

Thoren:

Well, I did my work in parallel with my ordinary job.

Nebeker:

Right.

Thoren:

At the laboratory.

Nebeker:

So you worked full time throughout?

Thoren:

I worked full time, and studied in the evenings.

Nebeker:

I see. This is Transactions of the Royal Institute of Technology, Number 87, 1955, entitled “Synthetic Methods for Interruption Tests on Circuit Breakers.”

Thoren:

I don’t know if that tells you anything at all.

Nebeker:

Well, not very much.

Thoren:


Audio File
MP3 Audio
(302 - thoren - clip 1.mp3)


No. The deal is the following: When you test a circuit breaker you put on voltage and current, and normally from the same source, a high-power generator is needed. Now you cannot always do that because of a lack of power. You don’t have that big high-powered generator. So the general idea in circuit testing is to split it up. You put on current from one source and voltage from another source. Then you can use a current source of very low voltage, and a high voltage source with very low current, so that the power of each of these sources is much reduced. That’s the idea.

Nebeker:

You could, nevertheless, learn the behavior under high voltage, high current.

Thoren:

Yes. What I did was mainly a theoretic study of this, because before, in the '30s and '40s, there were wild ideas about what multiplication factor you can get for the circuit voltage. I did a theoretical study of that, and it showed, first of all, that the multiplication factor was one, or should be very, very, very close to it. Well anyhow, you can always do with some deviation from the 100 percent. And what I tried to calculate was how much you could deviate from the correct value of current and voltages. I found that you could do some. You could test circuit breakers with a breaking capacity of say, five times that of the laboratory, roughly speaking. It depends a little upon the design of the circuit breakers and so on. So that was my thesis.

Nebeker:

This was a mainly theoretical study you said?

Thoren:

It’s mainly stuff. I did some practical work, too. I designed a synthetic circuit, but not a very big one. They didn’t give me access to the main short-circuit generator, but I used some smaller ones, and tried to find out if the theory was right.

Nebeker:

Was there agreement?

Thoren:

Yes, yes, within the limit I had calculated. Later on, when I had left that area, the IEC started writing its specifications for synthetic testing, and I know enough that they used my thesis as a basis.

Nebeker:

When did they start looking at synthetic methods?

Thoren:

In the middle of the fifties or something like that.

Nebeker:

Was this one of the first studies of such methods?

Thoren:

Yes, at that time it was the first to be as thorough as it was.

Nebeker:

Did you come across this problem in your work there, so that it was obvious that a solution would be valuable?

Thoren:

Well, I came across it, actually, when I started my job at the Short Circuit Laboratory, because the power there was not sufficient for testing. Breakers were being developed at that time, so something had to be done. I looked at the previous literature and synthetic testing seemed a good proposition.

Nebeker:

So this had some real influence on practice?

Thoren:

It had some influence. I was happy to learn that people have checked my calculations and they were okay.

Nebeker:

Well, that is a compliment, because there are so many theses that no one else reads.

Thoren:

But I left that field in the middle of ‘54 when I became manager of the High Power Laboratory. I had to build a new lab and that took all my time.

Nebeker:

So you completed this degree in 1950, and in ‘54 you became head of the lab

Thoren:

Yes. There were no means of applying it then at that university. It was in '54 that they accepted it for publication. I wrote my papers on a typewriter and handed it in, and they accepted it.

Nebeker:

That must have been difficult with all these equations to do that with a typewriter.

Thoren:

No, not at all. You leave space and do it by hand.

Management position, Power Systems Consulting Department at Västerås

Nebeker:

I’m just looking at your curriculum vitae here.

Thoren:

Well, to go on, I stayed with the high power laboratory until the middle of the sixties. By then the new lab was in operation. I had put a lot of effort to improve testing and measuring methods, so everybody was fine. Then I found that I had nothing more to do there. At the same time there came an opportunity for me to move to Västerås and start a completely new area of work. At that time computers were coming into use, allowing people to calculate what happens in the networks during short circuits, lightening, and so on. That had been done earlier by hand. Now it could be done by computer. There was a big interest in such calculations. So it was decided to start a small department with highly qualified specialists in these areas. I became the manager of that. We did a lot of work on computer programs.

Nebeker:

This is – I’m reading here – the Power Systems Consulting Department at Västerås.

Thoren:

Yes. Now that started in that way, but they still had specialists in different areas, stability, high voltage, and things like that. Some of these were put together in this consulting department. Our work there was to develop computer programs, and then we worked for different departments within ASEA to make computations for them.

Nebeker:

Do you recall what computers you had there in the beginning and in the mid-sixties? The IBM 360 came out about that time? It doesn’t matter.

Thoren:

I don’t know that because the computers were handled by another department. We just had access to them.

Influence of computers on networks and on network component design

Nebeker:

That started in 1965, and you say that was a new approach to study this using the computer?

Thoren:

Yes, it was a new approach, because you’ve got means to calculate things, and of course, it was very simple to start with. But it became more and more sophisticated. Nowadays they calculate very accurately what happens in a network during a short circuit, or when a lightening flash comes across, or things like that.

Nebeker:

From the viewpoint of the consumer of electricity, such studies are important, I assume, because the network can be run more efficiently?

Thoren:

Yes, more safely.

Nebeker:

With fewer outages and …

Thoren:

Yes, now you can reduce load or something like that. So that’s very valuable. As soon as these means became available, the customers started to require it. They requested us to do calculations to prove that a certain generator was suitable for a certain place in a network. The most efficient way of doing it depends on the system.

Nebeker:

Oh, so some of these studies that your group was doing there were for customers of ASEA in other countries? Or was it mainly Sweden?

Thoren:

They were done for customers in other countries, too, but through other departments. We did some work directly for a customer, but not very much. It was mainly done for our design departments. The sales department especially who wanted to have that information.

Nebeker:

Did the computer make any difference in the design process of things like circuit breakers and lightening arresters, and so on?

Thoren:

Oh, yes, especially lightening arresters. Circuit breakers, not so much, because it’s very difficult to do any theoretic calculations. People still have no algorithm for a circuit breaker. Many have tried.

Nebeker:

Is that right?

Thoren:

Even me. I used that as a basis here for calculating the multiplication factor, but it depends very much upon the algorithm. Theoretically, there are still no good formulas, but of course, the computer will calculate the short circuit current at a certain site. It will also calculate the recovery voltage. You know, when you break up a short circuit, the voltage from the network will strike back in a way. Now it's very important for the circuit breaker to know what that voltage will look like in magnitude, state, and things like that. Computers can calculate that, which helps the designers to design the circuit breakers and especially to check alternative designs. So it was very valuable in that way.

Nebeker:

So for the network as a whole, the computer was valuable. For designing the individual components and arranging them into the network, it was useful.

Thoren:

Yes.

Nebeker:

So that started in ‘65?

Thoren:

It started in ’65 to a small extent at Västerås, and then I went to Ludvika in ‘67. I had a few people working for me here, and then we moved to Ludvika because that was the place where the high-voltage equipment was made.

Research publication, international influence

Nebeker:

In 1960 you published a couple of articles about the ASEA high power laboratory at Ludvika.

Thoren:

Yes.

Nebeker:

Did this new laboratory that you built attract attention from other countries?

Thoren:

Well, it always does. We had a number of visitors coming there, looking at it.

Nebeker:

Well, I know that Swedish High Voltage engineering has always been pioneering.

Thoren:

Well, I must say, I’m not a computer man, so I didn’t do any of the computation myself. I had skilled people who could do that, and I was mainly used for other things within ASEA. You see, at that time ASEA went abroad much more than they had done before. I’m now talking about the end of the sixties, early seventies. We found that people didn’t know ASEA as well as we did in Västerås, so the company put on a program to introduce ASEA in different parts of the world. I took part in that, giving lectures in most countries in the world.

Nebeker:

Is that right?

Thoren:

Yes.

Nebeker:

This was in the late sixties you said?

Thoren:

Starting in the late sixties, and then the seventies was the main time when I did lecturing.

Nebeker:

I see. So this would be lecturing at technical institutes or power utilities?

Thoren:

It was very different. We planned symposia where we invited customers. Some lectures were given at the site of the customers, and also at different places. That brought me around the world. I had the chance to get around to different technical societies, which invited me to give lectures. It was a quite interesting time.

Nebeker:

Can you tell me a little bit about ASEA from your point of view. You mentioned something I didn’t know, that they started selling abroad much more in the late sixties and seventies.

Thoren:

Yes. They sold abroad before that, but mainly separate components: generators, transformers, and things like that. But now, in the sixties, people were asking for…

Nebeker:

Full systems?

Thoren:

Yes.

Work environment at ASEA

Nebeker:

How was ASEA as an employer? Were you always happy with the company?

Thoren:

For most of the time, except for the salary. Otherwise I liked to work with ASEA. You got good opportunities to do different things, and you could change your job if you wanted, so you weren’t stuck there to just design transformers for all your life.

Nebeker:

So a person could request to move to another job?

Thoren:

Oh, yes. You could request and very often you could go to a new area.

Nebeker:

Did they have programs for further education of the engineers within the company?

Thoren:

Not very much at that time, to start with. They had that course for young engineers. It was a one-year course. After that there were no regular courses, but now and then someone arranged for a course. Usually within a department they were giving lectures about the equipment they were manufacturing. Later on it became more common to have courses. I had a course for insulation coordination: how to run the network based on information about different surges and the impact on the equipment and so on. Today I know there are numerous courses that are arranged in a much better way, but when I started at ASEA it was left to private people to arrange something that might be useful.

Nebeker:

Was there generally good morale among the employees of ASEA?

Thoren:

Yes, yes, very.

Nebeker:

Did people tend to stay with the company their whole career?

Thoren:

Many people did. Some people went to the Swedish State Power Board, for instance. They were often recruiting engineers from ASEA. And some, of course, went to other companies, but generally speaking, quite many of them stayed.

Transition to high-voltage system

Nebeker:

How much of the work that you were involved with was related to this moving to higher voltages?

Thoren:

Most of it later on.

Nebeker:

I’m sure all components have to be redesigned.

Thoren:

Yes. Sweden started high-voltage with a 400 k-volt system, you know, inaugurated in ‘52. Then, in the sixties or the seventies, we found that we would have use for 800 KV, which had been started by the Canadians out of Quebec with the first lines in the area of 735 KV. So we had a joint talk with the Swedish state power board designing lines and equipment for 800 KV for Swedish systems.

Nebeker:

Was this in the late fifties, roughly?

Thoren:

No, in the late sixties and early seventies. That came to the sore end.

Nebeker:

Can you tell me a little about that?

Thoren:

Yes, that’s historically interesting, because the idea was that the first line should go from a nuclear power station north of Stockholm, down to the Stockholm area, about this area here. And actually, the line was designed and built, but it was never operated at 800 KV for political reasons. We had a Prime Minister at that time who belonged to the Farmers Party, and he didn’t know anything about technical things. Somebody had got it into his head that this 800 KV line going from the nuclear power station would carry nuclear energy. It was so ridiculous, but that’s the way it was. At the time, the Prime Minister was absolutely against nuclear power. None of the nuclear power stations were built were built during his time. He said no go to this 800 KV. So the State Power Board had to rebuild the line to a double circuit 400 KV, and that is how it is today. Of course, that works just fine, but it’s more costly.

Nebeker:

Was it pretty much his own decision, or did this become a larger political issue?

Thoren:

It became a political issue.

Nebeker:

You’re telling me the main opposition came from people who thought that somehow nuclear energy would come through this line?

Thoren:

Yes, they thought it would be dangerous because of the nuclear power. That’s how the rumors went. So we had to abandon that.

Nebeker:

There were no other 800 KV lines built in Sweden?

Thoren:

No. That was the end of it.

Nebeker:

So 400 KV is the highest?

Thoren:

It’s the highest, yes. And it operates fine. Many of those lines were built. Not only the nuclear power, but also the influence on the general public of the electric field was a big issue at that time.

Nebeker:

Yes, that’s been a big issue in the United States.

Thoren:

It still is in many places. And the funny thing is that the fields around the 400 KV line are higher than the fields around a 800 KV line, because the 800 KV is higher up. It’s a longer distance from the ground to the line.

Nebeker:

Is that right?

Thoren:

The whole thing is so ridiculous. You could laugh at it, but...

Nebeker:

It must have been a big disappointment to the engineers who designed that 800 KV line.

Thoren:

Of course. There is a description of that whole 800 KV system somewhere here.

Nebeker:

Maybe you can point it out to me. I see. Gunnar Janke [spelling?] was the name.

Thoren:

He’s dead now.

Nebeker:

Yes, I’d hoped to talk to him.

Thoren:

That’s a description of how it should have been.

Nebeker:

Can you tell me what part you played in designing that 800 KV system?

Thoren:

Well, in the computer department we did a lot of studies of all the voltages of the line. My part was not a very big one, because it was handled by designers.

Laboratory direction

Nebeker:

So fairly early in your career you became a director, a laboratory director?

Thoren:

Yes.

Nebeker:

Did you like doing that, directing the work of many people?

Thoren:

Sure. Yes, I really liked it. It was a hard time, because there were no eight-hour working days then, but I liked it. I have a pamphlet on that if you’re interested. It’s a little bit off.

Nebeker:

Yes, yes I am. I see, this is a booklet called The ASEA High Power Laboratory. Is this something you wrote?

Thoren:

Yes, but I don’t think my name is on it.

Nebeker:

It’s not mentioned. Is this an extra copy?

Thoren:

Yes it is. You may keep that.

Nebeker:

Thank you very much. I appreciate that.

Thoren:

As a matter of interest they are rebuilding that laboratory now.

Nebeker:

Is that right?

Thoren:

Making it even bigger.

Nebeker:

Maybe we can continue to review your career here.

Collaboration with American Electric Power

Thoren:

I would like to mention our cooperation with American Electric Power.

Nebeker:

Yes, why don’t we do that now.

Thoren:

You probably know about the AEP system. It’s mainly in Illinois I think around there.

Nebeker:

I don't know.

Thoren:

That doesn’t matter. They have 345 KV, and they found that they would need a higher voltage. And then they were shooting for the highest. One of the engineers told me, "Once we get permission to build a new line in a certain area we’ll never get any more permissions, so it needs to be as high a voltage as possible." There are two main reasons for high voltage. One is that you have very long distance transmission, which is the case for Quebec in Canada for instance. It was also the case in Sweden for transmission from the north to the south. There’s a different problem for AEP because they had a rather concentrated system. The other possible reason for using very high voltage is if you have a concentrated system and you need to push large amounts of power from different parts of it. They also had a special problem. They were considering a site for new power stations, which people always opposed. One idea at that time was to put together a number of power stations in a certain area. That way they destroy only the small area around them. It was called the power park. That was one thing that people were thinking about at that time. So they thought they would need higher voltages, and they went around to different manufacturing companies to find out whether they could get some cooperation on help. And they selected ASEA. General Electric was very, very angry about that. They sent a message to the AEP top management trying to talk them into using GE instead. But no way.

Nebeker:

Had General Electric done any very high-voltage work?

Thoren:

No, not really. They had 345 KV.

Nebeker:

They had built that line.

Thoren:

And 500 KV at the West Coast, but that’s all. Well, they selected ASEA as a partner.

[End tape one, side a]

Thoren:

AEP would build the lines, and ASEA would design and develop suitable equipment. We did that. We developed a transformer for, if I remember correctly now, 1600 KV 3-phase, which is over the square root of three to get everything in phase because it was enough costly to build a single-phase transformer, and the line was single-phase, too. We started out and did systems studies for them, and thereafter they really started developing the line. We built a test station near South Bend, and I went over quite often to that station. What we did in that station was mainly investigation of the corona: corona disturbances, corona losses, etc. They tested different bundle configurations and things like that to see what the optimum design would be. There are a number of reports written about that project. You can find them; they are ASEA reports. They will be easy for you to find.

Nebeker:

Okay. I was just noticing here that you’ve listed that you were director of the AEP-ASEA UHV research project from 1969 to 1984. Is that right?

Thoren:

Yes, that’s from the ASEA point. I managed it from here. I didn’t do the job. That was spread out in different departments, but I had to put it together. From the AEP side they had first Howard Barnes. He retired and went to Arizona – and had a lazy time. He was followed by Hal Shearer. You might have heard his name. He was president of the Power Engineering Society for some years. He is retired now, but he’s still alive. If I’m correctly informed, he's managing the American participation in CIGRE. He was my counterpart at that time. There are a number of CIGRE reports listed here.

Nebeker:

Yes, there are a great many.

Thoren:

Then there is a final report, which I have no copies of. It is proprietary; I think it was for AEP, but if you like you can write down the title.

Nebeker:

I’ll just take a look at it.

Thoren:

I suggest you get it from AEP.

Nebeker:

Let me just put it on tape. This is the AEP-ASEA UHV research project report number UHV88-2, July 1988. This is the assessment of final results.

Thoren:

Yes.

Nebeker:

Can I get from you your assessment, looking back on this long period of development, of how the work went, and how important it was?

Thoren:

Well, technically the work was very easy. We had no problems with cooperation with AEP. We helped each other, and there were no real problems. The outcome of the whole thing was something of a disaster. And the reason for that was the oil crisis in your country, which slowed down industrial work. At the end of the seventies AEP found that they didn’t have any use for the high voltage. The manufacturing companies in their area were mostly steel mills and iron foundries and so on. That area went down. In your country people were developing electronics instead. That activity was centered in the southern part of the United States. So finally, after the work had been done, we found there were no markets for it.

Nebeker:

Were there efforts made to find other locations for this ultra-high voltage?

Thoren:

No, not really, because the whole industry of electricity production changed. Now small is beautiful, and instead of building power blocks and transmitting quite a lot of power over long distances, people are building small power stations here and there and everywhere, and the demand for electricity is not so high as it used to be.

Nebeker:

Certainly the growth rate is slower.

Thoren:

Yes, yes.

History of power transmission

Nebeker:

So if we look at the history of power engineering, and especially power transmission, you have, at the very end of the nineteenth century, the development of these AC systems for transmitting power from Niagara Falls to Buffalo. Was there a steady increase in the voltage of this long distance transmission for the next half century or so?

Thoren:

You mean creating transmission?

Nebeker:

Right, was there a gradual increase in the highest voltage used for transmission?

Thoren:

Not gradual, more step-wise. As I said, AEP had 345. Bonneville, in the West, had 500 KV, and that’s the end of the United States. The Canadians had 335. The highest voltage today used is in Russia. They built 1100 KV lines for transmitting power from Siberia to the European part of the country. Then came a new competitor in that field, high-voltage DC. ASEA built the first high-voltage DC system in ‘54, and that was a cable connection between Sweden and the Island of Gotland. That was the first. Then at the end of the fifties more high-voltage DC lines came into operation. ASEA built one on the West Coast in the United States.

Nebeker:

Yes, I know of that line.

Thoren:

After that, the mercury arc wires were superseded by thyristors, solid-state devices, which are much more reliable, with much less outage and so on. Now high-voltage DC has been very common in many parts of the world.

Nebeker:

What sort of voltages are they getting to? Do you know?

Thoren:

Well, I should know, but I would guess 500 KV – 400 or 500 KV.

Nebeker:

Did you have any involvement yourself in high-voltage DC?

Thoren:

Not very much. That was handled by another department within ASEA.

Nebeker:

Was there much transfer of technology from this ultra-high voltage AC to the high voltage DC? Were any of the components transferable?

Thoren:

No, no, not with DC, because that’s entirely different. It’s just a different thing.

Nebeker:

So all the components are different?

Thoren:

Yes. But from the ultra high-voltage development work came a lot of knowledge for AEP, especially for lower voltage, for 745 KV and things like that. They learned a lot about corona influence and things like that. They were actually running this ultra-high-voltage test line after we ended the project just because they wanted to test at other, lower voltages. So some use came out of it.

Nebeker:

Is that also true of the Swedish development of that 800 KV line? Was there some gain from that development? Was there some gain for the 400 KV lines that came out of the work on the 800?

Thoren:

Well, maybe not so much for the line, but we learned a lot about the development of equipment for high voltage and the technique of the insulation of transformers. It was not completely useless.

Nebeker:

Yes.

Thoren:

Development is continuous in the area of developing equipment, and you always learn a little from new equipment.

Nebeker:

How good has the international exchange of knowledge been? You’ve mentioned some contacts that ASEA had with AEP and elsewhere. Is this a field where there is very quick transfer of technique from country to country?

Thoren:

Rather. Mainly because this project with AEP meant having intensive exchange of engineers. I mean, many of ASEA people went over there to talk with AEP, and the AEP people came over here to talk with us. So it was completely open contact.

Publication of corporate research

Nebeker:

You have quite a list of publications here. I’ve often been surprised that companies are often so open about sharing the results of their research. This research and development is very costly, but then results are published.

Thoren:

Well, to a certain limit. When writing a report, you don’t have to tell everything. So there are always things that are kept secret as long as possible. In the long run it is difficult, because other people are doing the same things. But it’s not that manufacturing companies give away what they have.

Nebeker:

They know what they should keep to themselves?

Thoren:

Yes. Many things you can talk about quite openly, because many people know about it, so writing reports is often a way of telling your customers that you know this. But you don’t want to tell your competitors. It’s a certain balance.

Nebeker:

Yes, you want to advertise that you’re able to do this, and show that you really know what you’re talking about, but not reveal everything.

Thoren:

Yes. And that was one of the main reasons why we arranged symposia, for instance. We were telling our customers that we know this. We didn’t tell them exactly how we did it, but we told them that we did it, and we showed them the results.

IEEE and professional groups

Nebeker:

I’m looking here at your professional affiliations. Since I’m employed by the IEEE, I’m interested in your connection with IEEE. What seemed valuable about IEEE to you in your career? Was it mainly the publications that you received, or was it conferences?

Thoren:

No, it was not, especially during the time we worked on the AEP. I was over in the United States quite often, and I would time that so that I could attend the IEEE conference or the Power Engineering Society Conference. I did that quite often. That was certainly valuable. You got to know a number of people. You could discuss things with them. And yes, it was generally valuable.

Nebeker:

You have quite a list of other commissions and professional groups that you’ve been with. Maybe I could ask you about the International Electro-Technical Commission?

Thoren:

The IEC, yes. That’s the board that writes the standards. I was working there for quite a number of years on different committees and working groups.

Nebeker:

I see you’ve listed here, “Swedish delegate in the Committee for Insulation Coordination” for twelve years or so.

Thoren:

Yes, that was my main job. I was also on the Committee for Standard Voltage or something like that. It was a very interesting time, because the IEC was writing standards, and there was rather a clash between different countries. Many already had their standards, and they were trying to combine those to IEC standard, and that’s [Thoren makes a growling noise].

Nebeker:

Right. I know IEEE puts a great deal of effort into its set of standards. Does the IEC usually succeed in resolving these clashes?

Thoren:

More or less.

Nebeker:

Is it the case that there are...?

Thoren:

Well, at the end usually something comes out. The worst thing I was involved in was standard voltages. At the lower end, you know, in Europe you use 220, and 240 in the British Empire part of Europe. They also had that in India and other places. In Continental Europe it was 220, and you know, it’s not easy to combine. The English people claim that they couldn’t use 220, because then they would loose some of the transmission power, which they certainly would. People using 220 said they couldn’t use 240 because the insulation levels were not sufficient. It went on like this for many, many years. The outcome was a compromise on 230.

Nebeker:

Is that right. [laughter]

Thoren:

And then to make it easy for people to adopt that, they changed the boundaries.

Nebeker:

I see, the tolerances where the …

Thoren:

Yes, yes. Then it came out that way, so 230 is now the actual standard for all of Europe, and different countries are trying to comply with that. In Sweden for instance, we are adopting 230. It was not too difficult, because we had 220, and the only problem was at the higher end we didn’t have the insulation levels for 220 plus 15% over what the claim was, so we decided to reduce the upper limit a little. But that was the only way to do something about it. We had another problem at the higher end. The Canadians had 735. You may question these values. Why not 200 instead of 220? Well, it’s very simple. The people decided to use 200 volts, which is a good figure, and then it was considered that you needed 10% higher volts after sending, and then you came to 220.

Nebeker:

I see. I didn’t know that.

Thoren:

And it’s the same at 400 KV, for instance. We actually decided about 380 KV in Sweden because it is the square root of three times 220. But then the 220 was changed to 400 KV. Yes, the 400 KV system was named 400 KV. It was actually higher--something like 420. 400 KV should then have an upper limit of 440, but it was considered that at these voltages you don’t need a 10% difference between sending, so 420 was decided upon. The Canadians had decided upon 700, and then it would go 5% more, then so it came at 735. Then AEP did something different. We decided upon 750. And then to make it even worse, they considered that to be the lower level, and 785 to be the higher level. Now that didn’t do very much, because there are not many connections with the 800 KV system, but that’s the lower end. I mean, when combining or connecting all these countries, it’s useful to have the same voltage.

Nebeker:

Yes, yes, and I know that’s happening more and more, of course, over time.

Thoren:

Yes. Something of the same happened with the frequency. In your country, you run 60 Hertz. In Europe, we run 50, and the reason for that I don’t really know, but there was no talk about connection between the two, so we could choose what we wanted. Sixty is a good figure because you can divide by quite a number of different figures. Fifty can only be divided by two or five. In Sweden we had it at twenty-five to start with, and in many other countries we had a variety of frequencies.

Nebeker:

Yes, I know in England for a long time they had different frequencies.

Thoren:

But when people began to combine their systems we had to join the lines, and fifty hertz was considered okay in Europe, except for railways, where we used to have a lower frequency, sixteen and two-thirds, which is one-third of fifty. That had to do with the special design of the electric motors for the locomotives. In Sweden we have fifteen hertz in the upper North, because of the connection for the …

Nebeker:

The electric trains there?

Thoren:

The electric trains transmitting iron ore from the Swedish mountains to the Norwegian coast run at fifteen.

Nebeker:

Fifteen, I see.

Thoren:

Now all that is no problem, because people are using solid state converters between these different frequencies. That’s easy. You don’t have to rebuild the network.

Nebeker:

Didn’t they have the rotary converters before?

Thoren:

They had rotary converters before. But then we were stuck with one-third or two-thirds of the frequency.

Nebeker:

Well, that is very interesting. I’m noticing here that you had some connection with the Indian Institute of Science in Banglore.

Thoren:

Yes, but not very much. I’ve been to India a couple of times. The first time I went around for four weeks. I got to know some of the Indian professors. We also had some Indian professors over here who were working for us for some time. Then they asked me to do that job for them.

Gunnar Jancke

Nebeker:

I see. I wanted to ask you also about other Swedish power engineers that you have worked with or come in contact with. Are there any that impressed you greatly or that you care to comment on. We mentioned earlier Gunnar Jancke.

Thoren:

Yes.

Nebeker:

Did you work with him?

Thoren:

We worked close together. We were very good friends.

Nebeker:

What can you tell me about him as an engineer?

Thoren:

He was an excellent engineer, not so much in theoretical work, but in practical work. He was the one who got Sweden into 400 KV, for instance.

Nebeker:

He was a leader in that?

Thoren:

That was mainly his job. Of course, other people helped him. I did a little in some ways, but it was actually his job. And also that story with 800 KV. That was his baby.

Nebeker:

I see. So he was the prime mover in those two projects?

Thoren:

Yes, he was. He was chief engineer there, not so very much in management and things like that, but he was the technical leader.

Nebeker:

In the technical design?

Thoren:

I think he had a brilliant idea of what the future would be like.

Nebeker:

So he was one of these engineers with a vision, who saw that certain things might be achieved and pushed for it? What other engineers do you think of as very impressive?

Thoren:

At the Swedish State Power Board, Siguard Smedsfell was working for Jancke for some time. Then he got his own department and he was one of the people working on developing Swedish systems – not the running of them, but the development of them. He was also a very good engineer. I left there more than ten years ago, so many of the names have fallen out of my head. But they had a number of very good engineers at the Power Board.

Nebeker:

Is there anything that I haven’t asked about that you’d like to comment on?

Thoren:

I think I commented on quite a bit: my own job starting with circuit breaker testing, building the laboratory, and then going on to computer work.

Nebeker:

The application of computers?

Inauguration of American Ultra-High Voltage and the Canadian 335 KV

Thoren:

The application of computers. And then we talked about development in Sweden of the 400 KV and 800 KV. We had the American Ultra-High Voltage and the Canadian 335 KV. I was not really much involved in that, but I was there when they put the first line into operation.

Nebeker:

Is that right?

Thoren:

Yes.

Nebeker:

When was that, roughly?

Thoren:

'55, something like that. I was there waiting for things to happen.

Nebeker:

For the sparks to fly?

Thoren:

We had to wait, and wait, and wait, and wait, and wait. Then in the evening they offered us cognac.

Nebeker:

Did it finally work?

Thoren:

Then they finally pushed the button, and the line went into operation, bang, everything went out. They had forgotten the earth connections in one of the towers. But then in the middle of the night it started and it worked all right.

Nebeker:

Okay. So they’d invited quite a number of engineers to see this? Putting the line into use?

Thoren:

Oh, yes. They’d invited quite a crowd. [laughter] We were waiting for something to eat. I think we got some sandwiches. They probably had expected to start the line much earlier, but I remember problems coming up. But it worked, and we were happy, because we had delivered the transformers.

Nebeker:

Oh, I see.

Thoren:

They were our transformers. And some of the equipment was ours, too, and that’s the reason for my being there, just to look at it. I remember the chief engineer, when the thing started, looked at me and said, “The transformers must work!” [laughter] Anyhow, they extended that network later on, and I think they have had good use from it, because it’s a long, long distance from the lake area in Canada down to the Montreal area.

Nebeker:

Well, thank you very much.

[End of interview]