Milestones:Kurobe River No. 4 Hydropower Plant, 1956-63: Difference between revisions

From ETHW
(New page: <p>''Kurobe River No. 4 Hydropower Plant, 1956-63<br><br>Kansai Electric Power Co., Inc., completed the innovative Kurobe River No. 4 Hydropower Plant, including the subterranean power sta...)
 
No edit summary
Line 3: Line 3:
<p></p>
<p></p>


[[Category:Power%2C_energy_%26_industry_application|{{PAGENAME}}]]
<p>[[Category:Power,_energy_&_industry_application|{{PAGENAME}}]] [[Category:Power_generation|{{PAGENAME}}]] [[Category:Hydroelectric_power_generation|{{PAGENAME}}]]&nbsp;Location(s) of Milestone plaque(s):<br>(i) At the entrance of the Kurobe River No.4 Hydropower Plant:<br>Address: Unazuki-machi, Kurobe-shi, Toyama, 938-0200 Japan<br>GPS: N 36.64486 E 137.68964<br>(ii) In front of the Kurobe Dam:<br>Address: Ashikuraji, Tateyama-machi, Nakaniikawa-gun, Toyama, 930-1406 Japan<br>GPS: N 36.56644 E 137.66213<br></p>
[[Category:Power_generation|{{PAGENAME}}]]
 
[[Category:Hydroelectric_power_generation|{{PAGENAME}}]]
<p></p>

Revision as of 14:17, 12 April 2010

Kurobe River No. 4 Hydropower Plant, 1956-63

Kansai Electric Power Co., Inc., completed the innovative Kurobe River No. 4 Hydropower Plant, including the subterranean power station and Kurobe Dam, in 1963. The 275kV long-distance transmission system delivered the generated electric power to the Kansai region and solved serious power shortages, contributing to industrial development and enhancing living standards for the population.

 Location(s) of Milestone plaque(s):
(i) At the entrance of the Kurobe River No.4 Hydropower Plant:
Address: Unazuki-machi, Kurobe-shi, Toyama, 938-0200 Japan
GPS: N 36.64486 E 137.68964
(ii) In front of the Kurobe Dam:
Address: Ashikuraji, Tateyama-machi, Nakaniikawa-gun, Toyama, 930-1406 Japan
GPS: N 36.56644 E 137.66213