Milestones:Adams Hydroelectric Generating Plant, 1895: Difference between revisions

From ETHW
No edit summary
m (Text replacement - " \|IEEE sections=IEEE (.*) Section" to " |IEEE sections=$1")
 
(10 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Milestone box
|Date Dedicated=1990-06-21
|Dedication=17
|Location=Niagara Falls, NY
|IEEE Regions=1
|IEEE sections=Buffalo
|Summary=Niagara Falls, New York, U.S.A. Dedication: June 1990 - IEEE Buffalo Section. Only the 1895 transformer house,(long, grey-roofed building in center of satellite photo) designed by the famous architects McKim, Mead and White, remains at the original location. The entrance to the first Adams plant has been re-erected in the park on Goats Island (between the falls). When the Adams Plant went into operation on August 26, 1895, it represented a key victory for alternating-current systems over direct-current. The clear advantage of high voltage AC for long distance power transmission and the unprecedented size of the plant (it reached its full capacity of ten 5,000-HP generators in May 1900) influenced the future of the electrical industry worldwide.
|Abstract=When the Adams Plant went into operation on August 26, 1895, it represented a key victory for alternating-current systems over direct-current. The clear advantage of high voltage AC for long distance power transmission and the unprecedented size of the plant (it reached its full capacity of ten 5,000-HP generators in May 1900) influenced the future of the electrical industry worldwide.
}}
[[Image:Adams Hydroelectric Generating Plant.jpg|thumb]]  
[[Image:Adams Hydroelectric Generating Plant.jpg|thumb]]  


== Adams Hydroelectric Generating Plant, 1895  ==
== Adams Hydroelectric Generating Plant, 1895  ==


Niagara Falls, NY Dedicated June 1990 - [[IEEE Buffalo Section History|IEEE Buffalo Section]]
Niagara Falls, NY Dedicated June 1990 - [[IEEE Buffalo Section History|IEEE Buffalo Section]]  


''When the Adams Plant went into operation on August 26, 1895, it represented a key victory for alternating-current systems over direct-current. The clear advantage of high voltage AC for long distance power transmission and the unprecedented size of the plant (it reached its full capacity of ten 5,000-HP [[Generators|generators]] in May 1900) influenced the future of the electrical industry worldwide.''  
''When the Adams Plant went into operation on August 26, 1895, it represented a key victory for alternating-current systems over direct-current. The clear advantage of high voltage AC for long distance power transmission and the unprecedented size of the plant (it reached its full capacity of ten 5,000-HP [[Generators|generators]] in May 1900) influenced the future of the electrical industry worldwide.''  
Line 11: Line 21:
On 18 May 1910, the Niagara Transformer Station of the Hydro Electric Power Commission of Ontario began collecting power from several generating stations at Niagara Falls, Ontario and began distributing power from Niagara Falls over a network of transmission lines to loads throughout southern Ontario. It was the first time that power was distributed to an entire region over a long-distance network of high voltage transmission lines.  
On 18 May 1910, the Niagara Transformer Station of the Hydro Electric Power Commission of Ontario began collecting power from several generating stations at Niagara Falls, Ontario and began distributing power from Niagara Falls over a network of transmission lines to loads throughout southern Ontario. It was the first time that power was distributed to an entire region over a long-distance network of high voltage transmission lines.  


By these events, Niagara Falls became established internationally as the birthplace of a new electric utility industry that brought the benefits of large-scale power developments to users spread over vast areas. This arrangement for the generation, transmission and distribution of electric power departed from the prevailing approach of localized developments and formed the basis of the electric utility industry as we know it today. <br> <!-- Adams Hydroelectric  --> <googlemap version="0.9" lat="43.081784" lon="-79.042946" zoom="10" width="300" height="250" controls="small">
By these events, Niagara Falls became established internationally as the birthplace of a new electric utility industry that brought the benefits of large-scale power developments to users spread over vast areas. This arrangement for the generation, transmission and distribution of electric power departed from the prevailing approach of localized developments and formed the basis of the electric utility industry as we know it today.  
43.081784, -79.042946,
Adams Hydroelectric Generating Plant, 1895
Niagara Falls, New York, U.S.A.
</googlemap>


<br> <br>
[[Category:Energy]]


[[Category:Power,_energy_&_industry_application|{{PAGENAME}}]]
{{Milestone|GeoLoc=43.081784, -79.042946|Description=Niagara Falls, New York, U.S.A. Dedication: June 1990 - IEEE Buffalo Section. Only the 1895 transformer house,(long, grey-roofed building in center of satellite photo) designed by the famous architects McKim, Mead and White, remains at the original location. The entrance to the first Adams plant has been re-erected in the park on Goats Island (between the falls). When the Adams Plant went into operation on August 26, 1895, it represented a key victory for alternating-current systems over direct-current. The clear advantage of high voltage AC for long distance power transmission and the unprecedented size of the plant (it reached its full capacity of ten 5,000-HP generators in May 1900) influenced the future of the electrical industry worldwide.}}

Latest revision as of 03:30, 31 December 2015

Date Dedicated
1990-06-21
Dedication #
17
Location
Niagara Falls, NY
IEEE Regions
1
IEEE sections
Buffalo
Achievement date range
1895
Adams Hydroelectric Generating Plant.jpg

Adams Hydroelectric Generating Plant, 1895

Niagara Falls, NY Dedicated June 1990 - IEEE Buffalo Section

When the Adams Plant went into operation on August 26, 1895, it represented a key victory for alternating-current systems over direct-current. The clear advantage of high voltage AC for long distance power transmission and the unprecedented size of the plant (it reached its full capacity of ten 5,000-HP generators in May 1900) influenced the future of the electrical industry worldwide.

In August 1895 the Adams No. 1 generating station of the Niagara Falls Power Company first supplied electric power to local industries in Niagara Falls, New York. This station (now demolished) was the first large-scale multiphase power station with commercial operations at Niagara Falls.

On 18 May 1910, the Niagara Transformer Station of the Hydro Electric Power Commission of Ontario began collecting power from several generating stations at Niagara Falls, Ontario and began distributing power from Niagara Falls over a network of transmission lines to loads throughout southern Ontario. It was the first time that power was distributed to an entire region over a long-distance network of high voltage transmission lines.

By these events, Niagara Falls became established internationally as the birthplace of a new electric utility industry that brought the benefits of large-scale power developments to users spread over vast areas. This arrangement for the generation, transmission and distribution of electric power departed from the prevailing approach of localized developments and formed the basis of the electric utility industry as we know it today.