Early Electrification of Buffalo: 60-Hz Replaces 25-Hz

SHARE |

From GHN

Revision as of 20:22, 8 September 2008 by Cawoody (Talk | contribs)
Jump to: navigation, search

171 This brings us up to 1930 when another great event took place, the start of the 60-Hz system in Western New York and the conversion from 25-Hz to 60-Hz. As outlined below, the conversion in Buffalo took 76 years. (Refer to the two-part article '25-Hz at Niagara Falls - end of an era on the Niagara Frontier' in the Jan/Feb and Mar/Apr 2008 issues of IEEE Power& Energy magazine)

172 1947 - The beginning of end of the 25-Hz system when the company announced no new 25-hz customers. In 1949 the last arc lights were discontinued. They were on Main Street in downtown Buffalo .

173 1952 - Western Division 60-Hz peak load exceeded the 25-Hz peak load. In 1956 the Buffalo downtown dc Edison System was shut down.

174 1956 - Schoellkopf disaster which destroyed Stations 3B and 3C. 25 Hz was still available from other sources but at a higher cost. In the 1960’s the Shredded Wheat Company in Niagara Falls was the last two-phase four-wire customer.

175 1998 - New York Public service Commission approves the elimination of the 25-Hz system by December 31, 2007. Customer contributions were required if repairs exceed $25,000. In 2002 the company initiated an incentive program that provided a limited matching grant to retrofit customer equipment for 60-Hz operation

176 2006 - On October 12 at 8:53 pm, 66-kV transmission conductors came down during the ‘October Surprise’ snow storm. The five remaining customers elected not to contribute to the cost of repairs. Thus ended almost 110 years of 25-Hz service in Buffalo.