Special:Badtitle/NS90:Milestones-Nomination talk:Rincon del Bonete Hydroelectric Plant and Transmission System/Nomination Comments/reply (2)

From ETHW
Revision as of 13:41, 16 August 2012 by Juancarlos (talk | contribs) (Reply to Nomination Comments)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Thanks for your comments.

The article from www.frenchriverland.com mentioned is precisely one of the documents included at the end of the nomination.

It is correct to say that the dam was more or less finished, but a lot of civil works still remained to be completed when the german contractors left the site. Luis Giorgi gives a detailed description in his report.


juan Carlos Miguez