IEEE
You are not logged in, please sign in to edit > Log in / create account  

Milestones:Pinawa Hydroelectric Power Project, 1906

From GHN

Revision as of 17:44, 3 October 2008 by R.colburn (Talk | contribs)
Jump to: navigation, search

Pinawa Hydroelectric Power Project, 1906

On 9 June 1906 the Winnipeg Electric Railway Co. transmitted electric power from the Pinawa generating station on the Winnipeg River to the city of Winnipeg at 60,000 volts. It was the first year-round hydroelectric plant in Manitoba and one of the first to be developed in such a cold climate anywhere in the world.