Pinawa Hydroelectric Power Project, 1906

On 9 June 1906 the Winnipeg Electric Railway Co. transmitted electric power from the Pinawa generating station on the Winnipeg River to the city of Winnipeg at 60,000 volts. It was the first year-round hydroelectric plant in Manitoba and one of the first to be developed in such a cold climate anywhere in the world.