Milestones:Milestones Status Report: Difference between revisions

From ETHW
No edit summary
No edit summary
 
(244 intermediate revisions by 3 users not shown)
Line 1: Line 1:
'''REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS'''
__NOTOC__


'''Last updated: 15 January 2013'''
=== For the Milestone Status report, see [http://ieeemilestones.ethw.org/Milestones_Status_Report http://ieeemilestones.ethw.org/Milestones_Status_Report] ===


This ongoing report shows the status of Milestones in the various stages of the process, updated continually by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. ''Please note the titles given here are shortened or working titles, '''not''' the full or official titles. ''While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: [http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104]    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
[[Category:IEEE]]
 
<br>
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; A. ADVOCATES NEEDED FOR THE FOLLOWING MILESTONES:'''
 
<br>
 
<br>
 
2013-20 CRC102-A Activation 1954 (Region 8, Italy Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:CRC102-A_activated_at_Politecnico_di_Milano_by_Luigi_Dadda http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:CRC102-A_activated_at_Politecnico_di_Milano_by_Luigi_Dadda]
 
<br>
 
<br>2013-27 Invention of Stereo (Region 8, UKRI Section) &nbsp;&nbsp;<br>[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Improvements_in_and_relating_to_Sound-transmission,_Sound-recording_and_Sound-reproduction_systems_by_Alan_Dower_Blumlein http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Improvements_in_and_relating_to_Sound-transmission,_Sound-recording_and_Sound-reproduction_systems_by_Alan_Dower_Blumlein]&nbsp;
 
2013-30 The Abacus (Region 10, Beijing Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_Abacus http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_Abacus]
 
<br>2013-31 Weston Meter (Region 1)&nbsp;http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Weston_Meters &nbsp;
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;'''B. STATUS'''
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;'''B.1 Proposals Being Written on the GHN and Awaiting Submission'''
 
&nbsp;
 
<span style="line-height: 1.5em">2013-12 Bayer Color Filter Array [DBu]&nbsp;</span>[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Color_Filter_Array http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Color_Filter_Array]<span style="line-height: 1.5em">&nbsp;&nbsp;</span>
 
2013-13 Erbium-Doped Fiber Optical Amplifier [MS] (Region 8, UKRI Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Development_of_the_Erbium-Doped_Optical_Fiber_Amplifier http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Development_of_the_Erbium-Doped_Optical_Fiber_Amplifier] <br>
 
<br>
 
2013-15 Interactive Video Games [AM]&nbsp;(Region 1, New Hampshire Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Interactive_Video_Games http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Interactive_Video_Games] &nbsp;
 
<br>2013-19 Virginia Smith HVDC Converter [GC] (Region 5, Denver Section)&nbsp;[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Virginia_Smith_HVDC_Converter_Station_with_Integrated_AC_Voltage_Control_Function http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Virginia_Smith_HVDC_Converter_Station_with_Integrated_AC_Voltage_Control_Function] &nbsp;
 
<br>2013-20 CRC102-A Activation 1954 (Region 8, Italy Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:CRC102-A_activated_at_Politecnico_di_Milano_by_Luigi_Dadda http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:CRC102-A_activated_at_Politecnico_di_Milano_by_Luigi_Dadda]&nbsp;&nbsp;
 
<br>
 
2013-24 ASCII [TB] (Region 1, New Jersey Coast Section) &nbsp;&nbsp;[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:ASCII_MIlestone_-_IEEE_NJ_Coast_Section http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:ASCII_MIlestone_-_IEEE_NJ_Coast_Section]
 
2013-25 TPC-1 Transpacific Cable [HK] (Region 10)&nbsp; [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:TPC-1_System http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:TPC-1_System]
 
<br>2013-27 Invention of Stereo (Region 8, UKRI Section) &nbsp;&nbsp;<br>[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Improvements_in_and_relating_to_Sound-transmission,_Sound-recording_and_Sound-reproduction_systems_by_Alan_Dower_Blumlein http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Improvements_in_and_relating_to_Sound-transmission,_Sound-recording_and_Sound-reproduction_systems_by_Alan_Dower_Blumlein] <br>
 
&nbsp;&nbsp;
 
&nbsp;
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.2. Proposals&nbsp;Submitted Awaiting Advocate Approval'''
 
&nbsp;
 
<br>
 
2013-06 SPARC RISC Architecture [FA-H] (Region 6, Santa Clara Valley Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:SPARC_RISC_Architecture_Introduction,_1987 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:SPARC_RISC_Architecture_Introduction,_1987] <br>
 
&nbsp;
 
2013-07 Cruft High Tension Laboratory [JCM] (Region 1, Boston Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Cruft_HighTension_Laboratory,_Harvard_School_of_Engineering_and_Applied_Science http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Cruft_HighTension_Laboratory,_Harvard_School_of_Engineering_and_Applied_Science] &nbsp;
 
2013-09 Mark 1 Automatic Sequence Controlled Calculator [LF] (Region 1, Boston Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Mark_1_Automatic_Sequence_Controlled_Calculator_(ASCC)_by_Howard_Aiken_and_IBM http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Mark_1_Automatic_Sequence_Controlled_Calculator_(ASCC)_by_Howard_Aiken_and_IBM]&nbsp;&nbsp;<br>
 
<br>
 
2013-16 First RISC Mircoprocessor [FA-H] (Region 6, Oakland East Bay Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_RISC_Microprocessor http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_RISC_Microprocessor] &nbsp;<br>
 
<br>
 
2013-18 Vapor-phase Axial Deposition [DBu] (Region 10, Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Invention_and_development_of_vapor-phase_axial_deposition_(VAD)_method_for_mass_production_of_high-quality_optical_fiber_for_telecommunication http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Invention_and_development_of_vapor-phase_axial_deposition_(VAD)_method_for_mass_production_of_high-quality_optical_fiber_for_telecommunication]&nbsp;&nbsp;<br>
 
<br>2013-22 Introduction of Apple II Computer [EJ] (Region 6, Santa Clara Valley Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Introduction_of_the_Apple_II_Computer:_1977-1978 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Introduction_of_the_Apple_II_Computer:_1977-1978] &nbsp;
 
<br>
 
2103-26 Hertz Generation of Electromagnetic Waves [MSch] (Region 8, Germany Section)&nbsp; [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_generation_and_experimental_proof_of_electromagnetic_waves_1886-1888. http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_generation_and_experimental_proof_of_electromagnetic_waves_1886-1888.]
 
2013-29 Middle and Upper Atmosphere Radar [EM] (Region 10, Kansai Section)[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_MU_%28Middle_and_Upper_atmosphere%29_radar%2C_1984 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_MU_%28Middle_and_Upper_atmosphere%29_radar%2C_1984]
 
2013-30 The Abacus (Region 10, Beijing Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_Abacus http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_Abacus]
 
<br>
 
<br>'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.3.&nbsp;Proposals Approved by Advocates and Awaiting Finalized Citations Approval from Proposers'''
 
<br>
 
<br> 2013-03 First Breaking of Enigma Code by Polish Cipher Bureau [IE] (Region 8) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_First_Breaking_of_Enigma_Code_by_the_Team_of_Polish_Cipher_Bureau%2C_1932-39 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_First_Breaking_of_Enigma_Code_by_the_Team_of_Polish_Cipher_Bureau%2C_1932-39] &nbsp;
 
<br>
 
<br>
 
2013-28 Apple I Computer [EJ] (Region 6, Santa Clara Valley Section)&nbsp;[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Introduction_of_the_Apple_I_Computer:_1976 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Introduction_of_the_Apple_I_Computer:_1976]
 
<br>
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
 
'''&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; B.4.&nbsp;Proposals Ready for History Committee Action'''
 
2012-05 Bell Laboratories Inc., The First 60 Years [DM] (Region 1, North New Jersey Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984] &nbsp; <br>
 
<br> '''B.5.1&nbsp;Proposals Approved By History&nbsp;Committee Ready for Board of Directors Action'''
 
2012-06 High Temperature Superconductivity [GC] (Region 5, Houston Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity] &nbsp;
 
2013-10 20-inch Diameter Photomultiplier Tubes [SMiz] (Region 10, Nagoya Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_20_inch_Diameter_Photomultiplier_Tubes http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_20_inch_Diameter_Photomultiplier_Tubes] &nbsp;
 
2013-11 Ampex Videorecorder [LL] (Region 6) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Ampex_Videotape_Recorder_-_1956 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Ampex_Videotape_Recorder_-_1956] &nbsp;
 
<br>
 
2013-14 Battery Industries in Japan [HK] (Region 10, Kansai Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Birth_and_Growth_of_Primary_and_Secondary_Battery_Industries_in_Japan http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Birth_and_Growth_of_Primary_and_Secondary_Battery_Industries_in_Japan] &nbsp;
 
2013-17 Rheinfelden Hydroelectric Power Plant [JCM] (Region 8, Germany Section, PES) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Rheinfelden_Hydroelectric_Power_Plant,_1898_-_2010 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Rheinfelden_Hydroelectric_Power_Plant,_1898_-_2010] &nbsp;
 
2013-21 First Blind Flight [MS] (Region 1, Long Island Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Blind_Flight%3A_A_Joint_IEEE-AIAA_Milestone_Proposal http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Blind_Flight%3A_A_Joint_IEEE-AIAA_Milestone_Proposal] &nbsp;
 
2013-23 PC Operating System 1974 [TB] (Region 6, Santa Clara Valley Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:BIRTH_OF_THE_PC_OPERATING_SYSTEM_1974 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:BIRTH_OF_THE_PC_OPERATING_SYSTEM_1974] <br>
 
<br>
 
2013-08 Birthplace of Silicon Valley [TB] (Region 6, Santa Clara Valley Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_Birthplace_of_Silicon_Valley http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_Birthplace_of_Silicon_Valley] &nbsp;
 
<br><br>
 
<br>'''B.5.2 Proposals Submitted to Board of Directors for&nbsp;Action<br>'''
 
<br>
 
<br>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; '''B.6. Dedications Scheduled or Being Planned, all Approvals Having Been Received'''
 
<br>
 
<br>&nbsp;
 
<br>
 
<br> 2012-07 Line Spectrum Pair Technology for Speech Coding [MB] (Region 10, Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975] &nbsp;
 
<br>2013-01 Gapless Metal Oxide Surge Arrester [DB] (Region 10, Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975] &nbsp;
 
<br>
 
<br>
 
2013-02 Unidirectional Microphone [APY] (Region 4, Chicago Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Unidirectional_Microphone http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Unidirectional_Microphone] &nbsp;
 
<br>2013-04 Sharp Thin-Film Transistor LCD [HK] (Region 10, Kansai Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Sharp_14-inch_thin-film-transistor_liquid-crystal_display_%28TFT-LCD%29_for_TV%2C_which_has_ushered_in_TFT_LCD_industry http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Sharp_14-inch_thin-film-transistor_liquid-crystal_display_%28TFT-LCD%29_for_TV%2C_which_has_ushered_in_TFT_LCD_industry] &nbsp;
 
<br>
 
<br>2013-05 (Region 7, Vancouver Section) [DBar] First Digitally Processed SAR Image [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Digitally_Processed_Image_from_a_Spaceborne_Synthetic_Aperture_Radar http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Digitally_Processed_Image_from_a_Spaceborne_Synthetic_Aperture_Radar] &nbsp;
 
<br><br>
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.7 DEDICATIONS HELD THIS YEAR
 
2011-07 Pioneering Laptop Computer (Region 10, Tokyo Section), Dedication: 29&nbsp;October 2013 &nbsp;[http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985 www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985] &nbsp;
 
2012-02 Invention of Holography, 12 June 2013 (Region 8, UKRI Section) [http://www.ieeeghn.org/wiki/index.php/Milestones:Invention_of_Holography http://www.ieeeghn.org/wiki/index.php/Milestones:Invention_of_Holography] &lt;span id="fck_dom_range_temp_1373981674640_225" /&gt;
 
&nbsp;
 
2012-03 Krka-Sibenik Power System (Region 8, Croatia Section) Dedication: 5 July 2013&nbsp;[http://www.ieeeghn.org/wiki/index.php/Milestones:Krka-%C5%A0ibenik_Electric_Power_System,_1895 http://www.ieeeghn.org/wiki/index.php/Milestones:Krka-%C5%A0ibenik_Electric_Power_System,_1895] &nbsp;&nbsp;<br><br>
 
<br>2012-04 First AIEE Technical Meeting (Region 2, Philadelphia Section) 15 December 2013&nbsp;[http://www.ieeeghn.org/wiki/index.php/Milestones:First_Technical_Meeting_of_the_American_Institute_of_Electrical_Engineers,_1884 First_Technical_Meeting_of_the American Institute of Electrical Engineers, 1884] &nbsp;
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;B.8. DEDICATIONS HELD IN&nbsp;2012 (For a list of all Milestones dedicated, see [[Milestones:List of IEEE Milestones|List of Dedicated Milestones]] )
 
2010-04 Field Effect Electron Microscope, 31 January 2012 (R10 -- Tokyo)
 
2010-03 G3 Facsimile, 5 April 2012 (R10 – Tokyo Section)
 
2011-09 Low Loss Optical Fiber, 1 May 2012 (R1 -- Photonics Society)
 
2011-02 B&amp;O Railroad electrification 21 June 2012 (R2 – Baltimore Section)
 
2010-10 LORAN, 27 June 2012 (R1 – Boston Section)
 
2010-11 Whirlwind Computer 27 June 2012 (R1 – Boston Section)
 
2011-04 SAGE system, 27 June 2012 (R1 – Boston Section)
 
2009-09 First Reliable HV Fuse, 3 August 2012 (R4 – Chicago Section)
 
2011-08 Floating Gate EEPROM, 21 August 2012 (R6, Santa Clara Valley Section)<br>
 
2009-05 Bose experiments in radio, 15 September 2012 (R10 – Central India)
 
2009-04 Raman Effect, 15 September 2012 (R10 – Central India Section)
 
2009-06 Bar Code, 22 October 2012 (R2 Philadelphia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Birthplace_of_the_Bar_Code,_1948 http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Birthplace_of_the_Bar_Code,_1948] &nbsp;
 
2012-01 First Optical Fiber Laser and Amplifier, 26 October 2012, Photonics Society [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:First_Optical_Fiber_Laser_and_Amplifier http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:First_Optical_Fiber_Laser_and_Amplifier]&nbsp;
 
&nbsp;2011-05 Rincon del Bonete [LF] (R9 – Uruguay Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Rincon_del_Bonete_Hydroelectric_Plant_and_Transmission_System http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Rincon_del_Bonete_Hydroelectric_Plant_and_Transmission_System] &nbsp;
 
<br>
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.9. DEDICATIONS HELD DURING THE PREVIOUS YEAR
 
2009-07 Eel River HVDC Converter (R7) 24 February 2011<br>2009-12 Mercury Spacecraft controls 24 February 2011 (R5)<br>2010-01 SPICE Circuit Simulation Program 20 February 2011 (R6)<br>2010-05 Discovery of Superconductivity 8 April 2011 (R8)<br>2008-18 Marconi’s First Wireless Experiments, 29 April 2011 (R8) <br>2010-06 Pearl Street Station, 10 May 2011 (R1)<br>2010-08 Lunar Module 20 July 2011 (R1)<br>2009-13 First Satellite Broadcast to the Public, 18 November 2011 (R10 – Tokyo Section)<br>2010-09 Real-Time Packet Switching 8 December 2011 (R1 – Sig Proc Soc.)<br>2010-02 Apollo Guidance Computer 13 December 2011 (R1 Boston Section)
 
<br>
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;C. POTENTIAL&nbsp;MILESTONES&nbsp;BEING&nbsp;RESEARCHED&nbsp;OR EXPLORED
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; '''(that&nbsp;History Center staff&nbsp;are aware of)
 
High performance Perpendicular Magnetic Recording, 1977
 
Cellular radio
 
First All-Electronic Television Broadcasts (BBC)
 
London to&nbsp;Adelaide telegraph line&nbsp;<br>
 
Charles Kao optical fiber (R8 UKRI Section)
 
John Logie Baird television (R8 UKRI Section)
 
Harrisons clock (R8 UKRI Section)
 
Photovoltaic effect (R8 – France) &nbsp;<br>
 
RCA Victor (R2 Philadelphia Section)
 
386 Micro (Region 6, Santa Clara Valley Section)<br><br>4004 Micro (Region 6, Santa Clara Valley Section)<br>
 
Canadian Niagara Plant (Region 7)
 
<br>Oberlin-Smith electromagnetic recording (Region 2, South Jersey&nbsp;Section) (possible ASME codesignation?)
 
<br>
 
<br>
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; D. OTHER MILESTONES ACTIVITY
 
[[Milestones:Milestone Guidelines and How to Propose a Milestone|Return to Milestone Program Guidelines]]
 
[[Category:IEEE|{{PAGENAME}}]]

Latest revision as of 15:46, 9 May 2016


For the Milestone Status report, see http://ieeemilestones.ethw.org/Milestones_Status_Report