IEEE
You are not logged in, please sign in to edit > Log in / create account  

Milestones:Milestones Status Report

From GHN

(Difference between revisions)
Jump to: navigation, search
(B.6. DEDICATIONS BEING PLANNED, ALL APPROVALS HAVING BEEN RECEIVED)
 
(228 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
__NOTOC__
 +
 
'''REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS'''  
 
'''REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS'''  
  
'''Last updated: 16 May 2013'''  
+
'''Last updated: 14 April 2014'''  
 
+
This is an ongoing report showing the status of Milestones in the various stages of the process, updated continually by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. ''Please note the titles given here are shortened or working titles, '''not''' the full or official titles. ''While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: [http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104]    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
+
 
+
Total dedicated milestones: 130, dedicated special citations: 1
+
 
+
Total Approved milestones: 131, approved special citations: 1
+
 
+
'''                                           A. ADVOCATES NEEDED FOR THE FOLLOWING MILESTONES:'''
+
 
+
2013-06 SPARC RISC Architecture (Region 6, Santa Clara Valley Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:SPARC_RISC_Architecture_Introduction,_1987 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:SPARC_RISC_Architecture_Introduction,_1987]<br>
+
 
+
<br>
+
 
+
&nbsp;
+
 
+
&nbsp;2013-09 Mark 1 Automatic Sequence Controlled Calculator (Region 1, Boston Section)&nbsp;[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Mark_1_Automatic_Sequence_Controlled_Calculator_(ASCC)_by_Howard_Aiken_and_IBM http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Mark_1_Automatic_Sequence_Controlled_Calculator_(ASCC)_by_Howard_Aiken_and_IBM]&nbsp;
+
 
+
2013-12 Bayer&nbsp;Color Filter Array [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Color_Filter_Array http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Color_Filter_Array]
+
 
+
2013-13 Erbium-Doped Fiber Optical Amplifier (Region 8, UKRI) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Development_of_the_Erbium-Doped_Optical_Fiber_Amplifier http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Development_of_the_Erbium-Doped_Optical_Fiber_Amplifier] <br>
+
 
+
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B. STATUS'''
+
 
+
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;'''B.1 Proposals Being Written on the GHN and Awaiting Submission'''
+
 
+
2013-03 First Breaking of Enigma Code by Polish Cipher Bureau [IE] (Region 8) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_First_Breaking_of_Enigma_Code_by_the_Team_of_Polish_Cipher_Bureau%2C_1932-39 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_First_Breaking_of_Enigma_Code_by_the_Team_of_Polish_Cipher_Bureau%2C_1932-39] &nbsp;
+
 
+
2013-08 Birthplace of Silicon Valley [TB] (Region 6, Santa Clara Valley Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_Birthplace_of_Silicon_Valley http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_Birthplace_of_Silicon_Valley] &nbsp;
+
 
+
2013-11 Ampex Videorecorder [LL] (Region 6) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Ampex_Videotape_Recorder_-_1956 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Ampex_Videotape_Recorder_-_1956] &nbsp;
+
 
+
2013-12 Bayer Color Filter Array [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Color_Filter_Array http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Color_Filter_Array] &nbsp;
+
 
+
2013-13 Erbium-Doped Fiber Optical Amplifier (Region 8, UKRI) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Development_of_the_Erbium-Doped_Optical_Fiber_Amplifier http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Development_of_the_Erbium-Doped_Optical_Fiber_Amplifier] <br>
+
 
+
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.2. Proposals&nbsp;Submitted Awaiting Advocate Approval'''
+
 
+
2011-06 First Industrial Scale Nuclear Reactor [EJ] (Region 6 Richland Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Industrial_Scale_Nuclear_Reactor http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Industrial_Scale_Nuclear_Reactor]
+
 
+
<br>
+
 
+
2012-05 Bell Laboratories Inc., The First 60 Years [DM] (Region 1 North New Jersey Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984] &nbsp;
+
 
+
&nbsp;
+
 
+
2012-06 High Temperature Superconductivity [GC] (Region 5 Houston Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity]
+
 
+
<br>
+
 
+
2013-01 Gapless Metal Oxide Surge Arrester [DB] (Region 10 Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975]&nbsp;&nbsp;
+
 
+
<br>
+
 
+
2013-07 Cruft High Tension Laboratory [JCM] (Region 1, Boston Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Cruft_HighTension_Laboratory,_Harvard_School_of_Engineering_and_Applied_Science http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Cruft_HighTension_Laboratory,_Harvard_School_of_Engineering_and_Applied_Science] &nbsp;
+
 
+
2013-09 Mark 1 Automatic Sequence Controlled Calculator (Region 1, Boston Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Mark_1_Automatic_Sequence_Controlled_Calculator_(ASCC)_by_Howard_Aiken_and_IBM http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Mark_1_Automatic_Sequence_Controlled_Calculator_(ASCC)_by_Howard_Aiken_and_IBM]&nbsp;&nbsp;<br>
+
 
+
2013-10 20-inch Diameter Photomultiplier Tubes [SMiz] (Region 10, Nagoya Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_20_inch_Diameter_Photomultiplier_Tubes http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_20_inch_Diameter_Photomultiplier_Tubes] &nbsp;
+
 
+
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.3.&nbsp;Proposals Approved by Advocates and Awaiting Finalized Citations Approval from Proposers'''
+
 
+
<br>2012-07 Line Spectrum Pair Technology for Speech Coding [MB] (Region 10, Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975] &nbsp;
+
 
+
&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;
+
 
+
'''&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; B.4.&nbsp;Proposals Ready for History Committee Action'''
+
 
+
2013-02 Unidirectional Microphone [APY] (Region 4 Chicago Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Unidirectional_Microphone http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Unidirectional_Microphone] &nbsp;
+
 
+
<br>2013-04 Sharp Thin-Film Transistor LCD [HK] (Region 10, Kansai Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Sharp_14-inch_thin-film-transistor_liquid-crystal_display_%28TFT-LCD%29_for_TV%2C_which_has_ushered_in_TFT_LCD_industry http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Sharp_14-inch_thin-film-transistor_liquid-crystal_display_%28TFT-LCD%29_for_TV%2C_which_has_ushered_in_TFT_LCD_industry]&nbsp;&nbsp;
+
 
+
<br>
+
  
2013-05 (Region 7, Vancouver Section) [DBar] First Digitally Processed SAR Image [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Digitally_Processed_Image_from_a_Spaceborne_Synthetic_Aperture_Radar http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Digitally_Processed_Image_from_a_Spaceborne_Synthetic_Aperture_Radar] &nbsp;  
+
This ongoing report shows the status of Milestones in the various stages of the process, updated continually by IEEE&nbsp;History Center staff. Milestones are listed&nbsp;with their docket numbers. The&nbsp;IEEE Region and the sponsoring organizational unit are shown in parentheses. ''Please note the titles given here&nbsp;are shortened or working titles, '''not''' the full or official titles. ''While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets.&nbsp;Proposals in progress can be viewed on the IEEE Global History Network at: [http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&amp;from=&amp;namespace=104]&nbsp;&nbsp;&nbsp;  
  
<br>'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.5.&nbsp;Proposals Ready for Board of Directors Action'''
+
To see a count of how many IEEE Milestones have been dedicated, click [[Milestones:List of Milestones by Dedication Year|List of Milestones by Dedication Year]] ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
  
2011-07 Pioneering Laptop Computer [APY] (Region 10 – Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985 www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985] &nbsp;
+
== A. ADVOCATES NEEDED FOR THE FOLLOWING MILESTONES: ==
  
<br>
+
{| border="1" cellspacing="1" cellpadding="1" width="600"
 +
|-
 +
| '''Docket Number'''
 +
| '''Short Name'''
 +
| '''Advocate initials'''
 +
| '''Region'''
 +
| '''Sponsoring Org Unit'''
 +
| '''Submitted Date'''
 +
|-
 +
|2013-20
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:CRC102-A_activated_at_Politecnico_di_Milano_by_Luigi_Dadda  CRC102-A Activation 1954]
 +
|
 +
|8
 +
|Italy Section
 +
|
 +
|-
 +
|2014-01
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:%22Mother_of_All_Demos%22  Mother of All Demos]
 +
|
 +
|6
 +
|Santa Clara Valley Section
 +
|
 +
|-
 +
| 2014-02
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Zenit_three-coordinate_L-band_pulsed_radar,_1938  Zenit Three-Coordinate L-band Pulsed Radar, 1938]
 +
|
 +
|8
 +
|Ukraine Section
 +
|10 April 2014
 +
|}
  
2012-04 First AIEE Technical Meeting [DBar] (Region 2 -- Philadelphia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Technical_Meeting_of_AIEE_1884 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Technical_Meeting_of_AIEE_1884] &nbsp;
 
  
<br>2012-03 Krka-Sibenik Power System [EJ] (Region 8 Croatia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System] &nbsp;
+
== B. STATUS ==
  
<br>
+
=== B.1 PROPOSALS BEING WRITTEN ON THE GHN AND AWAITING SUBMISSION ===
  
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.6. Dedications Scheduled or Being Planned, all Approvals Having Been Received'''  
+
{| border="1" cellspacing="1" cellpadding="1" width="600"
 +
|-
 +
| '''Docket Number'''  
 +
| '''Short Name'''
 +
| '''Advocate initials'''
 +
| '''Region'''
 +
| '''Sponsoring Org Unit'''
 +
| '''Submitted Date'''
 +
|-
 +
|2013-09
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Harvard_Mark_1_Computer,_1944_-_1959  Mark 1 Automatic Sequence Controlled Calculator]
 +
|LF
 +
|1
 +
|Boston Section
 +
|
 +
|-
 +
|2013-12
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Color_Filter_Array  Bayer Color Filter Array]
 +
|DBu
 +
|
 +
|
 +
|
 +
|-
 +
|2013-13
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Development_of_the_Erbium-Doped_Optical_Fiber_Amplifier  Erbium-Doped Fiber Optical Amplifier]
 +
|MS
 +
|8
 +
|UKRI Section
 +
|
 +
|-
 +
|2013-20
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:CRC102-A_activated_at_Politecnico_di_Milano_by_Luigi_Dadda  CRC102-A Activation 1954]
 +
|
 +
|8
 +
|Italy Section
 +
|
 +
|-
 +
|2013-27
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Improvements_in_and_relating_to_Sound-transmission,_Sound-recording_and_Sound-reproduction_systems_by_Alan_Dower_Blumlein  Stereo Sound Recording]
 +
|JImp
 +
|8
 +
|UKRI Section
 +
|
 +
|-
 +
|2013-31
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Weston_Meters  Weston Meter]
 +
|EMat
 +
|1
 +
|North New Jersey Section
 +
|
 +
|-
 +
|2014-01
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:%22Mother_of_All_Demos%22  Mother of All Demos]
 +
|
 +
|6
 +
|Santa Clara Valley Section
 +
|
 +
|-
 +
|}
  
<br>2012-02 Invention of Holography, 12 June 2013&nbsp;(Region 8, UKRI Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Invention_of_Holography_by_Dennis_Gabor http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Invention_of_Holography_by_Dennis_Gabor]&nbsp;&nbsp;&nbsp;
+
=== B.2. PROPOSALS SUBMITTED AWAITING ADVOCATE APPROVAL ===
  
<br>
+
{| border="1" cellspacing="1" cellpadding="1" width="600"
 +
|-
 +
| '''Docket Number'''
 +
| '''Short Name'''
 +
| '''Advocate initials'''
 +
| '''Region'''
 +
| '''Sponsoring Org Unit'''
 +
| '''Submitted Date'''
 +
|-
 +
|2013-07
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Cruft_HighTension_Laboratory,_Harvard_School_of_Engineering_and_Applied_Science  Cruft High Tension Laboratory]
 +
|JCM
 +
|1
 +
|Boston Section
 +
|28 March 2014
 +
|-
 +
|2013-18
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Invention_and_development_of_vapor-phase_axial_deposition_(VAD)_method_for_mass_production_of_high-quality_optical_fiber_for_telecommunication  Vapor-phase Axial Deposition]
 +
|DBu
 +
|10
 +
|Tokyo Section
 +
|19 June 2013
 +
|-
 +
|2013-19
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Virginia_Smith_HVDC_Converter_Station_with_Integrated_AC_Voltage_Control_Function  Virginia Smith HVDC Converter]
 +
|GC
 +
|5
 +
|Denver Section
 +
|10 February 2014
 +
|-
 +
|2013-29
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_MU_%28Middle_and_Upper_atmosphere%29_radar%2C_1984  Middle and Upper Atmosphere Radar]
 +
|EM
 +
|10
 +
|Kansai Section
 +
|25 February 2014
 +
|-
 +
|2014-02
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Zenit_three-coordinate_L-band_pulsed_radar,_1938  Zenit Three-Coordinate L-band Pulsed Radar, 1938]
 +
|
 +
|8
 +
|Ukraine Section
 +
|10 April 2014
 +
|}
  
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;B.8. DEDICATIONS HELD IN&nbsp;2012''' (For a list of all Milestones dedicated, see [[Milestones:List of IEEE Milestones|List of Dedicated Milestones]] )
+
=== B.3.&nbsp;PROPOSALS APPROVED BY ADVOCATES AND AWAITING FINALIZED CITATIONS APPROVAL FROM PROPOSERS ===
  
2010-04 Field Effect Electron Microscope, 31 January 2012 (R10 -- Tokyo)  
+
{| border="1" cellspacing="1" cellpadding="1" width="600"
 +
|-
 +
| '''Docket Number'''
 +
| '''Short Name'''
 +
| '''Advocate initials'''
 +
| '''Region'''
 +
| '''Sponsoring Org Unit'''
 +
| '''Submitted Date'''
 +
|-
 +
|2013-24
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:ASCII_MIlestone_-_IEEE_NJ_Coast_Section  ASCII]
 +
|TB
 +
|1
 +
|New Jersey Coast Section
 +
|3 April 2014
 +
|-
 +
|2014-03
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Trans-Atlantic_Telephone_Fiber-optic_Submarine_Cable_(TAT-8)_-_1988  TAT-8 Fiber Optic Cable]
 +
|TB
 +
|2
 +
|New Jersey Coast Section
 +
|3 April 2014
 +
|}
  
2010-03 G3 Facsimile, 5 April 2012 (R10 – Tokyo Section)
+
=== B.4.&nbsp;PROPOSALS READY FOR HISTORY COMMITTEE ACTION ===
  
2011-09 Low Loss Optical Fiber, 1 May 2012 (R1 -- Photonics Society)
+
{| border="1" cellspacing="1" cellpadding="1" width="600"
 +
|-
 +
| '''Docket Number'''
 +
| '''Short Name'''
 +
| '''Advocate initials'''
 +
| '''Region'''
 +
| '''Sponsoring Org Unit'''
 +
|-
 +
|2013-15
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Interactive_Video_Games  Interactive Video Games]
 +
|AM
 +
|1
 +
|New Hampshire Section
 +
|}
  
2011-02 B&amp;O Railroad electrification 21 June 2012 (R2 – Baltimore Section)
+
=== B.5.1&nbsp;PROPOSALS APPROVED BY HISTORY COMMITTEE READY FOR BOARD OF DIRECTORS ACTION ===
  
2010-10 LORAN, 27 June 2012 (R1 – Boston Section)
+
'''(The schedule for upcoming Board of Directors meetings can be found in the right hand column of &nbsp;[http://www.ieee.org/about/corporate/board/index.html http://www.ieee.org/about/corporate/board/index.html] or at [http://www.ieee.org/documents/upcoming_series.pdf Upcoming Series]&nbsp;) &nbsp;'''
 +
{| border="1" cellspacing="1" cellpadding="1" width="600"
 +
|-
 +
| '''Docket Number'''
 +
| '''Short Name'''
 +
| '''Advocate initials'''
 +
| '''Region'''
 +
| '''Sponsoring Org Unit'''
 +
|-
 +
|2012-05
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984  Bell Laboratories Inc., The First 60 Years]
 +
|DMi
 +
|1
 +
|North New Jersey Section
 +
|-
 +
|2013-03
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_First_Breaking_of_Enigma_Code_by_the_Team_of_Polish_Cipher_Bureau%2C_1932-39  First Breaking of Enigma Code by Polish Cipher Bureau]
 +
|IE
 +
|8
 +
|Poland Section
 +
|-
 +
|2013-06
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:SPARC_RISC_Architecture_Introduction,_1987  SPARC RISC Architecture]
 +
|F-AH
 +
|6
 +
|Santa Clara Valley Section
 +
|-
 +
|2013-16
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_RISC_Microprocessor  First RISC Mircoprocessor]
 +
|F-AH
 +
|6
 +
|Oakland East Bay Section
 +
|-
 +
|2013-22
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Introduction_of_the_Apple_II_Computer:_1977-1978  Introduction of Apple II Computer]
 +
|EJ
 +
|6
 +
|Santa Clara Valley Section
 +
|-
 +
| 2013-25
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:TPC-1_System  TPC-1 Transpacific Cable]
 +
|HK
 +
|10
 +
|Tokyo Section
 +
|-
 +
|2103-26
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_generation_and_experimental_proof_of_electromagnetic_waves_1886-1888.  Hertz Generation of Electromagnetic Waves]
 +
|MSch
 +
|8
 +
|Germany Section
 +
|-
 +
|2013-28
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Introduction_of_the_Apple_I_Computer:_1976  Apple I Computer]
 +
|EJo
 +
|6
 +
|Santa Clara Valley
 +
|}
  
2010-11 Whirlwind Computer 27 June 2012 (R1 – Boston Section)
+
=== B.6. DEDICATIONS BEING PLANNED, ALL APPROVALS HAVING BEEN RECEIVED ===
  
2011-04 SAGE system, 27 June 2012 (R1 – Boston Section)  
+
{| border="1" cellspacing="1" cellpadding="1" width="600"
 +
|-
 +
| '''Docket Number'''
 +
| '''Short Name'''
 +
| ''' '''
 +
| '''Region'''
 +
| '''Sponsoring Org Unit'''
 +
| '''Dedication Date'''
 +
|-
 +
|2012-06
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity  High Temperature Superconductivity]
 +
|GCo
 +
|5
 +
|Houston Section
 +
|
 +
|-
 +
|2012-07
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975  Line Spectrum Pair Technology for Speech Coding]
 +
|
 +
|10
 +
|Tokyo Section
 +
|22 May 2014
 +
|-
 +
|2013-01
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975  Gapless Metal Oxide Surge Arrester]
 +
|
 +
|10
 +
|Tokyo Section
 +
|18 August 2014
 +
|-
 +
|2013-04
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Sharp_14-inch_thin-film-transistor_liquid-crystal_display_%28TFT-LCD%29_for_TV%2C_which_has_ushered_in_TFT_LCD_industry  Sharp Thin-Film Transistor LCD]
 +
|
 +
|10
 +
|Kansai Section
 +
|10 June 2014
 +
|-
 +
|2013-08
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_Birthplace_of_Silicon_Valley  Birthplace of Silicon Valley]
 +
|TB
 +
|6
 +
|Santa Clara Valley Section
 +
|TBD
 +
|-
 +
|2013-10
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_20_inch_Diameter_Photomultiplier_Tubes  20-inch Diameter Photomultiplier Tubes]
 +
|SMiz
 +
|10
 +
|Nagoya Section
 +
|TBD
 +
|-
 +
|2013-11
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Ampex_Videotape_Recorder_-_1956  Ampex Videorecorder]
 +
|LL
 +
|6
 +
|
 +
|TBD
 +
|-
 +
|2013-17
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Rheinfelden_Hydroelectric_Power_Plant,_1898_-_2010  Rheinfelden Hydroelectric Power Plant]
 +
|
 +
|8
 +
|Germany Section/Power Eng. Soc.
 +
|25 September 2014
 +
|-
 +
|2013-21
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Blind_Flight%3A_A_Joint_IEEE-AIAA_Milestone_Proposal  First Blind Flight]
 +
|
 +
|1
 +
|Long Island Section
 +
|24 September 2014
 +
|-
 +
|2013-23
 +
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:BIRTH_OF_THE_PC_OPERATING_SYSTEM_1974  CPM Operating System 1974]
 +
|
 +
|6
 +
|Santa Clara Valley Section
 +
|25 April 2014
 +
|}
  
2009-09 First Reliable HV Fuse, 3 August 2012 (R4 – Chicago Section)
+
=== B.7 DEDICATIONS HELD ===
  
2011-08 Floating Gate EEPROM, 21 August 2012 (R6, Santa Clara Valley Section)<br>
+
&nbsp;For a list by dedication date of all IEEE Milestones dedicated from the beginning of the Milestone Program, see [[Milestones:List of Milestones by Dedication Year|List of Milestones by Dedication Year]]
  
2009-05 Bose experiments in radio, 15 September 2012 (R10 – Central India)
+
<br> For a list of dedicated Milestones in chronological order by date of achievement, see [[Milestones:List of IEEE Milestones|Chronological List of Milestones]]
  
2009-04 Raman Effect, 15 September 2012 (R10 – Central India Section)
+
For a list of dedicated Milestones by Region, see [[Milestones:List of Milestones by Region|List of Dedicated Milestones by Region]]
  
2009-06 Bar Code, 22 October 2012 (R2 Philadelphia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Birthplace_of_the_Bar_Code,_1948 http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Birthplace_of_the_Bar_Code,_1948] &nbsp;
+
<br>
  
2012-01 First Optical Fiber Laser and Amplifier, 26 October 2012, Photonics Society [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:First_Optical_Fiber_Laser_and_Amplifier http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:First_Optical_Fiber_Laser_and_Amplifier]&nbsp;  
+
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;C. POTENTIAL&nbsp;MILESTONES&nbsp;BEING&nbsp;RESEARCHED&nbsp;OR EXPLORED
  
&nbsp;2011-05 Rincon del Bonete [LF] (R9 – Uruguay Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Rincon_del_Bonete_Hydroelectric_Plant_and_Transmission_System http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Rincon_del_Bonete_Hydroelectric_Plant_and_Transmission_System] &nbsp;  
+
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; '''(that&nbsp;History Center staff&nbsp;are aware of)
  
<br>
+
High performance Perpendicular Magnetic Recording, 1977
  
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; '''B.9. DEDICATIONS HELD DURING THE PREVIOUS YEAR'''
+
Cellular radio
  
2009-07 Eel River HVDC Converter (R7) 24 February 2011<br>2009-12 Mercury Spacecraft controls 24 February 2011 (R5)<br>2010-01 SPICE Circuit Simulation Program 20 February 2011 (R6)<br>2010-05 Discovery of Superconductivity 8 April 2011 (R8)<br>2008-18 Marconi’s First Wireless Experiments, 29 April 2011 (R8) <br>2010-06 Pearl Street Station, 10 May 2011 (R1)<br>2010-08 Lunar Module 20 July 2011 (R1)<br>2009-13 First Satellite Broadcast to the Public, 18 November 2011 (R10 – Tokyo Section)<br>2010-09 Real-Time Packet Switching 8 December 2011 (R1 – Sig Proc Soc.)<br>2010-02 Apollo Guidance Computer 13 December 2011 (R1 Boston Section)  
+
First All-Electronic Television Broadcasts (BBC)  
  
<br>
+
London to&nbsp;Adelaide telegraph line&nbsp;<br>  
  
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;C. POTENTIAL&nbsp;MILESTONES&nbsp;BEING&nbsp;RESEARCHED&nbsp;OR EXPLORED'''
+
Charles Kao optical fiber (R8 UKRI Section)
  
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ''''''(that&nbsp;History Center staff&nbsp;are aware of)''' High performance Perpendicular Magnetic Recording, 1977 Cellular radio First All-Electronic Television Broadcasts (BBC) London to
+
John Logie Baird television (R8 UKRI Section)  
  
Adelaide telegraph line&nbsp; Weston meters Charles Kao optical fiber (R8 UKRI Section) John Logie Baird television (R8 UKRI Section)  
+
Harrisons clock (R8 UKRI Section)  
  
Harrisons clock (R8 UKRI Section) Photovoltaic effect (R8 – France)&nbsp; Ampex (Region 6, Santa Clara Valley&nbsp;Section)<br>
+
Photovoltaic effect (R8 – France) &nbsp;<br>  
  
CP/M (Region 6, Santa Clara Valley Section)<br>
+
RCA Victor (R2 Philadelphia Section)  
  
386 Micro (Region 6, Santa Clara Valley Section)<br><br>Apple MAC+ (Region 6, Santa Clara Valley Section)<br><br>Apple I (Region 6, Santa Clara Valley Section)<br><br>Apple II (Region 6, Santa Clara Valley Section)<br><br>4004 Micro (Region 6, Santa Clara Valley Section)<br>
+
386 Micro (Region 6, Santa Clara Valley Section)<br><br>4004 Micro (Region 6, Santa Clara Valley Section)<br>  
  
 
Canadian Niagara Plant (Region 7)  
 
Canadian Niagara Plant (Region 7)  
  
Rheinfelden Hydroelectric Power Plant (Region 8)  
+
<br>Oberlin-Smith electromagnetic recording (Region 2, South Jersey&nbsp;Section) (possible ASME codesignation?)  
  
<br>
+
<br>  
  
<br>
+
<br>  
  
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; D. OTHER MILESTONES ACTIVITY'''
+
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; D. OTHER MILESTONES ACTIVITY  
  
 
[[Milestones:Milestone Guidelines and How to Propose a Milestone|Return to Milestone Program Guidelines]]
 
[[Milestones:Milestone Guidelines and How to Propose a Milestone|Return to Milestone Program Guidelines]]
  
 
[[Category:IEEE|{{PAGENAME}}]]
 
[[Category:IEEE|{{PAGENAME}}]]

Latest revision as of 19:23, 17 April 2014


REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS

Last updated: 14 April 2014

This ongoing report shows the status of Milestones in the various stages of the process, updated continually by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. Please note the titles given here are shortened or working titles, not the full or official titles. While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104   

To see a count of how many IEEE Milestones have been dedicated, click List of Milestones by Dedication Year ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

A. ADVOCATES NEEDED FOR THE FOLLOWING MILESTONES:

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted Date
2013-20 CRC102-A Activation 1954 8 Italy Section
2014-01 Mother of All Demos 6 Santa Clara Valley Section
2014-02 Zenit Three-Coordinate L-band Pulsed Radar, 1938 8 Ukraine Section 10 April 2014


B. STATUS

B.1 PROPOSALS BEING WRITTEN ON THE GHN AND AWAITING SUBMISSION

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted Date
2013-09 Mark 1 Automatic Sequence Controlled Calculator LF 1 Boston Section
2013-12 Bayer Color Filter Array DBu
2013-13 Erbium-Doped Fiber Optical Amplifier MS 8 UKRI Section
2013-20 CRC102-A Activation 1954 8 Italy Section
2013-27 Stereo Sound Recording JImp 8 UKRI Section
2013-31 Weston Meter EMat 1 North New Jersey Section
2014-01 Mother of All Demos 6 Santa Clara Valley Section

B.2. PROPOSALS SUBMITTED AWAITING ADVOCATE APPROVAL

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted Date
2013-07 Cruft High Tension Laboratory JCM 1 Boston Section 28 March 2014
2013-18 Vapor-phase Axial Deposition DBu 10 Tokyo Section 19 June 2013
2013-19 Virginia Smith HVDC Converter GC 5 Denver Section 10 February 2014
2013-29 Middle and Upper Atmosphere Radar EM 10 Kansai Section 25 February 2014
2014-02 Zenit Three-Coordinate L-band Pulsed Radar, 1938 8 Ukraine Section 10 April 2014

B.3. PROPOSALS APPROVED BY ADVOCATES AND AWAITING FINALIZED CITATIONS APPROVAL FROM PROPOSERS

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted Date
2013-24 ASCII TB 1 New Jersey Coast Section 3 April 2014
2014-03 TAT-8 Fiber Optic Cable TB 2 New Jersey Coast Section 3 April 2014

B.4. PROPOSALS READY FOR HISTORY COMMITTEE ACTION

Docket Number Short Name Advocate initials Region Sponsoring Org Unit
2013-15 Interactive Video Games AM 1 New Hampshire Section

B.5.1 PROPOSALS APPROVED BY HISTORY COMMITTEE READY FOR BOARD OF DIRECTORS ACTION

(The schedule for upcoming Board of Directors meetings can be found in the right hand column of  http://www.ieee.org/about/corporate/board/index.html or at Upcoming Series )  

Docket Number Short Name Advocate initials Region Sponsoring Org Unit
2012-05 Bell Laboratories Inc., The First 60 Years DMi 1 North New Jersey Section
2013-03 First Breaking of Enigma Code by Polish Cipher Bureau IE 8 Poland Section
2013-06 SPARC RISC Architecture F-AH 6 Santa Clara Valley Section
2013-16 First RISC Mircoprocessor F-AH 6 Oakland East Bay Section
2013-22 Introduction of Apple II Computer EJ 6 Santa Clara Valley Section
2013-25 TPC-1 Transpacific Cable HK 10 Tokyo Section
2103-26 Hertz Generation of Electromagnetic Waves MSch 8 Germany Section
2013-28 Apple I Computer EJo 6 Santa Clara Valley

B.6. DEDICATIONS BEING PLANNED, ALL APPROVALS HAVING BEEN RECEIVED

Docket Number Short Name Region Sponsoring Org Unit Dedication Date
2012-06 High Temperature Superconductivity GCo 5 Houston Section
2012-07 Line Spectrum Pair Technology for Speech Coding 10 Tokyo Section 22 May 2014
2013-01 Gapless Metal Oxide Surge Arrester 10 Tokyo Section 18 August 2014
2013-04 Sharp Thin-Film Transistor LCD 10 Kansai Section 10 June 2014
2013-08 Birthplace of Silicon Valley TB 6 Santa Clara Valley Section TBD
2013-10 20-inch Diameter Photomultiplier Tubes SMiz 10 Nagoya Section TBD
2013-11 Ampex Videorecorder LL 6 TBD
2013-17 Rheinfelden Hydroelectric Power Plant 8 Germany Section/Power Eng. Soc. 25 September 2014
2013-21 First Blind Flight 1 Long Island Section 24 September 2014
2013-23 CPM Operating System 1974 6 Santa Clara Valley Section 25 April 2014

B.7 DEDICATIONS HELD

 For a list by dedication date of all IEEE Milestones dedicated from the beginning of the Milestone Program, see List of Milestones by Dedication Year


For a list of dedicated Milestones in chronological order by date of achievement, see Chronological List of Milestones

For a list of dedicated Milestones by Region, see List of Dedicated Milestones by Region


                                           C. POTENTIAL MILESTONES BEING RESEARCHED OR EXPLORED

                                                                  (that History Center staff are aware of)

High performance Perpendicular Magnetic Recording, 1977

Cellular radio

First All-Electronic Television Broadcasts (BBC)

London to Adelaide telegraph line 

Charles Kao optical fiber (R8 UKRI Section)

John Logie Baird television (R8 UKRI Section)

Harrisons clock (R8 UKRI Section)

Photovoltaic effect (R8 – France)  

RCA Victor (R2 Philadelphia Section)

386 Micro (Region 6, Santa Clara Valley Section)

4004 Micro (Region 6, Santa Clara Valley Section)

Canadian Niagara Plant (Region 7)


Oberlin-Smith electromagnetic recording (Region 2, South Jersey Section) (possible ASME codesignation?)



                                                         D. OTHER MILESTONES ACTIVITY

Return to Milestone Program Guidelines