Milestones:Milestones Status Report: Difference between revisions

From ETHW
No edit summary
No edit summary
 
(394 intermediate revisions by 4 users not shown)
Line 1: Line 1:
'''REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS'''
__NOTOC__


'''Last updated: 6 March 2013'''
=== For the Milestone Status report, see [http://ieeemilestones.ethw.org/Milestones_Status_Report http://ieeemilestones.ethw.org/Milestones_Status_Report] ===


This is an ongoing report showing the status of Milestones in the various stages of the process, updated continually by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. ''Please note the titles given here are shortened or working titles, '''not''' the full or official titles. ''While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 The nominations in progress can be viewed at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=106
[[Category:IEEE]]
 
   ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
 
Total dedicated milestones: 130, dedicated special citations: 1
 
Total Approved milestones: 131, approved special citations: 1
 
'''A. ADVOCATES NEEDED FOR THE FOLLOWING MILESTONES:'''
 
2013-05 (R7, Vancouver Section) First Digitally Processed SAR Image [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Digitally_Processed_Image_from_a_Spaceborne_Synthetic_Aperture_Radar http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Digitally_Processed_Image_from_a_Spaceborne_Synthetic_Aperture_Radar]  
 
<br>
 
2013-06 SPARC&nbsp;RISC Architecture (Region 6, Santa Clara Valley&nbsp;Section)[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:SPARC_RISC_Architecture_Introduction,_1987 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:SPARC_RISC_Architecture_Introduction,_1987] <br>
 
'''B. STATUS'''
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; '''B.1 Proposals Being Written on the GHN and Awaiting Submission'''
 
2013-03 First Breaking of Enigma Code by Polish Cipher Bureau [IE] (Region 8) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_First_Breaking_of_Enigma_Code_by_the_Team_of_Polish_Cipher_Bureau%2C_1932-39 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_First_Breaking_of_Enigma_Code_by_the_Team_of_Polish_Cipher_Bureau%2C_1932-39] &nbsp;
 
2013-04 Sharp Thin-Film Transistor LCD [HK]&nbsp;(Region 10, Kansai Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Sharp_14-inch_thin-film-transistor_liquid-crystal_display_%28TFT-LCD%29_for_TV%2C_which_has_ushered_in_TFT_LCD_industry http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Sharp_14-inch_thin-film-transistor_liquid-crystal_display_%28TFT-LCD%29_for_TV%2C_which_has_ushered_in_TFT_LCD_industry]
 
<br>
 
&nbsp;
 
<br><br>
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.2. Proposals&nbsp;Submitted Awaiting Advocate Approval'''
 
2011-06 First Industrial Scale Nuclear Reactor [EJ] (Region 6 Richland Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Industrial_Scale_Nuclear_Reactor http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Industrial_Scale_Nuclear_Reactor]
 
&nbsp;&nbsp;
 
2012-06 High Temperature Superconductivity [GC] (Region 5 Houston Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity]
 
2012-07 Line Spectrum Pair Technology for Speech Coding [MS] (Region 10, Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975] &nbsp;
 
<br>
 
<br>
 
<br>2013-01 Gapless Metal Oxide Surge Arrester [DB] (Region 10 Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975] &nbsp;
 
<br>
 
<br>
 
2013-02 Unidirectional Microphone [APY] (Region 4 Chicago Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Unidirectional_Microphone http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Unidirectional_Microphone]&nbsp;&nbsp;
 
2013-05 (Region 7, Vancouver Section) First Digitally Processed SAR Image [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Digitally_Processed_Image_from_a_Spaceborne_Synthetic_Aperture_Radar http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Digitally_Processed_Image_from_a_Spaceborne_Synthetic_Aperture_Radar] &nbsp;
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.3.&nbsp;Proposals Approved by Advocates and Awaiting Finalized Citations Approval from Proposers'''
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
 
<br>'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.4.&nbsp;Proposals Ready for History Committee Action'''
 
2011-07 First Laptop Computer [APY] (Region 10 – Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985 www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985] &nbsp;
 
2012-04 First AIEE Technical Meeting [DBar] (Region 2 -- Philadelphia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Technical_Meeting_of_AIEE_1884 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Technical_Meeting_of_AIEE_1884] &nbsp;
 
2012-05 Bell Laboratories Inc., The First 60 Years [DM] (Region 1 North New Jersey Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984] &nbsp;
 
<br>2012-03 Krka-Sibenik Power System [EJ] (Region 8 Croatia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System] &nbsp;
 
<br><br>'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.5.&nbsp;Proposals Ready for Board of Directors Action'''
 
<br>
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.6. Dedications Scheduled or Being Planned, all Approvals Having Been Received'''
 
<br>&nbsp; 2012-02 Invention of Holography, 12 June 2013&nbsp;(Region 8, UKRI Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Invention_of_Holography_by_Dennis_Gabor http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Invention_of_Holography_by_Dennis_Gabor]&nbsp;&nbsp;&nbsp;
 
<br>
 
<br>
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;B.8. DEDICATIONS HELD IN&nbsp;2012''' (For a list of all Milestones dedicated, see [[Milestones:List of IEEE Milestones|List of Dedicated Milestones]] )
 
2010-04 Field Effect Electron Microscope, 31 January 2012 (R10 -- Tokyo)
 
2010-03 G3 Facsimile, 5 April 2012 (R10 – Tokyo Section)
 
2011-09 Low Loss Optical Fiber, 1 May 2012 (R1 -- Photonics Society)
 
2011-02 B&amp;O Railroad electrification 21 June 2012 (R2 – Baltimore Section)
 
2010-10 LORAN, 27 June 2012 (R1 – Boston Section)
 
2010-11 Whirlwind Computer 27 June 2012 (R1 – Boston Section)
 
2011-04 SAGE system, 27 June 2012 (R1 – Boston Section)
 
2009-09 First Reliable HV Fuse, 3 August 2012 (R4 – Chicago Section)
 
2011-08 Floating Gate EEPROM, 21 August 2012 (R6, Santa Clara Valley Section)<br>
 
2009-05 Bose experiments in radio, 15 September 2012 (R10 – Central India)
 
<br>
 
2009-04 Raman Effect, 15 September 2012 (R10 – Central India Section)
 
2009-06 Bar Code, 22 October 2012 (R2 Philadelphia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Birthplace_of_the_Bar_Code,_1948 http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Birthplace_of_the_Bar_Code,_1948] &nbsp;
 
2012-01 First Optical Fiber Laser and Amplifier, 26 October 2012, Photonics Society [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:First_Optical_Fiber_Laser_and_Amplifier http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:First_Optical_Fiber_Laser_and_Amplifier]&nbsp;
 
&nbsp;2011-05 Rincon del Bonete [LF] (R9 – Uruguay Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Rincon_del_Bonete_Hydroelectric_Plant_and_Transmission_System http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Rincon_del_Bonete_Hydroelectric_Plant_and_Transmission_System] &nbsp;
 
<br>
 
<br><br>
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; '''B.9. DEDICATIONS HELD DURING THE PREVIOUS YEAR'''
 
2009-07 Eel River HVDC Converter (R7) 24 February 2011<br>2009-12 Mercury Spacecraft controls 24 February 2011 (R5)<br>2010-01 SPICE Circuit Simulation Program 20 February 2011 (R6)<br>2010-05 Discovery of Superconductivity 8 April 2011 (R8)<br>2008-18 Marconi’s First Wireless Experiments, 29 April 2011 (R8) <br>2010-06 Pearl Street Station, 10 May 2011 (R1)<br>2010-08 Lunar Module 20 July 2011 (R1)<br>2009-13 First Satellite Broadcast to the Public, 18 November 2011 (R10 – Tokyo Section)<br>2010-09 Real-Time Packet Switching 8 December 2011 (R1 – Sig Proc Soc.)<br>2010-02 Apollo Guidance Computer 13 December 2011 (R1 Boston Section)
 
<br>
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;C. POTENTIAL&nbsp;MILESTONES&nbsp;BEING&nbsp;RESEARCHED&nbsp;OR EXPLORED'''
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ''''''(that&nbsp;History Center staff&nbsp;are aware of)'''
 
<br>High performance Photomultiplier Tube (PMT) and Related Products Hamamatsu Photonics developed the largest PMT for the Nobel prized KAMIOKANDE and other applications. (R 10)
 
Perpendicular Magnetic Recording, 1977
 
Cellular radio
 
First All-Electronic Television Broadcasts (BBC)
 
London to Adelaide telegraph line&nbsp;
 
Weston meters
 
Charles Kao optical fiber (R8 UKRI Section)
 
John Logie Baird television (R8 UKRI Section)
 
<br>
 
Harrisons clock (R8 UKRI Section)
 
<br>
 
Photovoltaic effect (R8 – France)&nbsp;
 
Ampex (Region 6, Santa Clara Valley&nbsp;Section)<br>CP/M (Region 6, Santa Clara Valley Section)<br><br>&nbsp;SPARC (Region 6, Santa Clara Valley Section)<br><br>&nbsp;386 Micro (Region 6, Santa Clara Valley Section)<br><br>&nbsp;Apple MAC+ (Region 6, Santa Clara Valley Section)<br><br>&nbsp;Apple I (Region 6, Santa Clara Valley Section)<br><br>&nbsp;Apple II (Region 6, Santa Clara Valley Section)<br><br>&nbsp;4004 Micro (Region 6, Santa Clara Valley Section)<br><br>Shockley Labs (Region 6, Santa Clara Valley Section)<br>
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; D. OTHER MILESTONES ACTIVITY'''
 
<br>[[Milestones:Milestone Guidelines and How to Propose a Milestone|Return to Milestone Program Guidelines]]
 
[[Category:IEEE|{{PAGENAME}}]]

Latest revision as of 15:46, 9 May 2016


For the Milestone Status report, see http://ieeemilestones.ethw.org/Milestones_Status_Report