Milestones:Milestones Status Report: Difference between revisions

From ETHW
No edit summary
No edit summary
Line 1: Line 1:
'''REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL PROCESS'''  
'''REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL PROCESS'''  


'''Last updated: 5 March 2012'''  
'''Last updated: 23 March 2012'''  


This is an ongoing report showing the status of Milestones in the various stages of the process. It will be continually updated by IEEE History Center staff. Milestones are listed with their docket numbers, and the IEEE Region, and the sponsoring organizational unit are shown in parentheses. While in the approval process, proposals and nominations have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 The nominations in progress can be viewed at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=106  
This is an ongoing report showing the status of Milestones in the various stages of the process. It will be continually updated by IEEE History Center staff. Milestones are listed with their docket numbers, and the IEEE Region, and the sponsoring organizational unit are shown in parentheses. While in the approval process, proposals and nominations have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 The nominations in progress can be viewed at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=106  
Line 57: Line 57:
2009-05 Bose experiments in radio (R10 – Central India)  
2009-05 Bose experiments in radio (R10 – Central India)  


2009-06 Bar Code, April 2012 (R2 Philadelphia Section)  
2010-03 G3 Facsimile, 5 April 2012 (R10 – Tokyo Section)  


2010-03 G3 Facsimile 5 April 2012 (R10 – Tokyo Section)  
2009-06 Bar Code, 30 April 2012 (R2 Philadelphia Section)  


2010-10 LORAN (R1 – Boston Section)  
2011-09 Low Loss Optical Fiber, 1 May 2012 (R1 -- Photonics Society)  


2010-11 Whirlwind Computer (R1 Boston Section)  
2011-02 B&O Railroad electrification 21 June 2012 (R2 Baltimore Section)  


2011-02 B&O Railroad electrification 21 June 2012 (R2 Baltimore Section)  
2010-10 LORAN, 27 June 2012 (R1 Boston Section)  


2011-04 SAGE system (R1 – Boston Section)  
2010-11 Whirlwind Computer 27 June 2012 (R1 – Boston Section)  


2011-09 Low Loss Optical Fiber, 1 May 2012 (R1 -- Photonics Society)  
2011-04 SAGE system, 27 June 2012 (R1 – Boston Section)  


<br>
<br>
Line 77: Line 77:
2010-04 Field Effect Electron Microscope 31 January 2012 (R10 -- Tokyo)  
2010-04 Field Effect Electron Microscope 31 January 2012 (R10 -- Tokyo)  


<br>


 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; '''B.9. DEDICATIONS HELD DURING THE PREVIOUS YEAR'''  
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; '''B.9. DEDICATIONS HELD DURING THE PREVIOUS YEAR'''


2009-07 Eel River HVDC Converter (R7) 24 February 2011<br>2009-12 Mercury Spacecraft controls 24 February 2011 (R5)<br>2010-01 SPICE Circuit Simulation Program 20 February 2011 (R6)<br>2010-05 Discovery of Superconductivity 8 April 2011 (R8)<br>2008-18 Marconi’s First Wireless Experiments, 29 April 2011 (R8) <br>2010-06 Pearl Street Station, 10 May 2011 (R1)<br>2010-08 Lunar Module 20 July 2011 (R1)<br>2009-13 First Satellite Broadcast to the Public, 18 November 2011 (R10 – Tokyo Section)<br>2010-09 Real-Time Packet Switching 8 December 2011 (R1 – Sig Proc Soc.)<br>2010-02 Apollo Guidance Computer 13 December 2011 (R1 Boston Section)  
2009-07 Eel River HVDC Converter (R7) 24 February 2011<br>2009-12 Mercury Spacecraft controls 24 February 2011 (R5)<br>2010-01 SPICE Circuit Simulation Program 20 February 2011 (R6)<br>2010-05 Discovery of Superconductivity 8 April 2011 (R8)<br>2008-18 Marconi’s First Wireless Experiments, 29 April 2011 (R8) <br>2010-06 Pearl Street Station, 10 May 2011 (R1)<br>2010-08 Lunar Module 20 July 2011 (R1)<br>2009-13 First Satellite Broadcast to the Public, 18 November 2011 (R10 – Tokyo Section)<br>2010-09 Real-Time Packet Switching 8 December 2011 (R1 – Sig Proc Soc.)<br>2010-02 Apollo Guidance Computer 13 December 2011 (R1 Boston Section)  

Revision as of 13:57, 23 March 2012

REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL PROCESS

Last updated: 23 March 2012

This is an ongoing report showing the status of Milestones in the various stages of the process. It will be continually updated by IEEE History Center staff. Milestones are listed with their docket numbers, and the IEEE Region, and the sponsoring organizational unit are shown in parentheses. While in the approval process, proposals and nominations have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 The nominations in progress can be viewed at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=106

Total dedicated milestones: 117, dedicated special citations: 1

Total Approved milestones: 128, approved special citations: 1

                                       A. ADVOCATES NEEDED FOR THE FOLLOWING MILESTONES:

(none currently needed)


                                        B. STATUS (Independent of whether or not Advocate assigned)

                                        B.1. Proposals Received Awaiting Approval

2011-06 First Industrial Scale Nuclear Reactor [EJ] (R6 Richland Section)

2012-01 First Optical Fiber Laser and Amplifier [DM] Photonics Society

                                        B.2. Proposals Approved; Awaiting Nomination Packages

2011-01 High-Temperature Superconductivity [DB] (R8 – Switzerland Section)

2011-05 Rincon del Bonete [LF] (R9 – Uruguay Section)

2011-07 First Laptop Computer [APZ] (R10 – Tokyo Section)

                                          B.3. Nominations Awaiting Advocate Approval


          B.4. Nominations Approved by Advocates and Awaiting Finalized Citations Approval from Nominators


                                    B.5. Nominations Ready for History Committee Action


                               B.6. Nominations Ready for Board of Directors Action

2011-03 Bell Laboratories [AM] (R1 – New Jersey Section)

2011-08 Data Storage Flash Memory [EJ] (R6 – Santa Clara Valley Section)


                       B.7. Dedications Scheduled or Being Planned, all Approvals Having Been Received

2009-09 First Reliable HV Fuse (R4 – Chicago Section)

2009-04 Raman Effect (R10 – Central India Section)

2009-05 Bose experiments in radio (R10 – Central India)

2010-03 G3 Facsimile, 5 April 2012 (R10 – Tokyo Section)

2009-06 Bar Code, 30 April 2012 (R2 Philadelphia Section)

2011-09 Low Loss Optical Fiber, 1 May 2012 (R1 -- Photonics Society)

2011-02 B&O Railroad electrification 21 June 2012 (R2 – Baltimore Section)

2010-10 LORAN, 27 June 2012 (R1 – Boston Section)

2010-11 Whirlwind Computer 27 June 2012 (R1 – Boston Section)

2011-04 SAGE system, 27 June 2012 (R1 – Boston Section)


                 B.8. DEDICATIONS HELD IN 2012 (For a list of all Milestones dedicated, see List of Dedicated Milestones )

2010-04 Field Effect Electron Microscope 31 January 2012 (R10 -- Tokyo)


                   B.9. DEDICATIONS HELD DURING THE PREVIOUS YEAR

2009-07 Eel River HVDC Converter (R7) 24 February 2011
2009-12 Mercury Spacecraft controls 24 February 2011 (R5)
2010-01 SPICE Circuit Simulation Program 20 February 2011 (R6)
2010-05 Discovery of Superconductivity 8 April 2011 (R8)
2008-18 Marconi’s First Wireless Experiments, 29 April 2011 (R8)
2010-06 Pearl Street Station, 10 May 2011 (R1)
2010-08 Lunar Module 20 July 2011 (R1)
2009-13 First Satellite Broadcast to the Public, 18 November 2011 (R10 – Tokyo Section)
2010-09 Real-Time Packet Switching 8 December 2011 (R1 – Sig Proc Soc.)
2010-02 Apollo Guidance Computer 13 December 2011 (R1 Boston Section)


                                           C. MILESTONES UNDER DEVELOPMENT

                C.1. Proposals in Process, but Which Have Not Been Completed/Submitted

Harrison’s Clock (R8- UKRI)

Invention of Holography (R8 -- UKRI) Snitzer Fiber Optic Laser

                       C.2. Proposals Under Development (that we are aware of)

Perpendicular Magnetic Recording, 1977

Cellular radio

First All-Electronic Television Broadcasts (BBC)

Keage Hydroelectric Power Plant, 1891

London to Adelaide telegraph line 

Weston meters

Semiconductor Laser (Schenectady)

Photovoltaic effect (R8 – France) 

                                                         D. OTHER MILESTONES ACTIVITY

First AIEE meeting, Philadelphia (History Center staff has submitted application for Pennsylvania State Historical Marker, decision expected end of March)


Return to Milestone Program Guidelines