'''REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS'''  
'''REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS'''  


'''Last updated: 10 April 2013'''  
'''Last updated: 28 August 2014'''  
 
This is an ongoing report showing the status of Milestones in the various stages of the process, updated continually by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. ''Please note the titles given here are shortened or working titles, '''not''' the full or official titles. ''While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: [http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104] The nominations in progress can be viewed at: [http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=106 http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=106]
 
   ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
 
Total dedicated milestones: 130, dedicated special citations: 1
 
Total Approved milestones: 131, approved special citations: 1
 
'''                                           A. ADVOCATES NEEDED FOR THE FOLLOWING MILESTONES:'''
 
2013-06 SPARC RISC Architecture (Region 6, Santa Clara Valley Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:SPARC_RISC_Architecture_Introduction,_1987 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:SPARC_RISC_Architecture_Introduction,_1987]<br>
 
 
 
2013-07 Birthplace of Silicon Valley (Region 6, Santa Clara Valley Section)&nbsp;<br> '''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B. STATUS'''
 
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; '''B.1 Proposals Being Written on the GHN and Awaiting Submission'''
 
2013-03 First Breaking of Enigma Code by Polish Cipher Bureau [IE] (Region 8) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_First_Breaking_of_Enigma_Code_by_the_Team_of_Polish_Cipher_Bureau%2C_1932-39 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_First_Breaking_of_Enigma_Code_by_the_Team_of_Polish_Cipher_Bureau%2C_1932-39] &nbsp;
 
&nbsp;
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.2. Proposals&nbsp;Submitted Awaiting Advocate Approval'''
 
2011-06 First Industrial Scale Nuclear Reactor [EJ] (Region 6 Richland Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Industrial_Scale_Nuclear_Reactor http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Industrial_Scale_Nuclear_Reactor]
 
<br>
 
2012-05 Bell Laboratories Inc., The First 60 Years [DM] (Region 1 North New Jersey Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984] &nbsp;


&nbsp;  
This ongoing report shows the status of Milestones in the various stages of the process, updated continually by IEEE&nbsp;History Center staff. Milestones are listed&nbsp;with their docket numbers. The&nbsp;IEEE Region and the sponsoring organizational unit are shown in parentheses. ''Please note the titles given here&nbsp;are shortened or working titles, '''not''' the full or official titles. ''While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets.&nbsp;Proposals in progress can be viewed on the IEEE Global History Network at: [http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&amp;from=&amp;namespace=104]&nbsp;&nbsp;&nbsp;  


2012-06 High Temperature Superconductivity [GC] (Region 5 Houston Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity]  
To see a count of how many IEEE Milestones have been dedicated, click [[Milestones:List of Milestones by Dedication Year|List of Milestones by Dedication Year]] ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++


<br>
== A. ADVOCATES NEEDED FOR THE FOLLOWING MILESTONES:  ==


2013-01 Gapless Metal Oxide Surge Arrester [DB] (Region 10 Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975]&nbsp;&nbsp;
{| border="1" cellspacing="1" cellpadding="1" width="600"
|-
| '''Docket Number'''
| '''Short Name'''
| '''Advocate initials'''
| '''Region'''
| '''Sponsoring Org Unit'''
| '''Submitted Date'''
|-
| 2014-07
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Enrico_Fermi%27s_major_contribution_to_semiconductor_statistics%2C_Florence%2C_Italy%2C_1926  Fermi Semiconductor Statistics, 1926]
| ADVOCATE NEEDED
|8
|Italy Section
| 24 July 2014
|-
|2014-08
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Hollow_dielectric_beam_waveguide_of_sub-millimeter_wavelength_range%2C_1966  Hollow dielectric beam waveguide, 1966]
|ADVOCATE NEEDED
|8
|Ukraine Section
|
|}


<br>
== B. STATUS  ==


2013-07 Cruft High Tension Laboratory [JCM] (Region 1, Boston Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Cruft_HighTension_Laboratory,_Harvard_School_of_Engineering_and_Applied_Science http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Cruft_HighTension_Laboratory,_Harvard_School_of_Engineering_and_Applied_Science] &nbsp;
=== B.1 PROPOSALS BEING WRITTEN ON THE GHN AND AWAITING SUBMISSION  ===


&nbsp;
{| border="1" cellspacing="1" cellpadding="1" width="600"
|-
| '''Docket Number'''
| '''Short Name'''
| '''Advocate initials'''
| '''Region'''
| '''Sponsoring Org Unit'''
| '''Submitted Date'''
|-
| 2013-12
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Color_Filter_Array Bayer Color Filter Array]
| DBu
|
|
|
|-
| 2013-13
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Development_of_the_Erbium-Doped_Optical_Fiber_Amplifier Erbium-Doped Fiber Optical Amplifier]
| MS
| 8
| UKRI Section
|
|-
| 2013-20
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:CRC102-A_activated_at_Politecnico_di_Milano_by_Luigi_Dadda CRC102-A Activation 1954]
| F-AH
| 8
| Italy Section
|
|-
| 2013-31
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Weston_Meters Weston Meter]
| EMat
| 1
| North New Jersey Section
|
|-
| 2014-01
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:%22Mother_of_All_Demos%22 Mother of All Demos]
| EJ
| 6
| Santa Clara Valley Section
|
|-
| 2014-04
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Sonar%2C_100th_birthday_of_Paul_Langevin_Invention_1907-2017 Langevin Sonar, 1917]
| LF
| 8
| France Section
|
|-
| 2014-6
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Introduction_of_the_Apple_Macintosh_Computer,_1984 Macintosh Computer, 1984]
| JImp & DMi
| 6
| Santa Clara Valley Section
|
|-
|2014-08
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Hollow_dielectric_beam_waveguide_of_sub-millimeter_wavelength_range%2C_1966  Hollow dielectric beam waveguide, 1966]
|ADVOCATE NEEDED
|8
|Ukraine Section
|
|}


'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.3.&nbsp;Proposals Approved by Advocates and Awaiting Finalized Citations Approval from Proposers'''
=== B.2. PROPOSALS SUBMITTED AWAITING ADVOCATE APPROVAL  ===


<br>2012-07 Line Spectrum Pair Technology for Speech Coding [MB] (Region 10, Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975] &nbsp;
{| border="1" cellspacing="1" cellpadding="1" width="600"
|-
| '''Docket Number'''
| '''Short Name'''
| '''Advocate initials'''
| '''Region'''
| '''Sponsoring Org Unit'''
| '''Submitted Date'''
|-
| 2013-07  
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Cruft_HighTension_Laboratory,_Harvard_School_of_Engineering_and_Applied_Science Cruft High Tension Laboratory]  
| JCM
| 1
| Boston Section
| 28 March 2014
|-
| 2013-09
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Harvard_Mark_1_Computer,_1944_-_1959 Mark 1 Automatic Sequence Controlled Calculator]
| LF
| 1
| Boston Section  
| 25 March 2014
|-
| 2013-19
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Virginia_Smith_HVDC_Converter_Station_with_Integrated_AC_Voltage_Control_Function Virginia Smith HVDC Converter]
| GC
| 5
| Denver Section
| 10 February 2014
|-
| 2014-05
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Special_Citation_Computer_History_Museum Special Citation for Computer History Museum]
| JImp
| 6
| Santa Clara Valley Section
| 16 June 2014
|-
| 2014-07
|[http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Enrico_Fermi%27s_major_contribution_to_semiconductor_statistics%2C_Florence%2C_Italy%2C_1926  Fermi Semiconductor Statistics, 1926]
| ADVOCATE NEEDED
|8
|Italy Section
| 24 July 2014
|}


&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;
=== B.3.&nbsp;PROPOSALS APPROVED BY ADVOCATES AND AWAITING FINALIZED CITATIONS APPROVAL FROM PROPOSERS  ===


'''&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; B.4.&nbsp;Proposals Ready for History Committee Action'''  
{| border="1" cellspacing="1" cellpadding="1" width="600"
|-
| '''Docket Number'''
| '''Short Name'''
| '''Advocate initials'''
| '''Region'''
| '''Sponsoring Org Unit'''
| '''Submitted Date'''
|-
| 2013-27
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Improvements_in_and_relating_to_Sound-transmission,_Sound-recording_and_Sound-reproduction_systems_by_Alan_Dower_Blumlein Stereo Sound Recording]
| JImp
| 8
| UKRI Section
| 14 July 2014
|-
|   
|
|
|
|}


2013-02 Unidirectional Microphone [APY] (Region 4 Chicago Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Unidirectional_Microphone http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Unidirectional_Microphone] &nbsp;  
=== B.4.&nbsp;PROPOSALS READY FOR HISTORY COMMITTEE ACTION  ===


<br>2013-04 Sharp Thin-Film Transistor LCD [HK] (Region 10, Kansai Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Sharp_14-inch_thin-film-transistor_liquid-crystal_display_%28TFT-LCD%29_for_TV%2C_which_has_ushered_in_TFT_LCD_industry http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Sharp_14-inch_thin-film-transistor_liquid-crystal_display_%28TFT-LCD%29_for_TV%2C_which_has_ushered_in_TFT_LCD_industry]&nbsp;&nbsp;
{| border="1" cellspacing="1" cellpadding="1" width="600"
|-
| '''Docket Number'''
| '''Short Name'''
| '''Advocate initials'''
| '''Region'''
| '''Sponsoring Org Unit'''
| '''Submitted Date'''
|-
| 2014-02
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Zenit_three-coordinate_L-band_pulsed_radar,_1938 Zenit Three-Coordinate L-band Pulsed Radar, 1938]
| MSch
| 8
| Ukraine Section
| 10 April 2014
|-
| 2014-03
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Trans-Atlantic_Telephone_Fiber-optic_Submarine_Cable_(TAT-8)_-_1988 TAT-8 Fiber Optic Cable]  
| TB
| 2
| New Jersey Coast Section
| 3 April 2014
|}


<br>
=== B.5.1&nbsp;PROPOSALS APPROVED BY HISTORY COMMITTEE READY FOR BOARD OF DIRECTORS ACTION  ===


2013-05 (Region 7, Vancouver Section) [DBar] First Digitally Processed SAR Image [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Digitally_Processed_Image_from_a_Spaceborne_Synthetic_Aperture_Radar http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Digitally_Processed_Image_from_a_Spaceborne_Synthetic_Aperture_Radar] &nbsp;  
'''(The schedule for upcoming Board of Directors meetings can be found in the right hand column of &nbsp;[http://www.ieee.org/about/corporate/board/index.html http://www.ieee.org/about/corporate/board/index.html] or at [http://www.ieee.org/documents/upcoming_series.pdf Upcoming Series]&nbsp;) &nbsp;'''


<br> '''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.5.&nbsp;Proposals Ready for Board of Directors Action'''  
{| border="1" cellspacing="1" cellpadding="1" width="600"
|-
| '''Docket Number'''
| '''Short Name'''
| '''Advocate initials'''
| '''Region'''
| '''Sponsoring Org Unit'''
| '''Submitted Date'''
|-
| 2013-15
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Interactive_Video_Games Interactive Video Games]
| AM
| 1
| New Hampshire Section
| 25 October 2013
|-
| 2013-18
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Invention_and_development_of_vapor-phase_axial_deposition_(VAD)_method_for_mass_production_of_high-quality_optical_fiber_for_telecommunication Vapor-phase Axial Deposition]
| DBu
| 10
| Tokyo Section
| 19 June 2013
|-
| 2013-24
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:ASCII_MIlestone_-_IEEE_NJ_Coast_Section ASCII]
| TB
| 1
| New Jersey Coast Section
| 3 April 2014
|-
| 2013-29
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_MU_%28Middle_and_Upper_atmosphere%29_radar%2C_1984 Middle and Upper Atmosphere Radar]
| EO
| 10
| Kansai Section
| 25 February 2014
|}


2011-07 Pioneering Laptop Computer [APY] (Region 10 – Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985 www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985] &nbsp;
=== B.6. DEDICATIONS BEING PLANNED, ALL APPROVALS HAVING BEEN RECEIVED  ===


<br>
{| border="1" cellspacing="1" cellpadding="1" width="600"
|-
| '''Docket Number'''
| '''Short Name'''
|
| '''Region'''
| '''Sponsoring Org Unit'''
| '''Dedication Date'''
|-
| 2012-05
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984 Bell Laboratories Inc., The First 60 Years]
| DMi
| 1
| North New Jersey Section
| TBD
|-
| 2012-06
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity High Temperature Superconductivity]
| GCo
| 5
| Houston Section
| 17 November 2014
|-
| 2013-06
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:SPARC_RISC_Architecture_Introduction,_1987 SPARC RISC Architecture]
| F-AH
| 6
| Santa Clara Valley Section
| 13 February 2015
|-
| 2013-08
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_Birthplace_of_Silicon_Valley Birthplace of Silicon Valley]
| TB
| 6
| Santa Clara Valley Section
| TBD
|-
| 2013-10
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:The_20_inch_Diameter_Photomultiplier_Tubes 20-inch Diameter Photomultiplier Tubes]
| SMiz
| 10
| Nagoya Section
| 5 November 2014
|-
| 2013-11
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Ampex_Videotape_Recorder_-_1956 Ampex Videorecorder]
| LL
| 6
|
| TBD
|-
| 2013-16
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_RISC_Microprocessor First RISC Microprocessor]
| F-AH
| 6
| Oakland East Bay Section
| 12 February 2015
|-
| 2013-17
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Rheinfelden_Hydroelectric_Power_Plant,_1898_-_2010 Rheinfelden Hydroelectric Power Plant]
|
| 8
| Germany Section/Power Eng. Soc.
| 25 September 2014
|-
| 2013-21
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Blind_Flight%3A_A_Joint_IEEE-AIAA_Milestone_Proposal First Blind Flight]
|
| 1
| Long Island Section
| 24 September 2014
|-
| 2013-22
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Introduction_of_the_Apple_II_Computer:_1977-1978 Introduction of Apple II Computer]
| EJ
| 6
| Santa Clara Valley Section
| TBD
|-
| 2013-25
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:TPC-1_System TPC-1 Transpacific Cable]
| HK
| 10
| Tokyo Section
| TBD
|-
| 2103-26
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_generation_and_experimental_proof_of_electromagnetic_waves_1886-1888. Hertz Generation of Electromagnetic Waves]
| MSch
| 8
| Germany Section
| 2 December 2014
|-
| 2013-28
| [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Introduction_of_the_Apple_I_Computer:_1976 Introduction of Apple I Computer]
| EJo
| 6
| Santa Clara Valley Section
| TBD
|}


2012-04 First AIEE Technical Meeting [DBar] (Region 2 -- Philadelphia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Technical_Meeting_of_AIEE_1884 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Technical_Meeting_of_AIEE_1884] &nbsp;
=== B.7 DEDICATIONS HELD  ===


<br>2012-03 Krka-Sibenik Power System [EJ] (Region 8 Croatia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System] &nbsp;
&nbsp;For a list by dedication date of all IEEE Milestones dedicated from the beginning of the Milestone Program, see [[Milestones:List of Milestones by Dedication Year|List of Milestones by Dedication Year]]  


<br>  
<br> For a list of dedicated Milestones in chronological order by date of achievement, see [[Milestones:List of IEEE Milestones|Chronological List of Milestones]]
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.6. Dedications Scheduled or Being Planned, all Approvals Having Been Received'''


<br>2012-02 Invention of Holography, 12 June 2013&nbsp;(Region 8, UKRI Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Invention_of_Holography_by_Dennis_Gabor http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Invention_of_Holography_by_Dennis_Gabor]&nbsp;&nbsp;&nbsp;
For a list of dedicated Milestones by Region, see [[Milestones:List of Milestones by Region|List of Dedicated Milestones by Region]]  


<br>  
<br>  


'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;B.8. DEDICATIONS HELD IN&nbsp;2012''' (For a list of all Milestones dedicated, see [[Milestones:List of IEEE Milestones|List of Dedicated Milestones]] )
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;C. POTENTIAL&nbsp;MILESTONES&nbsp;BEING&nbsp;RESEARCHED&nbsp;OR EXPLORED
 
2010-04 Field Effect Electron Microscope, 31 January 2012 (R10 -- Tokyo)


2010-03 G3 Facsimile, 5 April 2012 (R10 – Tokyo Section)  
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; '''(that&nbsp;History Center staff&nbsp;are aware of)  


2011-09 Low Loss Optical Fiber, 1 May 2012 (R1 -- Photonics Society)
High performance Perpendicular Magnetic Recording, 1977


2011-02 B&amp;O Railroad electrification 21 June 2012 (R2 – Baltimore Section)
Cellular radio


2010-10 LORAN, 27 June 2012 (R1 – Boston Section)  
First All-Electronic Television Broadcasts (BBC)  


2010-11 Whirlwind Computer 27 June 2012 (R1 – Boston Section)
London to&nbsp;Adelaide telegraph line&nbsp;<br>


2011-04 SAGE system, 27 June 2012 (R1 – Boston Section)  
Charles Kao optical fiber (R8 UKRI Section)  


2009-09 First Reliable HV Fuse, 3 August 2012 (R4 – Chicago Section)  
John Logie Baird television (R8 UKRI Section)  


2011-08 Floating Gate EEPROM, 21 August 2012 (R6, Santa Clara Valley Section)<br>
Harrisons clock (R8 UKRI Section)  


2009-05 Bose experiments in radio, 15 September 2012 (R10 Central India)  
Photovoltaic effect (R8 France) &nbsp;<br>


2009-04 Raman Effect, 15 September 2012 (R10 – Central India Section)  
RCA Victor (R2 Philadelphia Section)  


2009-06 Bar Code, 22 October 2012 (R2 Philadelphia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Birthplace_of_the_Bar_Code,_1948 http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Birthplace_of_the_Bar_Code,_1948] &nbsp;
386 Micro (Region 6, Santa Clara Valley Section)<br><br>4004 Micro (Region 6, Santa Clara Valley Section)<br>


2012-01 First Optical Fiber Laser and Amplifier, 26 October 2012, Photonics Society [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:First_Optical_Fiber_Laser_and_Amplifier http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:First_Optical_Fiber_Laser_and_Amplifier]&nbsp;
Canadian Niagara Plant (Region 7)


&nbsp;2011-05 Rincon del Bonete [LF] (R9 – Uruguay Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Rincon_del_Bonete_Hydroelectric_Plant_and_Transmission_System http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Rincon_del_Bonete_Hydroelectric_Plant_and_Transmission_System] &nbsp;
<br>Oberlin-Smith electromagnetic recording (Region 2, South Jersey&nbsp;Section) (possible ASME codesignation?)  


<br>  
<br>  
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; '''B.9. DEDICATIONS HELD DURING THE PREVIOUS YEAR'''
2009-07 Eel River HVDC Converter (R7) 24 February 2011<br>2009-12 Mercury Spacecraft controls 24 February 2011 (R5)<br>2010-01 SPICE Circuit Simulation Program 20 February 2011 (R6)<br>2010-05 Discovery of Superconductivity 8 April 2011 (R8)<br>2008-18 Marconi’s First Wireless Experiments, 29 April 2011 (R8) <br>2010-06 Pearl Street Station, 10 May 2011 (R1)<br>2010-08 Lunar Module 20 July 2011 (R1)<br>2009-13 First Satellite Broadcast to the Public, 18 November 2011 (R10 – Tokyo Section)<br>2010-09 Real-Time Packet Switching 8 December 2011 (R1 – Sig Proc Soc.)<br>2010-02 Apollo Guidance Computer 13 December 2011 (R1 Boston Section)


<br>  
<br>  


'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;C. POTENTIAL&nbsp;MILESTONES&nbsp;BEING&nbsp;RESEARCHED&nbsp;OR EXPLORED'''
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; D. OTHER MILESTONES ACTIVITY  
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ''''''(that&nbsp;History Center staff&nbsp;are aware of)''' High performance Photomultiplier Tube (PMT) and Related Products Hamamatsu Photonics developed the largest PMT for the Nobel prized KAMIOKANDE and other applications. (R 10)
 
Perpendicular Magnetic Recording, 1977 Cellular radio First All-Electronic Television Broadcasts (BBC) London to
 
Adelaide telegraph line&nbsp; Weston meters Charles Kao optical fiber (R8 UKRI Section) John Logie Baird television (R8 UKRI Section)
 
Harrisons clock (R8 UKRI Section) Photovoltaic effect (R8 – France)&nbsp; Ampex (Region 6, Santa Clara Valley&nbsp;Section)<br>
 
CP/M (Region 6, Santa Clara Valley Section)<br>
 
SPARC (Region 6, Santa Clara Valley Section)<br><br>386 Micro (Region 6, Santa Clara Valley Section)<br><br>Apple MAC+ (Region 6, Santa Clara Valley Section)<br><br>Apple I (Region 6, Santa Clara Valley Section)<br><br>Apple II (Region 6, Santa Clara Valley Section)<br><br>4004 Micro (Region 6, Santa Clara Valley Section)<br><br>Shockley Labs (Region 6, Santa Clara Valley Section)
 
'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; D. OTHER MILESTONES ACTIVITY'''


[[Milestones:Milestone Guidelines and How to Propose a Milestone|Return to Milestone Program Guidelines]]
[[Milestones:Milestone Guidelines and How to Propose a Milestone|Return to Milestone Program Guidelines]]


[[Category:IEEE|{{PAGENAME}}]]
[[Category:IEEE|{{PAGENAME}}]]

Revision as of 15:51, 28 August 2014


REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS

Last updated: 28 August 2014

This ongoing report shows the status of Milestones in the various stages of the process, updated continually by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. Please note the titles given here are shortened or working titles, not the full or official titles. While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104   

To see a count of how many IEEE Milestones have been dedicated, click List of Milestones by Dedication Year ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

A. ADVOCATES NEEDED FOR THE FOLLOWING MILESTONES:

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted Date
2014-07 Fermi Semiconductor Statistics, 1926 ADVOCATE NEEDED 8 Italy Section 24 July 2014
2014-08 Hollow dielectric beam waveguide, 1966 ADVOCATE NEEDED 8 Ukraine Section

B. STATUS

B.1 PROPOSALS BEING WRITTEN ON THE GHN AND AWAITING SUBMISSION

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted Date
2013-12 Bayer Color Filter Array DBu
2013-13 Erbium-Doped Fiber Optical Amplifier MS 8 UKRI Section
2013-20 CRC102-A Activation 1954 F-AH 8 Italy Section
2013-31 Weston Meter EMat 1 North New Jersey Section
2014-01 Mother of All Demos EJ 6 Santa Clara Valley Section
2014-04 Langevin Sonar, 1917 LF 8 France Section
2014-6 Macintosh Computer, 1984 JImp & DMi 6 Santa Clara Valley Section
2014-08 Hollow dielectric beam waveguide, 1966 ADVOCATE NEEDED 8 Ukraine Section

B.2. PROPOSALS SUBMITTED AWAITING ADVOCATE APPROVAL

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted Date
2013-07 Cruft High Tension Laboratory JCM 1 Boston Section 28 March 2014
2013-09 Mark 1 Automatic Sequence Controlled Calculator LF 1 Boston Section 25 March 2014
2013-19 Virginia Smith HVDC Converter GC 5 Denver Section 10 February 2014
2014-05 Special Citation for Computer History Museum JImp 6 Santa Clara Valley Section 16 June 2014
2014-07 Fermi Semiconductor Statistics, 1926 ADVOCATE NEEDED 8 Italy Section 24 July 2014

B.3. PROPOSALS APPROVED BY ADVOCATES AND AWAITING FINALIZED CITATIONS APPROVAL FROM PROPOSERS

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted Date
2013-27 Stereo Sound Recording JImp 8 UKRI Section 14 July 2014

B.4. PROPOSALS READY FOR HISTORY COMMITTEE ACTION

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted Date
2014-02 Zenit Three-Coordinate L-band Pulsed Radar, 1938 MSch 8 Ukraine Section 10 April 2014
2014-03 TAT-8 Fiber Optic Cable TB 2 New Jersey Coast Section 3 April 2014

B.5.1 PROPOSALS APPROVED BY HISTORY COMMITTEE READY FOR BOARD OF DIRECTORS ACTION

(The schedule for upcoming Board of Directors meetings can be found in the right hand column of  http://www.ieee.org/about/corporate/board/index.html or at Upcoming Series )  

Docket Number Short Name Advocate initials Region Sponsoring Org Unit Submitted Date
2013-15 Interactive Video Games AM 1 New Hampshire Section 25 October 2013
2013-18 Vapor-phase Axial Deposition DBu 10 Tokyo Section 19 June 2013
2013-24 ASCII TB 1 New Jersey Coast Section 3 April 2014
2013-29 Middle and Upper Atmosphere Radar EO 10 Kansai Section 25 February 2014

B.6. DEDICATIONS BEING PLANNED, ALL APPROVALS HAVING BEEN RECEIVED

Docket Number Short Name Region Sponsoring Org Unit Dedication Date
2012-05 Bell Laboratories Inc., The First 60 Years DMi 1 North New Jersey Section TBD
2012-06 High Temperature Superconductivity GCo 5 Houston Section 17 November 2014
2013-06 SPARC RISC Architecture F-AH 6 Santa Clara Valley Section 13 February 2015
2013-08 Birthplace of Silicon Valley TB 6 Santa Clara Valley Section TBD
2013-10 20-inch Diameter Photomultiplier Tubes SMiz 10 Nagoya Section 5 November 2014
2013-11 Ampex Videorecorder LL 6 TBD
2013-16 First RISC Microprocessor F-AH 6 Oakland East Bay Section 12 February 2015
2013-17 Rheinfelden Hydroelectric Power Plant 8 Germany Section/Power Eng. Soc. 25 September 2014
2013-21 First Blind Flight 1 Long Island Section 24 September 2014
2013-22 Introduction of Apple II Computer EJ 6 Santa Clara Valley Section TBD
2013-25 TPC-1 Transpacific Cable HK 10 Tokyo Section TBD
2103-26 Hertz Generation of Electromagnetic Waves MSch 8 Germany Section 2 December 2014
2013-28 Introduction of Apple I Computer EJo 6 Santa Clara Valley Section TBD

B.7 DEDICATIONS HELD

 For a list by dedication date of all IEEE Milestones dedicated from the beginning of the Milestone Program, see List of Milestones by Dedication Year


For a list of dedicated Milestones in chronological order by date of achievement, see Chronological List of Milestones

For a list of dedicated Milestones by Region, see List of Dedicated Milestones by Region


                                           C. POTENTIAL MILESTONES BEING RESEARCHED OR EXPLORED

                                                                  (that History Center staff are aware of)

High performance Perpendicular Magnetic Recording, 1977

Cellular radio

First All-Electronic Television Broadcasts (BBC)

London to Adelaide telegraph line 

Charles Kao optical fiber (R8 UKRI Section)

John Logie Baird television (R8 UKRI Section)

Harrisons clock (R8 UKRI Section)

Photovoltaic effect (R8 – France)  

RCA Victor (R2 Philadelphia Section)

386 Micro (Region 6, Santa Clara Valley Section)

4004 Micro (Region 6, Santa Clara Valley Section)

Canadian Niagara Plant (Region 7)


Oberlin-Smith electromagnetic recording (Region 2, South Jersey Section) (possible ASME codesignation?)



                                                         D. OTHER MILESTONES ACTIVITY

Return to Milestone Program Guidelines