Milestones:Milestones Status Report: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
'''REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS''' | '''REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS''' | ||
'''Last updated: | '''Last updated: 16 January 2012''' | ||
This is an ongoing report showing the status of Milestones in the various stages of the process. It will be continually updated by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. ''Please note the titles given here are shortened or working titles, '''not''' the full or official titles. ''While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 The nominations in progress can be viewed at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=106 | This is an ongoing report showing the status of Milestones in the various stages of the process. It will be continually updated by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. ''Please note the titles given here are shortened or working titles, '''not''' the full or official titles. ''While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 The nominations in progress can be viewed at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=106 | ||
Line 19: | Line 19: | ||
<br> | <br> | ||
'''B. STATUS''' | |||
'''B.1 Proposals Being Written on the GHN and Awaiting Submission''' | |||
2012-06 High Temperature Superconductivity (R5 Houston Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity] | |||
2012-07 Line Spectrum Pair Technology for Speech Coding (R10 Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975] | |||
2013-01 Gapless Metal Oxide Surge Arrester (R10 Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975] | |||
''' B.2. Proposals Received Awaiting Advocate Approval''' | |||
2011-06 First Industrial Scale Nuclear Reactor [EJ] (R6 Richland Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Industrial_Scale_Nuclear_Reactor http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Industrial_Scale_Nuclear_Reactor] | |||
| | ||
2012-05 Bell Laboratories Inc., The First 60 Years [DM] (R1 North New Jersey Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984] | |||
<br> | |||
<br>''' B. | ''' '''<br>''' B.3. Proposals Approved by Advocates and Awaiting Finalized Citations Approval from Proposers''' | ||
2012-03 Krka-Sibenik Power System [EJ] (R8 Croatia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System] <br> | 2012-03 Krka-Sibenik Power System [EJ] (R8 Croatia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System] <br> | ||
''' B. | ''' B.4. Proposals Ready for History Committee Action''' | ||
2011-07 First Laptop Computer [APY] (R10 – Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985 www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985] | 2011-07 First Laptop Computer [APY] (R10 – Tokyo Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985 www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985] | ||
Line 51: | Line 55: | ||
2012-04 First AIEE Technical Meeting [DBar] (R2 -- Philadelphia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Technical_Meeting_of_AIEE_1884 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Technical_Meeting_of_AIEE_1884] | 2012-04 First AIEE Technical Meeting [DBar] (R2 -- Philadelphia Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Technical_Meeting_of_AIEE_1884 http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Technical_Meeting_of_AIEE_1884] | ||
<br><br>''' B. | <br><br>''' B.5. Proposals Ready for Board of Directors Action''' | ||
<br> | <br> | ||
''' B. | ''' B.6. Dedications Scheduled or Being Planned, all Approvals Having Been Received''' | ||
<br> 2012-02 Invention of Holography (R8, UKRI Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Invention_of_Holography_by_Dennis_Gabor http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Invention_of_Holography_by_Dennis_Gabor] (tentative dedication date: late June 2013) | <br> 2012-02 Invention of Holography (R8, UKRI Section) [http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Invention_of_Holography_by_Dennis_Gabor http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Invention_of_Holography_by_Dennis_Gabor] (tentative dedication date: late June 2013) | ||
Line 105: | Line 109: | ||
<br> | <br> | ||
''' C. | ''' C. POTENTIAL MILESTONES BEING RESEARCHED OR EXPLORED''' | ||
''' ''''''(that History Center staff are aware of)''' | |||
<br>High performance Photomultiplier Tube (PMT) and Related Products Hamamatsu Photonics developed the largest PMT for the Nobel prized KAMIOKANDE and other applications. (R 10) | |||
Perpendicular Magnetic Recording, 1977 | Perpendicular Magnetic Recording, 1977 |
Revision as of 14:25, 16 January 2013
REPORT ON THE STATUS OF MILESTONES IN SUBMISSION/APPROVAL/DEDICATION PROCESS
Last updated: 16 January 2012
This is an ongoing report showing the status of Milestones in the various stages of the process. It will be continually updated by IEEE History Center staff. Milestones are listed with their docket numbers. The IEEE Region and the sponsoring organizational unit are shown in parentheses. Please note the titles given here are shortened or working titles, not the full or official titles. While in the approval process, proposals have a History Committee advocate assigned to them, whose initials are given in brackets. Proposals in progress can be viewed on the IEEE Global History Network at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=104 The nominations in progress can be viewed at: http://www.ieeeghn.org/wiki/index.php?title=Special%3AAllpages&from=&namespace=106
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Total dedicated milestones: 130, dedicated special citations: 1
Total Approved milestones: 131, approved special citations: 1
A. ADVOCATES NEEDED FOR THE FOLLOWING MILESTONES:
2012-06 High Temperature Superconductivity (R5 Houston Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity
2012-07 Line Spectrum Pair Technology for Speech Coding (R10 Tokyo Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975
B. STATUS
B.1 Proposals Being Written on the GHN and Awaiting Submission
2012-06 High Temperature Superconductivity (R5 Houston Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:High_Temperature_Superconductivity
2012-07 Line Spectrum Pair Technology for Speech Coding (R10 Tokyo Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Line_spectrum_pair_(LSP),_an_essential_technology_for_high-compression_speech_coding,_1975
2013-01 Gapless Metal Oxide Surge Arrester (R10 Tokyo Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Gapless_Metal_Oxide_Surge_Arrester_(MOSA)_for_electric_power_systems,1975
B.2. Proposals Received Awaiting Advocate Approval
2011-06 First Industrial Scale Nuclear Reactor [EJ] (R6 Richland Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Industrial_Scale_Nuclear_Reactor
2012-05 Bell Laboratories Inc., The First 60 Years [DM] (R1 North New Jersey Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:Bell_Telephone_Laboratories%2C_Inc.%2C_the_First_60_Years%2C_1925-1984
B.3. Proposals Approved by Advocates and Awaiting Finalized Citations Approval from Proposers
2012-03 Krka-Sibenik Power System [EJ] (R8 Croatia Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System
B.4. Proposals Ready for History Committee Action
2011-07 First Laptop Computer [APY] (R10 – Tokyo Section) www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Toshiba_T1100%2C_a_pioneering_contribution_to_the_development_of_laptop_PC%2C_1985
2012-04 First AIEE Technical Meeting [DBar] (R2 -- Philadelphia Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Proposal:First_Technical_Meeting_of_AIEE_1884
B.5. Proposals Ready for Board of Directors Action
B.6. Dedications Scheduled or Being Planned, all Approvals Having Been Received
2012-02 Invention of Holography (R8, UKRI Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Invention_of_Holography_by_Dennis_Gabor (tentative dedication date: late June 2013)
B.8. DEDICATIONS HELD IN 2012 (For a list of all Milestones dedicated, see List of Dedicated Milestones )
2010-04 Field Effect Electron Microscope, 31 January 2012 (R10 -- Tokyo)
2010-03 G3 Facsimile, 5 April 2012 (R10 – Tokyo Section)
2011-09 Low Loss Optical Fiber, 1 May 2012 (R1 -- Photonics Society)
2011-02 B&O Railroad electrification 21 June 2012 (R2 – Baltimore Section)
2010-10 LORAN, 27 June 2012 (R1 – Boston Section)
2010-11 Whirlwind Computer 27 June 2012 (R1 – Boston Section)
2011-04 SAGE system, 27 June 2012 (R1 – Boston Section)
2009-09 First Reliable HV Fuse, 3 August 2012 (R4 – Chicago Section)
2011-08 Floating Gate EEPROM, 21 August 2012 (R6, Santa Clara Valley Section)
2009-05 Bose experiments in radio, 15 September 2012 (R10 – Central India)
2009-04 Raman Effect, 15 September 2012 (R10 – Central India Section)
2009-06 Bar Code, 22 October 2012 (R2 Philadelphia Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Birthplace_of_the_Bar_Code,_1948
2012-01 First Optical Fiber Laser and Amplifier, 26 October 2012, Photonics Society http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:First_Optical_Fiber_Laser_and_Amplifier
2011-05 Rincon del Bonete [LF] (R9 – Uruguay Section) http://www.ieeeghn.org/wiki/index.php/Milestone-Nomination:Rincon_del_Bonete_Hydroelectric_Plant_and_Transmission_System
B.9. DEDICATIONS HELD DURING THE PREVIOUS YEAR
2009-07 Eel River HVDC Converter (R7) 24 February 2011
2009-12 Mercury Spacecraft controls 24 February 2011 (R5)
2010-01 SPICE Circuit Simulation Program 20 February 2011 (R6)
2010-05 Discovery of Superconductivity 8 April 2011 (R8)
2008-18 Marconi’s First Wireless Experiments, 29 April 2011 (R8)
2010-06 Pearl Street Station, 10 May 2011 (R1)
2010-08 Lunar Module 20 July 2011 (R1)
2009-13 First Satellite Broadcast to the Public, 18 November 2011 (R10 – Tokyo Section)
2010-09 Real-Time Packet Switching 8 December 2011 (R1 – Sig Proc Soc.)
2010-02 Apollo Guidance Computer 13 December 2011 (R1 Boston Section)
C. POTENTIAL MILESTONES BEING RESEARCHED OR EXPLORED
' '(that History Center staff are aware of)
High performance Photomultiplier Tube (PMT) and Related Products Hamamatsu Photonics developed the largest PMT for the Nobel prized KAMIOKANDE and other applications. (R 10)
Perpendicular Magnetic Recording, 1977
Cellular radio
First All-Electronic Television Broadcasts (BBC)
London to Adelaide telegraph line
Weston meters
Charles Kao optical fiber (R8 UKRI Section)
John Logie Baird television (R8 UKRI Section)
Harrisons clock (R8 UKRI Section)
Photovoltaic effect (R8 – France)
D. OTHER MILESTONES ACTIVITY