Milestones:Kurobe River No. 4 Hydropower Plant, 1956-63

From ETHW
Revision as of 14:17, 12 April 2010 by Administrator4 (talk | contribs)
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Kurobe River No. 4 Hydropower Plant, 1956-63

Kansai Electric Power Co., Inc., completed the innovative Kurobe River No. 4 Hydropower Plant, including the subterranean power station and Kurobe Dam, in 1963. The 275kV long-distance transmission system delivered the generated electric power to the Kansai region and solved serious power shortages, contributing to industrial development and enhancing living standards for the population.

 Location(s) of Milestone plaque(s):
(i) At the entrance of the Kurobe River No.4 Hydropower Plant:
Address: Unazuki-machi, Kurobe-shi, Toyama, 938-0200 Japan
GPS: N 36.64486 E 137.68964
(ii) In front of the Kurobe Dam:
Address: Ashikuraji, Tateyama-machi, Nakaniikawa-gun, Toyama, 930-1406 Japan
GPS: N 36.56644 E 137.66213