Development of Croatian Power System.pdf
Hydro Power Plants in Croatia.pdf
Excom PES.JPG
HPP Jaruga 1 - panel.JPG
R8 director.JPG
First century of Croatian National Electric Power Utility.pdf
IEEE MILESTONE KRKA-Support Letter-Croatia Section.pdf
First century of HPP Miljacka.pdf

Start a new discussion

Contents

Thread titleRepliesLast modified
Wordsmithing218:17, 7 March 2013
Comment(s) from History Committee Member(s)001:05, 5 March 2013
My comments020:23, 4 March 2013
context of the milestone817:48, 20 February 2013

Wordsmithing

I support this milestone, but suggest the following re-wording of the citation:

At this location on 28 August 1895, the Krka hydroelectric plant began generating power for the city of Šibenik. This early system of power generation, transmission and distribution was one of the first complete multiphase alternating current systems in the world. It provided electric street lighting before many other European cities, including London and Rome. It remained in operation until World War I.

The first change was prompted by a desire to remove the passive voice (was transmitted). The second change was prompted by trying to eliminate the vague "a large number of" and provide comparative context (how did Sibenik compare with other large European cities). I took the information from the National Park web link provided. Please have someone with detailed knowledge of this site verify accuracy of my changes.

Allisonmarsh15:13, 5 March 2013
 

I full concur with the above comment, especially for the comparison with actual, well known cities. I support the proposal.

Fiorenza19:04, 5 March 2013
 

Thank you very much for your support and proposed wording.

Unfortunately I am not sure the proposed change is the best choice. The change in the first proposed sentence slightly changes the focus of the milestone and I do not believe the third sentence to be true.

There were several cities in Europe that had (some form of) electric street lighting prior to 1895. The city of Rijeka, for example, as early as 1884 for the premiere of Aida (needs verification). Rome, as another example, had a single-phase system (from the same manufacturer) before Šibenik was electrified.

The point of this milestone is to recognise the complete power system: its power generation, transmission (from the plant to the city), voltage transformation (six transformers in the city), distribution (within the city, after the voltage transformation), and consumption (street lamps).

Just a note: today’s modern power systems are multiphase alternating current systems (although with a different number of phases and different frequencies from the 1895 Krka-Šibenik system).

Thank you,

Marko Delimar

161.53.66.4118:17, 7 March 2013
 
 

Comment(s) from History Committee Member(s)

As an early urban power system, using then current and emerging technologies, the Krka–Šibenik Electric Power System appears to be worthy of recognized as an IEEE Milestone.

Tbickart01:05, 5 March 2013
 
 

My comments

No comment.

Ggcooke20:23, 4 March 2013
 
 

context of the milestone


Development of Croatian Power System.pdf
Hydro Power Plants in Croatia.pdf
Excom PES.JPG
HPP Jaruga 1 - panel.JPG
R8 director.JPG
First century of Croatian National Electric Power Utility.pdf
IEEE MILESTONE KRKA-Support Letter-Croatia Section.pdf

Tonydavies15:27, 8 July 2012
 

 Regarding the issue of "1914" v. "World War I," the specific year should not be specified until it can be confirmed. It's quite likely that the station was not shut and scavenged for metals until later in the war.


Alexander Magoun, Ph.D., Outreach Historian, IEEE History Center