Milestone-Proposal:LORAN: Difference between revisions

From ETHW
(Article updated via HTTP request)
(Article updated via HTTP request)
Line 64: Line 64:
" The crews of loran stations varied somewhat in size, depending on their locations. They have averaged about fifteen men. As the stations had to be entirely self-sufficient, they had cooks, hospital corpsmen, in addition to the electronic technicians who operated and maintained the transmitters. Each station was commanded by a commissioned officer, usually a lieutenant, with a chief petty officer as second in command. Prospective commanding officers were given a short training course in loran and administration before assignment. Many young men dreaded loran duty because of the isolation, but after it is over, nearly all of them felt it had been well worthwhile. At isolated stations, tours of duty were for one year. The great majority of loran stations were supplied with fuel, bulky spare parts, and large staple items by a Coast Guard supply ship, which called once or twice a year. Unless they were located near a large community, loran stations received mail; personnel, fresh stores, and emergency spare parts by Coast Guard airplane. Most stations had their own airstrip." (*)
" The crews of loran stations varied somewhat in size, depending on their locations. They have averaged about fifteen men. As the stations had to be entirely self-sufficient, they had cooks, hospital corpsmen, in addition to the electronic technicians who operated and maintained the transmitters. Each station was commanded by a commissioned officer, usually a lieutenant, with a chief petty officer as second in command. Prospective commanding officers were given a short training course in loran and administration before assignment. Many young men dreaded loran duty because of the isolation, but after it is over, nearly all of them felt it had been well worthwhile. At isolated stations, tours of duty were for one year. The great majority of loran stations were supplied with fuel, bulky spare parts, and large staple items by a Coast Guard supply ship, which called once or twice a year. Unless they were located near a large community, loran stations received mail; personnel, fresh stores, and emergency spare parts by Coast Guard airplane. Most stations had their own airstrip." (*)


5. Training operators and navigators: A great number of radio operators and technicians from the US and other countries had to be trained on how to operate the new navigation transmitters. Equally important, navigators aboard ships and aircrafts had to learn a whole new way of doing things to find their position.|a7=It should be noted at this time, that the radio navigation Loran project  was not carried out at the iconic "Radiation Laboratory" building home of radar / microwave innovations. Instead, the project engineering team worked in the Hood Building in Cambridge, close to but off  the MIT campus.  Further research will be carried out to locate this building. Rad Lab was awarded an IEEE Milestone ..........
5. Training operators and navigators: A great number of radio operators and technicians from the US and other countries had to be trained on how to operate the new navigation transmitters. Equally important, navigators aboard ships and aircrafts had to learn a whole new way of doing things to find their position.|a7=The Hood building is not a suitable place for the proposed IEEE plaque. Instead, the loran milestone plaque could probably be mounted alongside the other IEEE milestone plaques at MIT Building N42, 211 Massachusetts Avenue. The Boston Milestone Committee will seek their approval from MIT and proceed accordingly. |a8=No|a9=The proposed plaque would be be wall-mounted outdoors,  probably attached to  MIT Building N42, alongside other plaques at 211 Massachusetts Avenue.  The plaque would be readily visible to pedestrians walking on this public sidewalk. |a10=MIT|a11=No|a12=The Boston Section with support from local  Society Chapters, and financial contributions from sponsors.|a13name=Bruce Hecht|a13section=Boston|a13position=2010 Chair|a13email=Bruce Hecht|a14name=Robert Alongi|a14ou=Boston Section|a14position=Section Business Manager|a14email=sec.boston@ieee.org|a15Aname=Gilmore Cooke|a15Aemail=gilcooke@ieee.org|a15Aname2=|a15Aemail2=|a15Bname=c/o Robert Alongi|a15Bemail=sec.boston@ieee.org|a15Bname2=To be assigned later|a15Bemail2=|a15Cname=Gilmore Cooke|a15Ctitle=retired PE|a15Corg=Boston Section Executive Committee|a15Caddress=8 Canvasback, W. Yarmouth, MA 02673|a15Cphone=617-759-4271|a15Cemail=gilcooke@ieee.org}}<br>[[Media:Pierce_Loran.pdf|Pierce Loran.pdf]]<br>[[Media:Loran1.jpg_.png|Loran1.jpg .png]]<br>[[Media:Loran_chart.png|Loran_chart.png]]  
The proposed milestone plaque could be mounted on MIT Building N42, on Massachusetts Avenue, close to where the original Hood Building used to be. The Boston Section Milestone Committee is currently seeking approval from MIT to carry this out
 
Boston Section Milestone History  Committee is currently seeking approval from MIT to carry this out.|a8=No|a9=The proposed plaque would be be wall-mounted outdoors,  probably attached to  MIT Building N42, alongside other plaques at 211 Massachusetts Avenue.  The plaque would be readily visible to pedestrians walking on this public sidewalk. The Boston Section Milestone Committee is currently seeking approval from MIT to carry this out|a10=MIT|a11=No|a12=The Boston Section with support from local  Society Chapters, and financial contributions from sponsors.|a13name=Bruce Hecht|a13section=Boston|a13position=2010 Chair|a13email=Bruce Hecht|a14name=Robert Alongi|a14ou=Boston Section|a14position=Section Business Manager|a14email=sec.boston@ieee.org|a15Aname=Gilmore Cooke|a15Aemail=gilcooke@ieee.org|a15Aname2=|a15Aemail2=|a15Bname=c/o Robert Alongi|a15Bemail=sec.boston@ieee.org|a15Bname2=To be assigned later|a15Bemail2=|a15Cname=Gilmore Cooke|a15Ctitle=retired PE|a15Corg=Boston Section Executive Committee|a15Caddress=8 Canvasback, W. Yarmouth, MA 02673|a15Cphone=617-759-4271|a15Cemail=gilcooke@ieee.org}}<br>[[Media:Pierce_Loran.pdf|Pierce Loran.pdf]]<br>[[Media:Loran1.jpg_.png|Loran1.jpg .png]]<br>[[Media:Loran_chart.png|Loran_chart.png]]  






This is a test&nbsp;
This is a test&nbsp;

Revision as of 00:47, 15 December 2010

This Proposal has not been submitted and may only be edited by the original author.
Pierce Loran.pdf
Loran1.jpg .png
Loran_chart.png


This is a test