Milestone-Proposal:LORAN: Difference between revisions
From ETHW
(Article updated via HTTP request) |
(Article updated via HTTP request) |
||
Line 1: | Line 1: | ||
{{ProposalEdit|a1=LORAN|a2a=Cambridge MA|a2b=Boston Section|a3=1940 to 2010|a4=Long lasting near global radio navigation system. | {{ProposalEdit|a1=LORAN|a2a=Cambridge MA|a2b=Boston Section|a3=1940 to 2010|a4=Long lasting near global radio navigation system. | ||
Timeline 1940 to about 1945. why limited | Timeline 1940 to about 1945. why limited | ||
System Description | System Description | ||
Refer to Pierce article | Refer to Pierce article | ||
Insert a few drawings / illustrations.... | |||
First LORAN signal began transmissions during the summer 1941. New LORAN transmitting stations were added around the Atlantic coast throughout WW2 and the continental United States. The LORAN-C system became obsolete, replaced by GPS navigation system and the LORAN system was terminated in a special ceremony orchestrated by USGC Washington headquarters in 8 February 2010.theHow the LORAN project was initiated, organized and managed is very interested, if not note worthy. | First LORAN signal began transmissions during the summer 1941. New LORAN transmitting stations were added around the Atlantic coast throughout WW2 and the continental United States. The LORAN-C system became obsolete, replaced by GPS navigation system and the LORAN system was terminated in a special ceremony orchestrated by USGC Washington headquarters in 8 February 2010.theHow the LORAN project was initiated, organized and managed is very interested, if not note worthy. | ||
Rapid construction under extreme weather conditions. System operation by operators from different nations: US, Canada and Denmark. Collaborative effort. MIT Lab was initially responsible for the entire program, but under close hands-on direction of the USCG. USGC's role increased. | Rapid construction under extreme weather conditions. System operation by operators from different nations: US, Canada and Denmark. Collaborative effort. MIT Lab was initially responsible for the entire program, but under close hands-on direction of the USCG. USGC's role increased. | ||
Line 36: | Line 34: | ||
http://www.uscg.mil/History/STATIONS/LORAN_Section_1.asp|a5=Early example of a critical war .. CRASH engineering project. | http://www.uscg.mil/History/STATIONS/LORAN_Section_1.asp|a5=Early example of a critical war .. CRASH engineering project. | ||
Global, air and ships | Global, air and ships | ||
Time was critically important, getting the radio navigation grid up and running | Time was critically important, getting the radio navigation grid up and running | ||
fast track electronic / radio navigation system | fast track electronic / radio navigation system |
Revision as of 00:28, 8 December 2010
This Proposal has not been submitted and may only be edited by the original author.