Milestone-Proposal:LORAN: Difference between revisions

From ETHW
(Article updated via HTTP request)
(Article updated via HTTP request)
Line 60: Line 60:
7. Alexander A. McKenzie, “LORAN-THE LATEST IN NAVIGATIONAL AIDS,” QST, Part I , vol. 29. pp. 12-16. December, 1945; part 2. vol. 30, pp. 54-57. January, 1946; part 3, vol. 30, pp, 62-65, February, 1946
7. Alexander A. McKenzie, “LORAN-THE LATEST IN NAVIGATIONAL AIDS,” QST, Part I , vol. 29. pp. 12-16. December, 1945; part 2. vol. 30, pp. 54-57. January, 1946; part 3, vol. 30, pp, 62-65, February, 1946


http://www.insidegnss.com/node/1806#Baseband_Technologies_Inc_|a5=The author is not aware of any stationary electrical system of such magnitude operating so reliably and globally. But this is just my own personal views...
http://www.insidegnss.com/node/1806#Baseband_Technologies_Inc_|a5=Although there were other hyperbolic air navigation system at the time, notably the British gee system, none designed nor available nor existed to aid the war effort.  he gee system was used in the UK.
 
No other system existed or was available or ready during the 1940s to support the war effort. Convoys travelling the North Atlantic Atlantic  weresafe journey ...
The extent to which Loran had been used t tis day.. evident by mariners and navigators with nautical charts.  Prevelence of nautical charts with Loran marks all over them..??
 
 
The author is not aware of any stationary electrical system of such magnitude operating so reliably and globally. But this is just my own personal views...
Early example of a critical war .. CRASH engineering project. Rapid development, large complex organizations( equipment fabrication, procurement, construction... groups
Early example of a critical war .. CRASH engineering project. Rapid development, large complex organizations( equipment fabrication, procurement, construction... groups
Global, air and shipsTime was critically important, getting the radio navigation grid up and running
Global, air and shipsTime was critically important, getting the radio navigation grid up and running
Line 76: Line 82:


Coast Guard Lt. Cmdr. L.M. Harding|a6=Location of transmitters around the world in remote wilderness areas.
Coast Guard Lt. Cmdr. L.M. Harding|a6=Location of transmitters around the world in remote wilderness areas.
Defficulties of supplying the LORAN crews
Radiation Lab and Coast Guard  &&&  personnel Defficulties of supplying the LORAN crews
 
Loran stations in Greenland, Newfoundland, and Labrador especially hard. Getting these loran stations built, staffed, and supplied was especially trying.  To get an idea as to geography, and the conditions faced by Rad Lab, Coast Guard and military personnel responsible for getting the North Atlantic Loran System , look at
 
SECTION II
 
THE NORTH ATLANTIC LORAN SYSTEM
 
CHAPTER 1
 
Site survey for Bona Vista and Battle Harbor - Results of USS MANASQUAN tests - Navy proposes seven-unit chain for North Atlantic - Preliminary training program - Boccaro and Deming under construction - Siting of #5, #6, and #7 - Equipment procurement difficulties begin.
 
CHAPTER 2
 
Construction at Bona Vista.
 
CHAPTER 3
 
Construction at Battle Harbor.
 
CHAPTER 4
 
Construction at Greenland.
 
Construction in remote areas
Construction in remote areas
Need for international cooperation - between Canada, Denmark.
Need for international cooperation - between Canada, Denmark.