== Adams Hydroelectric Generating Plant, 1895  ==
<a class="btn btn-md btn-custom" href="/Category:Computing_and_electronics">Computing and Electronics</a>
 
<a class="btn btn-md btn-custom" href="/Category:Energy">Energy</a>
Niagara Falls, NY Dedicated June 1990 - [[IEEE Buffalo Section History|IEEE Buffalo Section]]
<a class="btn btn-md btn-custom" href="/Category:Engineering_and_society">Engineering and Society</a>
 
<a class="btn btn-md btn-custom" href="/Category:Engineering_fundamentals">Engineering Fundamentals</a>
''When the Adams Plant went into operation on August 26, 1895, it represented a key victory for alternating-current systems over direct-current. The clear advantage of high voltage AC for long distance power transmission and the unprecedented size of the plant (it reached its full capacity of ten 5,000-HP [[Generators|generators]] in May 1900) influenced the future of the electrical industry worldwide.''
<a class="btn btn-md btn-custom" href="/Category:Environment">Environment</a>
 
<a class="btn btn-md btn-custom" href="/Category:Health_and_safety">Health and Safety</a>
In August 1895 the Adams No. 1 generating station of the Niagara Falls Power Company first supplied electric power to local industries in Niagara Falls, New York. This station (now demolished) was the first large-scale multiphase power station with commercial operations at Niagara Falls.
<a class="btn btn-md btn-custom" href="/Category:Materials">Materials</a>
 
<a class="btn btn-md btn-custom" href="/Category:Mechanics">Mechanics</a>
On 18 May 1910, the Niagara Transformer Station of the Hydro Electric Power Commission of Ontario began collecting power from several generating stations at Niagara Falls, Ontario and began distributing power from Niagara Falls over a network of transmission lines to loads throughout southern Ontario. It was the first time that power was distributed to an entire region over a long-distance network of high voltage transmission lines.
<a class="btn btn-md btn-custom" href="/Category:Profession">Profession</a>
 
<a class="btn btn-md btn-custom" href="/Category:Structures">Structures</a>
By these events, Niagara Falls became established internationally as the birthplace of a new electric utility industry that brought the benefits of large-scale power developments to users spread over vast areas. This arrangement for the generation, transmission and distribution of electric power departed from the prevailing approach of localized developments and formed the basis of the electric utility industry as we know it today.
<a class="btn btn-md btn-custom" href="/Category:Transportation">Transportation</a>
 
</div></div>
== Map ==
 
{{#display_map:43.081784, -79.042946~ ~ ~ ~ ~Niagara Falls, New York, U.S.A.|height=250|zoom=10|static=yes|center=43.081784, -79.042946}}
 
[[Category:Energy|{{PAGENAME}}]]

Revision as of 17:30, 6 January 2015