Milestone-Nomination:Krka – Šibenik Electric Power System

From ETHW
Revision as of 14:44, 26 April 2012 by Tcapuder (talk | contribs)


Docket Number: 2012-03

Proposal Link: https://ethw.org/Milestone-Proposal:Krka_%E2%80%93_%C5%A0ibenik_Electric_Power_System

In the space below the line, please enter your proposed citation in English, with title and text. Text absolutely limited to 70 words; 60 is preferable for aesthetic reasons. NOTE: The IEEE History Committee shall have final determination on the wording of the citation

Krka-Šibenik Electric Power System
On 28 August 1895 electricity generated at this location was transmitted to the city of Šibenik, where six power transformers supplied a large number of street lamps. This early system of power generation, transmission and distribution was one of the first complete multiphase alternating current systems in the world and it remained in operation until World War I.




Please also include references and full citations, and include supporting material in an electronic format (GIF, JPEG, PNG, PDF, DOC) which can be made available on the IEEE History Center’s Web site to historians, scholars, students, and interested members of the public. All supporting materials must be in English, or if not in English, accompanied by an English translation. If you are including images or photographs as part of the supporting material, it is necessary that you list the copyright owner.

In the space below the line, please describe the historic significance of this work: its importance to the evolution of electrical and computer engineering and science and its importance to regional/national/international development.





What features or characteristics set this work apart from similar achievements?


Please attach a letter in English, or with English translation, from the site owner giving permission to place IEEE milestone plaque on the property.

The letter is necessary in order to process your nomination form. Click the Attachments tab to upload your letter.