| − | + | <p>Previous: [[Early Electrification of Buffalo: Hydroelectric Reorganization to Increase Efficiency|Page 10 of 14: Early Electrification of Buffalo: Hydroelectric Reorganization to Increase Efficiency]]</p> | |
| − | + | <p>An October 1921 Buffalo General Electric magazine called ‘The Welder’ states that 25-Hz service for power was generally available in all parts of the City. Other types of service were confined to certain sections of the City as shown in Figures 11.1, 11.2, 11.3 & 11.4:<sup>i</sup> </p> | |
| − | + | <p>[[Image:11-154 25 Hz service cropped.GIF|thumb|left|Figure 11.1 Availability of 25 Hz Service for Lighting (principally for residential) confined primarily to the northwest section of the City]] </p> | |
| − | + | <p>[[Image:11-156 DC Edison Service. cropped.GIF|thumb|right|Figure 11.3 Availability of Direct Current (Edison System (110/220-V) confined to the Downtown Business District)]] </p> | |
| − | + | <p>[[Image:11-155 60.5 Hz service cropped.GIF|thumb|center|Figure 11.2 Availability of 62 1/2 -Hz Service for Lighting and Small Power (less than 50-hp) confined to the southeast section of the City.]] </p> | |
| − | + | <p>[[Image:11-157 DC 500 V cropped.GIF|thumb|left|Figure 11.4 Availability of Direct Current 500-V (principally for elevators)]] </p> | |
| − | + | <p><br> </p> | |
| − | + | <p><br> </p> | |
| − | + | <p>This 1921 magazine also noted “only 61% of the employees of the B. G. E. Company live in wired homes.”<sup>ii</sup> </p> | |
| − | + | <p><br> [[Image:11-158 Gas Streetlight cropped.GIF|thumb|right|Figure 11.5 Gas Streetlight]] </p> | |
| − | + | <p>In 1923 Buffalo General Electric started a project in Buffalo of installing electric streetlights to replace 10,000 gaslights like the one shown in Figure 11.5 with a two-piece cast iron standard.<sup>iii</sup> While many of the cast iron gas standards were converted to electric streetlights, most were replaced with the type standard shown in Figure 11.6. </p> | |
| − | + | <p>[[Image:11-159 Electric Streelight cropped.GIF|thumb|center|Figure 11.6 Electric Streelight (with a cast iron base and a fluted sheet steel column)]] </p> | |
| − | + | <p><br> </p> | |
| − | + | <p>[[Image:11-160 map of source stations cropped.GIF|thumb|left|150x200px|Figure 11.7 Map of Source Stations (from top to bottom: Huntley Station and Terminal Station C, Terminal House A, Terminal House B)]] </p> | |
| − | + | <p>[[Image:11-161 Terminal Station D.GIF|thumb|right|100x75px|Figure 11.8 Terminal Station D]] </p> | |
| − | + | <p>Note that all the power supplied to the City of Buffalo was from facilities located in the northwest sector of the City [Fig. 11.7]. This required a very extensive 11,000-V and 22,000-V cable system to distribute power to the distribution stations and customers scattered around the City. To supplement these sources, 60,000-V to 22,000-V Terminal Station D was built on Bailey Avenue south of William and placed in service July 1926 [Fig. 11.8]. A double-circuit 60,000-V overhead transmission line from Terminal Station C supplied Terminal Station D. 22,000-V cables were installed to pickup substations and customers in the southeast section of the City.<sup>iv</sup> </p> | |
| − | + | <p><br> <br> </p> | |
| − | + | <p><br> <br> </p> | |
| − | 170 The City of Buffalo’s Col. Ward Pumping Station at the foot of Porter Avenue kept these huge steam pumps in reserve until about 1970. Electric pumps are in the foreground. | + | <p><br> <br> </p> |
| + | |||
| + | <p><br><br> </p> | ||
| + | |||
| + | <p><br> </p> | ||
| + | |||
| + | <p>Distribution substations No. 16 through No. 20 were built for 22,000 V. </p> | ||
| + | |||
| + | <p>[[Image:11-162 Station 16.GIF|thumb|left|Figure 11.9 Station 16 on Main north of Hertel]] </p> | ||
| + | |||
| + | <p><br> [[Image:11-164 Station 18.GIF|thumb|right|Figure 11.11 Station 18 on Sumner & West Shore]] </p> | ||
| + | |||
| + | <p>[[Image:11-163 station 17.GIF|thumb|center|Figure 11.10 Station 17 on Ohio & Childs]] </p> | ||
| + | |||
| + | <p>[[Image:11-165 Station 19.GIF|thumb|left|Figure 11.12 Station 19 on Lee & Prenatt (no photo available)]] </p> | ||
| + | |||
| + | <p>[[Image:11-166 Station 20.GIF|thumb|right|figure 11.13 Station 20 on Kenmore north of Vulcan]] </p> | ||
| + | |||
| + | <p>Synchronous condensers for power factor correction were installed in several stations. A synchronous condenser is a synchronous motor running at no load with the field adjusted so the armature takes a leading current. </p> | ||
| + | |||
| + | <p>Not all businesses were sold on central station electric service. </p> | ||
| + | |||
| + | <p>For example the author was told the Ellicott Square building [Fig11.14] generated electricity in the winter when they operated steam boilers for heating, and purchased electricity from Buffalo General Electric in the summer.<sup>v </sup><br> </p> | ||
| + | |||
| + | <p>[[Image:12-167 Ellicott Sq. Bldg.GIF|thumb|left|Figure 11.14 Ellicott Square Building]] </p> | ||
| + | |||
| + | <p>[[Image:12-168 Larkin Co cropped.GIF|thumb|right|Figure 11.15] Larkin Co.]]The Larkin Company [Fig. 11.15]did not stop generating electricity until 1930.<sup>vi</sup> </p> | ||
| + | |||
| + | <p>[[Image:12-169 Hotel Statler.GIF|thumb|left|Figure 11.16 Hotel Statler]] </p> | ||
| + | |||
| + | <p>Hotel Statler [Fig. 11.16], which was built in 1923, used reciprocating steam engine driven ammonia compressors for air conditioning and making ice until about 1970. This required the hotel to operate steam boilers year round.<sup>vii</sup> </p> | ||
| + | |||
| + | <p>[[Image:12-170 Col. Ward Pumping Sta.GIF|thumb|right|Figure 11.17 Col. Ward Pumping Station]] </p> | ||
| + | |||
| + | <p>The City of Buffalo’s Col. Ward Pumping Station [Fig. 11.17] at the foot of Porter Avenue kept these huge steam pumps in reserve until about 1970. Electric pumps are in the foreground.<sup>viii</sup> </p> | ||
| + | |||
| + | <p><br> </p> | ||
| + | |||
| + | <p><br> </p> | ||
| + | |||
| + | <p><br> </p> | ||
| + | |||
| + | <p>Next: [[Early Electrification of Buffalo: 60-Hz Replaces 25-Hz|Part 12 of 14: Early Electrification of Buffalo: 60-Hz replaces 25-Hz]] </p> | ||
| + | |||
| + | == References<br> == | ||
| + | |||
| + | <p>i. H. B. Alverson, “Our Systems of Distribution,” ''The Welder'', Published by the Employees of the Buffalo General Electric Company, 1 No. 8 (1921):12. </p> | ||
| + | |||
| + | <p>ii. “Is Your Home Wired?” ''The Welder'', Published by the Employees of the Buffalo General Electric Company, 1, No 8, (1921):27. </p> | ||
| + | |||
| + | <p>iii. Adams, ''Niagara Power'', 2:292. </p> | ||
| + | |||
| + | <p>iv. “Happenings” (An Annual Log from the Electric Operations Department, Buffalo General Electric Company, 1926, photocopy). </p> | ||
| + | |||
| + | <p>v. Related to the author by George Adams, NMP T&D engineer, ca. 1961. </p> | ||
| + | |||
| + | <p>vi. “Larkin Company Now Uses Niagara Power,” ''Power Events'', Published by Buffalo, Niagara & Eastern Power Corporation, 5, No 2 (1930): 8. </p> | ||
| + | |||
| + | <p>vii. Author’s recollection from personal observation during work as NMP Underground Engineer. </p> | ||
| + | |||
| + | <p>viii. Author’s recollection from personal observation during work as NMP Underground Engineer.<br><br> </p> | ||
| + | |||
| + | <p></p> | ||
| + | |||
| + | <p>[[Category:Power,_energy_&_industry_application|Category:Power,_energy_&_industry_application]] [[Category:Power_generation]] [[Category:Power_distribution]]</p> | ||
Latest revision as of 17:31, 11 June 2010
This is Part 11 of a 14 part series.
Previous: Page 10 of 14: Early Electrification of Buffalo: Hydroelectric Reorganization to Increase Efficiency
An October 1921 Buffalo General Electric magazine called ‘The Welder’ states that 25-Hz service for power was generally available in all parts of the City. Other types of service were confined to certain sections of the City as shown in Figures 11.1, 11.2, 11.3 & 11.4:i
This 1921 magazine also noted “only 61% of the employees of the B. G. E. Company live in wired homes.”ii
In 1923 Buffalo General Electric started a project in Buffalo of installing electric streetlights to replace 10,000 gaslights like the one shown in Figure 11.5 with a two-piece cast iron standard.iii While many of the cast iron gas standards were converted to electric streetlights, most were replaced with the type standard shown in Figure 11.6.
Note that all the power supplied to the City of Buffalo was from facilities located in the northwest sector of the City [Fig. 11.7]. This required a very extensive 11,000-V and 22,000-V cable system to distribute power to the distribution stations and customers scattered around the City. To supplement these sources, 60,000-V to 22,000-V Terminal Station D was built on Bailey Avenue south of William and placed in service July 1926 [Fig. 11.8]. A double-circuit 60,000-V overhead transmission line from Terminal Station C supplied Terminal Station D. 22,000-V cables were installed to pickup substations and customers in the southeast section of the City.iv
Distribution substations No. 16 through No. 20 were built for 22,000 V.
Synchronous condensers for power factor correction were installed in several stations. A synchronous condenser is a synchronous motor running at no load with the field adjusted so the armature takes a leading current.
Not all businesses were sold on central station electric service.
For example the author was told the Ellicott Square building [Fig11.14] generated electricity in the winter when they operated steam boilers for heating, and purchased electricity from Buffalo General Electric in the summer.v
Hotel Statler [Fig. 11.16], which was built in 1923, used reciprocating steam engine driven ammonia compressors for air conditioning and making ice until about 1970. This required the hotel to operate steam boilers year round.vii
The City of Buffalo’s Col. Ward Pumping Station [Fig. 11.17] at the foot of Porter Avenue kept these huge steam pumps in reserve until about 1970. Electric pumps are in the foreground.viii
Next: Part 12 of 14: Early Electrification of Buffalo: 60-Hz replaces 25-Hz
References
i. H. B. Alverson, “Our Systems of Distribution,” The Welder, Published by the Employees of the Buffalo General Electric Company, 1 No. 8 (1921):12.
ii. “Is Your Home Wired?” The Welder, Published by the Employees of the Buffalo General Electric Company, 1, No 8, (1921):27.
iii. Adams, Niagara Power, 2:292.
iv. “Happenings” (An Annual Log from the Electric Operations Department, Buffalo General Electric Company, 1926, photocopy).
v. Related to the author by George Adams, NMP T&D engineer, ca. 1961.
vi. “Larkin Company Now Uses Niagara Power,” Power Events, Published by Buffalo, Niagara & Eastern Power Corporation, 5, No 2 (1930): 8.
vii. Author’s recollection from personal observation during work as NMP Underground Engineer.