171  This brings us up to 1930 when another great event took place, the start of the 60-Hz system in Western New York and the conversion from 25-Hz to 60-Hz. As outlined below, the conversion in Buffalo took 76 years. (Refer to the two-part article '25-Hz at Niagara Falls - end of an era on the Niagara Frontier' in the Jan/Feb and Mar/Apr 2008 issues of IEEE ''Power& Energy'' magazine)  
+
[[Image:13-171_25-60hz_slide_1_cropped.GIF|thumb|left|Graph of 25-Hz & 60 Hz Load]] This brings us up to 1930 when another great event took place, the start of the 60-Hz system in Western New York and the conversion from 25-Hz to 60-Hz. As outlined below, the conversion in Buffalo took 76 years. (Refer to the two-part article '25-Hz at Niagara Falls - end of an era on the Niagara Frontier' in the Jan/Feb and Mar/Apr 2008 issues of IEEE ''Power& Energy'' magazine)  
  
172 1947 - The beginning of end of the 25-Hz system when the company announced no new 25-hz customers. In 1949 the last arc lights were discontinued. They were on Main Street in downtown Buffalo .
+
[[Image:13-172_25-60hz_slide_2_cropped.GIF|thumb|right]]1947 - The beginning of end of the 25-Hz system when the company announced no new 25-hz customers. In 1949 the last arc lights were discontinued. They were on Main Street in downtown Buffalo .  
  
173 1952 - Western Division 60-Hz peak load exceeded the 25-Hz peak load. In 1956 the Buffalo downtown dc Edison System was shut down.
+
[[Image:13-173_25-60hz_slide_3_cropped.GIF|thumb|left]]1952 - Western Division 60-Hz peak load exceeded the 25-Hz peak load. In 1956 the Buffalo downtown dc Edison System was shut down.  
  
174 1956 - Schoellkopf disaster which destroyed Stations 3B and 3C. 25 Hz was still available from other sources but at a higher cost. In the 1960’s the Shredded Wheat Company in Niagara Falls was the last two-phase four-wire customer.
+
[[Image:13-174_25-60hz_slide_4_cropped.GIF|thumb|right]]1956 - Schoellkopf disaster which destroyed Stations 3B and 3C. 25 Hz was still available from other sources but at a higher cost. In the 1960’s the Shredded Wheat Company in Niagara Falls was the last two-phase four-wire customer.  
  
175 1998 - New York Public service Commission approves the elimination of the 25-Hz system by December 31, 2007. Customer contributions were required if repairs exceed $25,000. In 2002 the company initiated an incentive program that provided a limited matching grant to retrofit customer equipment for 60-Hz operation
+
[[Image:13-175_25-60hz_slide_5_cropped.GIF|thumb|left]]1998 - New York Public service Commission approves the elimination of the 25-Hz system by December 31, 2007. Customer contributions were required if repairs exceed $25,000. In 2002 the company initiated an incentive program that provided a limited matching grant to retrofit customer equipment for 60-Hz operation  
  
176 2006 - On October 12 at 8:53 pm, 66-kV transmission conductors came down during the ‘October Surprise’ snow storm. The five remaining customers elected not to contribute to the cost of repairs. Thus ended almost 110 years of 25-Hz service in Buffalo.
+
[[Image:13-176_25-60hz_slide_6_cropped.GIF|thumb|right]]2006 - On October 12 at 8:53 pm, 66-kV transmission conductors came down during the ‘October Surprise’ snow storm. The five remaining customers elected not to contribute to the cost of repairs. Thus ended almost 110 years of 25-Hz service in Buffalo.  
  
 +
<br> <pageby nominor="false" comments="false"></pageby>;
  
<pageby comments="false" nominor="false"></pageby>;
+
<br>  
 
+
+
  
 
<br>  
 
<br>  
Line 40: Line 39:
 
5 (Yes)
 
5 (Yes)
 
</rating>
 
</rating>
 +
 +
[[Category:Power%2C_energy_%26_industry_application]]
 +
[[Category:Power_systems]]
 +
[[Category:Electric_power_systems]]

Revision as of 17:46, 19 September 2008

Graph of 25-Hz & 60 Hz Load
Graph of 25-Hz & 60 Hz Load
This brings us up to 1930 when another great event took place, the start of the 60-Hz system in Western New York and the conversion from 25-Hz to 60-Hz. As outlined below, the conversion in Buffalo took 76 years. (Refer to the two-part article '25-Hz at Niagara Falls - end of an era on the Niagara Frontier' in the Jan/Feb and Mar/Apr 2008 issues of IEEE Power& Energy magazine)
1947 - The beginning of end of the 25-Hz system when the company announced no new 25-hz customers. In 1949 the last arc lights were discontinued. They were on Main Street in downtown Buffalo .
1952 - Western Division 60-Hz peak load exceeded the 25-Hz peak load. In 1956 the Buffalo downtown dc Edison System was shut down.
1956 - Schoellkopf disaster which destroyed Stations 3B and 3C. 25 Hz was still available from other sources but at a higher cost. In the 1960’s the Shredded Wheat Company in Niagara Falls was the last two-phase four-wire customer.
1998 - New York Public service Commission approves the elimination of the 25-Hz system by December 31, 2007. Customer contributions were required if repairs exceed $25,000. In 2002 the company initiated an incentive program that provided a limited matching grant to retrofit customer equipment for 60-Hz operation
2006 - On October 12 at 8:53 pm, 66-kV transmission conductors came down during the ‘October Surprise’ snow storm. The five remaining customers elected not to contribute to the cost of repairs. Thus ended almost 110 years of 25-Hz service in Buffalo.